NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 13     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      534.99      0    DUMMY
          2000.00
19568                 2000.00      534.99      1    1968 0+00 X/S 13
             1.31
 8200                 2001.31      535.12      2    ROLLING BEYOND   13
            10.26
 8201                 2011.57      535.61      3    TOE              13
             4.86
 8202                 2016.44      536.73      4    .                13
             3.33
 8203                 2019.77      537.76      5    .                13
             2.31
 8204                 2022.07      538.70      6    TOP              13
             1.78
 8205                 2023.85      538.82      7    G/L MON 360 LB   13
             1.36
 8206                 2025.21      538.69      8    TOP              13
             3.37
 8207                 2028.58      537.64      9    .                13
             1.83
 8208                 2030.41      537.19     10    .                13
             4.88
 8209                 2035.29      536.10     11    TOE              13
             1.71
 8210                 2037.01      535.95     12    EDGE SHED        13
             2.44
 8211                 2039.45      535.97     13    EDGE SHED        13
             2.71
 8212                 2042.16      536.05     14    .                13
             3.57
 8213                 2045.73      535.55     15    TOP CUT          13
             0.38
 8214                 2046.11      535.19     16    TOE CUT          13
             4.23
 8215                 2050.34      533.95     17    .                13
             2.12
 8216                 2052.46      533.08     18    .                13
             2.22
 8217                 2054.68      532.47     19    WL LB            13
             3.25
 8218                 2057.93      531.98     20    0.50             13
             3.68
 8219                 2061.60      531.47     21    1.00             13
             0.34
 8220                 2061.95      531.26     22    FIX 1            13
             2.95
 8221                 2064.89      530.96     23    FIX 2            13
             2.37
 8222                 2067.27      530.46     24    SUND BP   2-3    13
             1.90
 8223                 2069.17      530.46     25    FIX 3            13
X/S 13     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.90
 8224                 2072.07      530.46     26    SUND BP   3-4    13
             1.60
 8225                 2073.66      529.96     27    FIX 4            13
             2.33
 8226                 2075.99      528.76     28    SUND BP   4-5    13
             2.14
 8227                 2078.13      528.46     29    FIX 5            13
             5.45
 8228                 2083.57      527.46     30    FIX 6            13
             5.51
 8229                 2089.08      526.66     31    FIX 7            13
             6.81
 8230                 2095.89      525.76     32    FIX 8            13
             5.73
 8231                 2101.62      525.06     33    FIX 9            13
             5.12
 8232                 2106.73      524.56     34    FIX 10           13
             5.51
 8233                 2112.24      524.26     35    FIX 11           13
             5.14
 8234                 2117.38      524.16     36    FIX 12           13
             5.65
 8235                 2123.03      523.86     37    FIX 13           13
             2.92
 8236                 2125.95      523.76     38    SUND BP  13-14   13
             1.97
 8237                 2127.93      523.26     39    SUND BP  13-14   13
             2.41
 8238                 2130.34      523.16     40    FIX 14           13
             7.27
 8239                 2137.61      522.86     41    FIX 15           13
             2.61
 8240                 2140.22      522.76     42    SUND BP  15-16   13
             1.74
 8241                 2141.96      522.86     43    SUND BP  15-16   13
             1.33
 8242                 2143.29      522.66     44    FIX 16           13
             8.75
 8243                 2152.04      521.86     45    FIX 17           13
             6.06
 8244                 2158.10      521.26     46    FIX 18           13
             5.98
 8245                 2164.08      520.66     47    FIX 19           13
             1.57
 8246                 2165.65      520.56     48    SUND BP  19-20   13
             1.25
 8247                 2166.91      520.16     49    SUND BP  19-20   13
             3.26
 8248                 2170.17      519.96     50    FIX 20           13
             2.69
X/S 13     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 8249                 2172.86      519.46     51    SUND BP  20-21   13
             4.23
 8250                 2177.09      519.26     52    FIX 21           13
