NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 7     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      536.69      0    DUMMY
          2000.00
16373                 2000.00      536.69      1    1973 0+00 X/S 7  
            24.43
11277                 2024.43      539.08      2    MON 348 LB       7
             1.57
11276                 2026.00      539.11      3    TOP DYKE         7
             3.90
11275                 2029.90      537.73      4    .                7
             2.50
11274                 2032.40      537.20      5    .                7
             7.30
11273                 2039.70      536.14      6    TOE DYKE         7
             4.90
11272                 2044.60      535.87      7    .                7
             4.90
11271                 2049.50      535.67      8    .                7
             4.90
11270                 2054.40      535.35      9    .                7
             2.50
11269                 2056.90      534.82     10    .                7
             2.40
11268                 2059.30      534.38     11    .                7
             2.50
11267                 2061.80      534.38     12    .                7
             4.90
11266                 2066.70      535.41     13    .                7
             2.50
11265                 2069.20      535.14     14    .                7
             4.40
11264                 2073.60      535.48     15    .                7
             0.50
11263                 2074.10      535.68     16    .                7
            10.80
11262                 2084.90      536.08     17    .                7
             3.90
11261                 2088.80      535.46     18    .                7
             4.90
11260                 2093.70      535.39     19    .                7
             2.40
11259                 2096.10      535.51     20    .                7
             2.50
11258                 2098.60      536.25     21    .                7
             9.80
11257                 2108.40      536.62     22    .                7
             9.80
11256                 2118.20      536.87     23    .                7
             9.80
11255                 2128.00      536.42     24    .                7
             4.90
11254                 2132.90      536.26     25    .                7
X/S 7     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.50
11253                 2135.40      536.02     26    .                7
             2.50
11252                 2137.90      534.20     27    .                7
             1.90
11251                 2139.80      532.19     28    TOE CUT          7
             0.60
11250                 2140.40      531.84     29    W/L LB           7
             2.40
11249                 2142.80      530.54     30    1.3W             7
             2.40
11248                 2145.20      529.74     31    .                7
             2.50
11247                 2147.70      528.84     32    .                7
             2.40
11246                 2150.10      527.54     33    .                7
             2.50
11245                 2152.60      525.84     34    .                7
             4.90
11244                 2157.50      523.24     35    .                7
             1.70
11243                 2159.20      522.64     36    .                7
            13.10
11242                 2172.30      522.54     37    .                7
             6.80
11241                 2179.10      521.84     38    .                7
             0.50
11240                 2179.60      522.14     39    .                7
             2.40
11239                 2182.00      522.44     40    .                7
             2.50
11238                 2184.50      522.54     41    .                7
             7.30
11237                 2191.80      522.24     42    .                7
             7.40
11236                 2199.20      520.64     43    .                7
             2.40
11235                 2201.60      520.64     44    .                7
             4.90
11234                 2206.50      521.14     45    .                7
             2.50
11233                 2209.00      521.04     46    .                7
             4.90
11232                 2213.90      520.34     47    .                7
             1.50
11231                 2215.40      520.34     48    .                7
             8.30
11230                 2223.70      521.04     49    .                7
             2.50
11229                 2226.20      521.04     50    .                7
             2.40
X/S 7     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
11228                 2228.60      521.04     51    .                7
             2.50
11227                 2231.10      520.84     52    .                7
             2.40
11226                 2233.50      520.54     53    .                7
             2.50
11225                 2236.00      519.84     54    .                7
             3.20
11224                 2239.20      518.54     55    .                7
             4.20
11223                 2243.40      518.74     56    .                7
             2.40
11222                 2245.80      518.54     57    .                7
             9.80
11221                 2255.60      516.84     58    .                7
             2.50
11220                 2258.10      516.34     59    .                7
             7.30
11219                 2265.40      514.34     60    .                7
             1.30
11218                 2266.70      514.34     61    .                7
             1.20
11217                 2267.90      514.84     62    .                7
             2.40
11216                 2270.30      517.44     63    .                7
             2.50
11215                 2272.80      518.24     64    .                7
             9.80
11214                 2282.60      521.34     65    .                7
             2.50
11213                 2285.10      522.64     66    .                7
             2.40
11212                 2287.50      525.54     67    .                7
             2.50
11211                 2290.00      528.04     68    3.8              7
             2.40
11210                 2292.40      529.04     69    2.8              7
             2.50
11209                 2294.90      530.32     70    1.52             7
             1.00
11208                 2295.90      530.79     71    1.05             7
             1.10
11207                 2297.00      531.52     72    .32              7
             1.30
11206                 2298.30      531.84     73    W/L RB           7
             2.00
11205                 2300.30      532.39     74    .                7
             0.70
11204                 2301.00      532.58     75    .                7
             1.20
11203                 2302.20      536.19     76    .                7
X/S 7     KOOTENAY RIVER     PROJECT 81-SR-01     SEPT 1981
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.50
11202                 2303.70      536.99     77    .                7
            10.80
11201                 2314.50      537.49     78    MON 347 RB       7
 
JOIN  16373-11201  S 27d53'54" E  314.50
