NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 20     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      532.56      0    DUMMY
          2000.00
 2445                 2000.00      532.56      1    1997 0+00 X/S 20  
            12.20
 9835                 2012.20      532.54      2    NORMAL GROUND    20
            14.60
 9834                 2026.80      533.02      3    .                20
             9.96
 9833                 2036.76      533.40      4    DYKE SIDE SLOPE  20
            10.62
 9832                 2047.38      534.50      5    DYKE SIDE SLOPE  20
             9.92
 9831                 2057.29      535.33      6    DYKE SIDE SLOPE  20
            11.95
 9830                 2069.24      535.87      7    .                20
            10.73
 9829                 2079.97      536.40      8    .                20
             5.97
 9828                 2085.94      536.83      9    .                20
             1.80
 9827                 2087.74      537.70     10    .                20
             1.30
 9826                 2089.03      538.10     11    .                20
             1.38
 9825                 2090.41      538.23     12    TOP              20
             6.10
 9824                 2096.51      538.27     13    C/L ROAD & DYKE  20
             3.33
 9823                 2099.84      538.14     14    TOP              20
             1.83
 9822                 2101.66      537.95     15    G/L MON 404 LB   20
             1.67
 9821                 2103.33      537.96     16    TOP              20
             0.82
 9820                 2104.15      537.64     17    .                20
             0.95
 9819                 2105.10      537.32     18    .                20
             0.27
 9818                 2105.38      536.86     19    .                20
             1.23
 9817                 2106.61      536.11     20    .                20
             1.17
 9816                 2107.78      535.30     21    .                20
             2.06
 9815                 2109.84      534.94     22    .                20
             1.05
 9814                 2110.89      534.05     23    .                20
             1.23
 9813                 2112.12      533.12     24    .                20
             1.35
 9812                 2113.46      532.33     25    WL LB            20
X/S 20     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.07
 9811                 2114.54      532.04     26    0.28             20
             3.74
 9810                 2118.28      531.81     27    0.53             20
             1.08
 9809                 2119.36      531.33     28    FIX 27           20
             2.35
 9808                 2121.71      531.03     29    SUND BP  26-27   20
             0.37
 9807                 2122.08      530.73     30    FIX 26           20
             1.38
 9806                 2123.46      530.63     31    SUND BP  25-26   20
             1.62
 9805                 2125.09      530.33     32    FIX 25           20
             1.26
 9804                 2126.35      530.23     33    SUND BP  24-25   20
             2.18
 9803                 2128.53      529.23     34    FIX 24           20
             1.80
 9802                 2130.33      528.33     35    SUND BP  23-24   20
             2.65
 9801                 2132.98      526.73     36    FIX 23           20
             0.32
 9800                 2133.30      526.33     37    SUND BP  22-23   20
             5.04
 9799                 2138.34      523.94     38    FIX 22           20
             0.73
 9798                 2139.07      523.33     39    SUND BP  21-22   20
             1.73
 9797                 2140.80      522.33     40    SUND BP  21-22   20
             2.36
 9796                 2143.17      520.93     41    FIX 21           20
             1.35
 9795                 2144.52      520.33     42    SUND BP  20-21   20
             2.37
 9794                 2146.89      519.33     43    SUND BP  20-21   20
             2.37
 9793                 2149.25      518.03     44    FIX 20           20
             2.57
 9792                 2151.83      516.33     45    SUND BP  19-20   20
             3.57
 9791                 2155.40      514.83     46    FIX 19           20
             1.32
 9790                 2156.72      513.83     47    SUND BP  18-19   20
             0.57
 9789                 2157.29      513.33     48    SUND BP  18-19   20
             1.03
 9788                 2158.32      512.33     49    SUND BP  18-19   20
             3.55
 9787                 2161.87      509.83     50    FIX 18           20
             2.09
X/S 20     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 9786                 2163.96      508.83     51    SUND BP  17-18   20
             2.09
 9785                 2166.05      507.93     52    SUND BP  17-18   20
             1.35
 9784                 2167.39      506.83     53    SUND BP  17-18   20
             1.35
 9783                 2168.74      506.53     54    FIX 17           20
             7.96
 9782                 2176.70      506.53     55    FIX 16           20
             5.54
 9781                 2182.25      506.63     56    SUND BP  15-16   20
             1.39
 9780                 2183.63      506.33     57    SUND BP  15-16   20
             0.92
 9779                 2184.56      505.53     58    FIX 15           20
             7.82
 9778                 2192.37      506.33     59    FIX 14           20
             8.43
 9777                 2200.81      507.13     60    FIX 13           20
             2.25
 9776                 2203.06      507.13     61    SUND BP  12-13   20
             2.57
 9775                 2205.63      506.83     62    SUND BP  12-13   20
             3.22
 9774                 2208.85      506.93     63    FIX 12           20
             1.58
 9773                 2210.42      507.03     64    SUND BP  11-12   20
             3.15
 9772                 2213.58      506.93     65    SUND BP  11-12   20
             2.10
 9771                 2215.68      506.83     66    SUND BP  11-12   20
             2.10
 9770                 2217.78      506.83     67    FIX 11           20
             2.60
 9769                 2220.38      506.83     68    SUND BP  10-11   20
             1.70
