NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 12     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      536.09      0    DUMMY
          2000.00
  208                 2000.00      536.09      1    1997 0+00 X/S 12 
             5.73
 8100                 2005.73      536.23      2    FIELD            12
             5.72
 8101                 2011.46      536.38      3    .                12
             4.54
 8102                 2016.00      536.98      4    .                12
             2.91
 8103                 2018.90      537.60      5    .                12
             2.86
 8104                 2021.76      538.38      6    .                12
             0.94
 8105                 2022.70      538.59      7    G/L MON 358 LB   12
             1.36
 8106                 2024.06      538.88      8    TOP              12
             1.60
 8107                 2025.66      538.98      9    .                12
             1.29
 8108                 2026.95      538.99     10    TOP              12
             0.96
 8109                 2027.91      538.79     11    .                12
             1.14
 8110                 2029.05      538.28     12    .                12
             2.48
 8111                 2031.53      537.80     13    .                12
             1.28
 8112                 2032.81      537.72     14    .                12
             3.62
 8113                 2036.44      537.01     15    .                12
             1.51
 8114                 2037.95      536.70     16    .                12
             2.63
 8115                 2040.58      536.35     17    TOP              12
             0.20
 8116                 2040.79      535.64     18    .                12
             0.68
 8117                 2041.47      534.82     19    .                12
             0.29
 8118                 2041.76      533.91     20    .                12
             1.30
 8119                 2043.06      532.90     21    .                12
             0.47
 8120                 2043.53      532.45     22    WL LB            12
             1.62
 8121                 2045.14      532.10     23    0.34             12
             1.42
 8122                 2046.56      531.64     24    0.80             12
             1.83
 8123                 2048.39      531.38     25    1.07             12
X/S 12     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.11
 8124                 2049.49      531.03     26    1.42             12
             0.01
 8125                 2049.50      531.26     27    FIX 1            12
             1.67
 8126                 2051.17      530.86     28    SUND BP 1-2      12
             1.67
 8127                 2052.84      529.96     29    FIX 2            12
             4.09
 8128                 2056.93      528.86     30    FIX 3            12
             4.80
 8129                 2061.74      527.46     31    FIX 4            12
             5.28
 8130                 2067.02      526.46     32    FIX 5            12
             6.12
 8131                 2073.13      525.86     33    FIX 6            12
             6.82
 8132                 2079.96      525.56     34    FIX 7            12
             5.36
 8133                 2085.32      525.56     35    SUND BP   7-8    12
             3.35
 8134                 2088.67      525.46     36    FIX 8            12
            11.86
 8135                 2100.53      525.16     37    FIX 9            12
             9.40
 8136                 2109.93      524.96     38    FIX 10           12
            12.29
 8137                 2122.23      524.46     39    FIX 11           12
             3.25
 8138                 2125.47      524.16     40    SUND BP  11-12   12
             6.33
 8139                 2131.80      521.06     41    FIX 12           12
             9.09
 8140                 2140.89      516.46     42    FIX 13           12
             5.49
 8141                 2146.38      514.56     43    SUND BP  13-14   12
             2.44
 8142                 2148.82      514.16     44    FIX 14           12
             3.09
 8143                 2151.91      514.16     45    SUND BP  14-15   12
             1.55
 8144                 2153.46      513.76     46    SUND BP  14-15   12
             4.95
 8145                 2158.41      514.16     47    SUND BP  14-15   12
             1.55
 8146                 2159.96      513.96     48    FIX 15           12
             9.14
 8147                 2169.10      511.46     49    SUND BP  15-16   12
             1.52
 8148                 2170.62      513.06     50    FIX 16           12
             2.65
X/S 12     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 8149                 2173.27      513.46     51    SUND BP  16-17   12
             5.83
 8150                 2179.10      515.46     52    FIX 17           12
             4.61
 8151                 2183.71      518.46     53    SUND BP  17-18   12
             0.66
 8152                 2184.37      518.66     54    SUND BP  17-18   12
             2.64
 8153                 2187.01      523.46     55    SUND BP  17-18   12
             1.05
 8154                 2188.06      523.57     56    FIX 18           12
             2.48
 8155                 2190.54      524.16     57    SUND BP  18-19   12
             4.34
 8156                 2194.89      524.86     58    FIX 19           12
             4.89
 8157                 2199.78      525.96     59    SUND BP  19-20   12
             0.82
 8158                 2200.60      526.56     60    FIX 20           12
             1.93
 8159                 2202.52      527.16     61    SUND BP  20-21   12
             3.09
 8160                 2205.61      528.86     62    FIX 21           12
             2.70
 8161                 2208.31      530.46     63    SUND BP  21-22   12
             1.54
 8162                 2209.85      530.76     64    FIX 22           12
             4.02
 8163                 2213.87      530.98     65    1.52             12
             0.93
 8164                 2214.80      531.46     66    1.02             12
             0.67
 8165                 2215.47      531.58     67    0.91             12
             2.09
 8166                 2217.57      532.47     68    WL RB            12
             0.66
 8167                 2218.23      532.86     69    TOE-CUT          12
             0.17
 8168                 2218.40      535.41     70    .                12
             0.50
 8169                 2218.90      535.88     71    TOP              12
             0.84
 8170                 2219.74      536.04     72    .                12
             2.33
 8171                 2222.06      535.69     73    .                12
             1.76
 8172                 2223.82      535.67     74    .                12
             2.82
 8173                 2226.64      536.26     75    .                12
             2.37
 8174                 2229.01      536.88     76    .                12
X/S 12     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.58
 8175                 2230.59      537.31     77    .                12
             0.47
 8176                 2231.06      537.56     78    TOP ROAD         12
             2.84
 8177                 2233.89      537.92     79    C/L ROAD         12
             1.96
 8178                 2235.86      538.32     80    EDGE ROAD        12
             0.83
 8179                 2236.69      538.38     81    G/L MON 765 RB   12
             1.09
 8180                 2237.78      538.53     82    .                12
             0.41
 8181                 2238.19      538.74     83    TOP DYKE         12
             1.28
 8182                 2239.47      538.87     84    C/L              12
             1.94
 8183                 2241.41      538.80     85    TOP              12
             0.76
 8184                 2242.17      538.39     86    .                12
             2.16
 8185                 2244.33      537.74     87    .                12
             2.27
 8186                 2246.60      537.27     88    .                12
             3.00
 8187                 2249.60      536.31     89    .                12
             1.42
 8188                 2251.01      535.82     90    TOE              12
             3.93
 8189                 2254.94      535.56     91    .                12
             4.14
 8190                 2259.08      535.75     92    ROLLING BEYOND   12
 
JOIN  208-8190  N 4d0'2" W  259.08