             2.97
 8251                 2180.06      519.06     53    SUND BP  21-22   13
             2.18
 8252                 2182.24      519.16     54    SUND BP  21-22   13
             0.13
 8253                 2182.37      518.66     55    SUND BP  21-22   13
             2.05
 8254                 2184.42      518.46     56    FIX 22           13
             0.01
 8255                 2184.42      517.96     57    SUND BP  22-23   13
             2.64
 8256                 2187.07      517.96     58    SUND BP  22-23   13
             3.40
 8257                 2190.47      519.16     59    SUND BP  22-23   13
             1.51
 8258                 2191.98      519.26     60    FIX 23           13
             1.78
 8259                 2193.76      521.86     61    SUND BP  23-24   13
             1.42
 8260                 2195.18      522.26     62    SUND BP  23-24   13
             0.43
 8261                 2195.61      523.86     63    SUND BP  23-24   13
             2.99
 8262                 2198.60      523.96     64    FIX 24           13
             3.23
 8263                 2201.83      523.96     65    SUND BP  24-25   13
             3.23
 8264                 2205.05      524.56     66    FIX 25           13
             1.01
 8265                 2206.07      524.76     67    SUND BP  25-26   13
             0.63
 8266                 2206.70      525.26     68    SUND BP  25-26   13
             0.76
 8267                 2207.46      525.71     69    SUND BP  25-26   13
             0.76
 8268                 2208.22      526.76     70    SUND BP  25-26   13
             1.14
 8269                 2209.37      526.76     71    SUND BP  25-26   13
             1.71
 8270                 2211.08      527.16     72    FIX 26           13
             1.22
 8271                 2212.30      527.26     73    SUND BP  26-27   13
             0.23
 8272                 2212.53      527.46     74    SUND BP  26-27   13
             1.10
 8273                 2213.63      527.86     75    SUND BP  26-27   13
             2.44
 8274                 2216.07      528.06     76    FIX 27           13
X/S 13     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.07
 8275                 2217.14      528.16     77    SUND BP  27-28   13
             1.07
 8276                 2218.21      529.16     78    SUND BP  27-28   13
             1.07
 8277                 2219.28      529.06     79    SUND BP  27-28   13
             0.43
 8278                 2219.70      529.46     80    SUND BP  27-28   13
             1.33
 8279                 2221.04      529.76     81    FIX 28           13
             0.61
 8280                 2221.65      529.96     82    SUND BP  28-29   13
             2.66
 8281                 2224.30      530.26     83    SUND BP  28-29   13
             1.14
 8282                 2225.45      530.96     84    FIX 29           13
             2.14
 8283                 2227.59      531.26     85    1.18             13
             3.97
 8284                 2231.56      531.81     86    0.64             13
             2.67
 8285                 2234.23      532.10     87    0.35             13
             1.80
 8286                 2236.03      532.45     88    WL RB            13
             0.34
 8287                 2236.37      532.70     89    TOE CUT          13
             0.50
 8288                 2236.87      534.78     90    TOP CUT          13
             0.82
 8289                 2237.68      535.58     91    .                13
             0.20
 8290                 2237.88      536.22     92    TOP MAIN BANK    13
             4.36
 8291                 2242.25      537.53     93    .                13
             1.59
 8292                 2243.83      538.31     94    .                13
             1.28
 8293                 2245.11      538.70     95    TOP              13
             0.69
 8294                 2245.80      538.71     96    G/L MON 359 RB   13
             1.19
 8295                 2246.99      538.70     97    TOP DYKE         13
             1.95
 8296                 2248.94      537.93     98    .                13
             2.35
 8297                 2251.29      537.17     99    .                13
             1.97
 8298                 2253.26      536.44    100    .                13
             3.21
 8299                 2256.47      535.67    101    .                13
             1.41
X/S 13     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 8300                 2257.88      535.45    102    .                13
             1.58
 8301                 2259.46      535.03    103    TOE              13
             4.32
 8302                 2263.79      535.17    104    C/L ROAD         13
             4.68
 8303                 2268.47      535.13    105    SLOW DROP        13
 
JOIN  19568-8303  N 56d50'43" W  268.47
