NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 12     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      536.09      0    DUMMY
          2000.00
  208                 2000.00      536.09      1    1997 0+00 X/S 12 
            22.70
11776                 2022.70      538.59      2    MON 358 LB      12
             0.69
11775                 2023.38      538.71      3    TOP             12
             2.00
11774                 2025.38      538.98      4    C/L             12
             2.40
11773                 2027.78      538.82      5    TOP             12
             1.30
11772                 2029.08      538.31      6    .               12
             1.20
11771                 2030.28      538.06      7    .               12
             4.90
11770                 2035.18      537.38      8    .               12
             2.50
11769                 2037.68      536.76      9    .               12
             2.40
11768                 2040.08      536.56     10    .               12
             0.70
11767                 2040.78      536.41     11    .               12
             0.20
11766                 2040.98      535.32     12    .               12
             2.30
11765                 2043.28      532.58     13    TOE SLUFFBANK   12
             1.50
11764                 2044.78      532.09     14    .               12
             3.00
11763                 2047.78      531.83     15    W/L LB          12
             2.20
11762                 2049.98      531.56     16    .               12
             2.40
11761                 2052.38      530.98     17    .               12
             2.50
11760                 2054.88      530.13     18    .               12
             2.40
11759                 2057.28      529.33     19    .               12
             4.90
11758                 2062.18      527.33     20    .               12
             5.00
11757                 2067.18      526.73     21    .               12
             4.90
11756                 2072.08      525.78     22    .               12
             2.40
11755                 2074.48      525.33     23    .               12
             2.50
11754                 2076.98      525.28     24    .               12
             2.40
11753                 2079.38      525.13     25    .               12
X/S 12     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.20
11752                 2080.58      524.88     26    .               12
             1.30
11751                 2081.88      524.83     27    .               12
             9.80
11750                 2091.68      524.33     28    .               12
            12.30
11749                 2103.98      523.93     29    .               12
             7.40
11748                 2111.38      523.83     30    .               12
             7.40
11747                 2118.78      523.63     31    .               12
             4.90
11746                 2123.68      523.33     32    .               12
             4.90
11745                 2128.58      522.83     33    .               12
             2.40
11744                 2130.98      522.63     34    .               12
             2.50
11743                 2133.48      522.33     35    .               12
             2.50
11742                 2135.98      521.93     36    .               12
             2.40
11741                 2138.38      521.23     37    .               12
             2.50
11740                 2140.88      519.73     38    .               12
             2.40
11739                 2143.28      518.48     39    .               12
             4.90
11738                 2148.18      515.83     40    .               12
             2.50
11737                 2150.68      514.83     41    .               12
             4.90
11736                 2155.58      512.63     42    .               12
             2.50
11735                 2158.08      512.03     43    .               12
             2.40
11734                 2160.48      511.23     44    .               12
             2.50
11733                 2162.98      510.33     45    .               12
             2.40
11732                 2165.38      509.63     46    .               12
             2.50
11731                 2167.88      509.63     47    .               12
             2.50
11730                 2170.38      510.23     48    .               12
             1.40
11729                 2171.78      512.93     49    .               12
             1.00
11728                 2172.78      513.13     50    .               12
             2.50
X/S 12     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
11727                 2175.28      513.43     51    .               12
             2.40
11726                 2177.68      514.33     52    .               12
             2.50
11725                 2180.18      515.33     53    .               12
             2.40
11724                 2182.58      516.53     54    .               12
             2.50
11723                 2185.08      518.13     55    .               12
             1.50
11722                 2186.58      523.03     56    .               12
             1.00
11721                 2187.58      523.13     57    .               12
             9.80
11720                 2197.38      524.83     58    .               12
             2.40
11719                 2199.78      525.58     59    .               12
             2.50
11718                 2202.28      526.53     60    .               12
             2.50
11717                 2204.78      527.43     61    .               12
             2.40
11716                 2207.18      528.99     62    .               12
             2.50
11715                 2209.68      530.01     63    .               12
             2.40
11714                 2212.08      530.71     64    .               12
             2.50
11713                 2214.58      531.51     65    .               12
             0.70
11712                 2215.28      531.83     66    W/L RB          12
             1.70
11711                 2216.98      532.48     67    .               12
             1.20
11710                 2218.18      533.38     68    .               12
             0.60
11709                 2218.78      535.71     69    TOP RB          12
             1.20
11708                 2219.98      536.00     70    .               12
             2.00
11707                 2221.98      535.66     71    .               12
             2.40
11706                 2224.38      535.77     72    .               12
             1.90
11705                 2226.28      536.28     73    .               12
             4.00
11704                 2230.28      537.06     74    .               12
             0.60
11703                 2230.88      537.48     75    .               12
             3.10
11702                 2233.98      537.87     76    C/L RD ACESS    12
X/S 12     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.70
11701                 2236.68      538.50     77    MON 765 RB      12
 
JOIN  208-11701  N 3d58'35" W  236.68