 9768                 2222.09      506.63     69    SUND BP  10-11   20
             2.80
 9767                 2224.89      507.43     70    FIX 10           20
             7.48
 9766                 2232.37      509.13     71    FIX 9            20
             4.26
 9765                 2236.63      510.13     72    SUND BP   8-9    20
             2.13
 9764                 2238.75      510.13     73    FIX 8            20
             2.38
 9763                 2241.13      509.83     74    SUND BP   7-8    20
             1.35
 9762                 2242.48      511.03     75    SUND BP   7-8    20
             2.46
 9761                 2244.94      512.83     76    FIX 7            20
X/S 20     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.55
 9760                 2246.49      513.33     77    SUND BP   6-7    20
             2.10
 9759                 2248.58      514.33     78    SUND BP   6-7    20
             3.47
 9758                 2252.05      515.33     79    FIX 6            20
             2.55
 9757                 2254.60      516.33     80    SUND BP   5-6    20
             1.62
 9756                 2256.22      517.33     81    SUND BP   5-6    20
             2.64
 9755                 2258.86      518.73     82    FIX 5            20
             0.78
 9754                 2259.64      519.33     83    SUND BP   4-5    20
             2.72
 9753                 2262.36      521.33     84    SUND BP   4-5    20
             2.72
 9752                 2265.08      523.03     85    FIX 4            20
             2.38
 9751                 2267.46      524.33     86    SUND BP   3-4    20
             1.15
 9750                 2268.61      525.33     87    SUND BP   3-4    20
             3.12
 9749                 2271.73      527.33     88    FIX 3            20
             2.45
 9748                 2274.18      528.43     89    SUND BP   2-3    20
             1.61
 9747                 2275.79      528.63     90    SUND BP   2-3    20
             2.07
 9746                 2277.85      529.73     91    FIX 2            20
             2.26
 9745                 2280.11      530.63     92    SUND BP   1-2    20
             0.67
 9744                 2280.78      530.63     93    FIX 1            20
             0.19
 9743                 2280.97      530.70     94    1.61             20
             0.66
 9742                 2281.63      530.95     95    1.38             20
             1.08
 9741                 2282.72      531.54     96    0.77             20
             1.22
 9740                 2283.94      531.89     97    0.44             20
             0.67
 9739                 2284.61      532.33     98    WL RB            20
             0.35
 9738                 2284.96      532.45     99    .                20
             0.86
 9737                 2285.82      533.27    100    .                20
             0.58
 9736                 2286.40      534.88    101    .                20
             0.25
X/S 20     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 9735                 2286.65      535.61    102    .                20
             0.85
 9734                 2287.50      536.06    103    TOP              20
             0.77
 9733                 2288.27      536.01    104    .                20
             1.95
 9732                 2290.22      535.45    105    .                20
             1.42
 9731                 2291.64      535.25    106    .                20
             2.50
 9730                 2294.13      535.28    107    .                20
             3.56
 9729                 2297.69      534.58    108    .                20
             4.02
 9728                 2301.72      534.26    109    .                20
             4.98
 9727                 2306.69      534.13    110    .                20
             4.52
 9726                 2311.21      533.88    111    .                20
             4.01
 9725                 2315.22      533.84    112    .                20
             3.29
 9724                 2318.52      533.84    113    .                20
             1.47
 9723                 2319.98      534.12    114    .                20
             1.33
 9722                 2321.31      534.00    115    .                20
             3.64
 9721                 2324.95      534.32    116    .                20
             1.74
 9720                 2326.69      534.00    117    .                20
             4.59
 9719                 2331.29      534.09    118    .                20
             5.04
 9718                 2336.32      534.68    119    .                20
             3.16
 9717                 2339.48      534.75    120    .                20
             0.85
 9716                 2340.34      534.99    121    .                20
             3.61
 9715                 2343.94      535.30    122    .                20
             2.13
 9714                 2346.08      535.17    123    .                20
             2.20
 9713                 2348.27      535.39    124    .                20
             2.86
 9712                 2351.13      535.80    125    .                20
             4.90
 9711                 2356.03      536.58    126    .                20
             3.24
 9710                 2359.27      536.95    127    .                20
X/S 20     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.31
 9709                 2360.59      537.39    128    .                20
             1.72
 9708                 2362.31      537.88    129    .                20
             1.27
 9707                 2363.58      538.22    130    TOP              20
             1.68
 9706                 2365.26      538.29    131    G/L MON 403 RB   20
             1.73
 9705                 2366.99      538.22    132    .                20
             1.19
 9704                 2368.17      538.05    133    FENCELINE        20
             0.87
 9703                 2369.04      537.47    134    .                20
             1.85
 9702                 2370.89      536.95    135    .                20
             1.02
 9701                 2371.92      536.42    136    TOE              20
             8.49
 9700                 2380.40      536.09    137    FIELD            20
 
JOIN  2445-9700  N 52d12'14" E  380.40
