NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 7     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      536.69      0    DUMMY
          2000.00
16373                 2000.00      536.69      1    1973 0+00 X/S 7  
             5.09
 7300                 2005.09      536.70      2    FIELD             7
             8.99
 7301                 2014.08      537.00      3    .                 7
             2.54
 7302                 2016.62      537.13      4    TOE               7
             1.93
 7303                 2018.55      537.62      5    .                 7
             2.59
 7304                 2021.14      538.50      6    .                 7
             1.04
 7305                 2022.18      538.97      7    .                 7
             0.65
 7306                 2022.83      539.13      8    TOP               7
             1.60
 7307                 2024.43      539.14      9    G/L MON 348 LB    7
             1.40
 7308                 2025.83      539.14     10    TOP               7
             0.90
 7309                 2026.73      538.94     11    .                 7
             2.01
 7310                 2028.74      538.13     12    .                 7
             1.39
 7311                 2030.14      537.77     13    .                 7
             1.45
 7312                 2031.58      537.46     14    .                 7
             1.99
 7313                 2033.58      537.00     15    .                 7
             4.34
 7314                 2037.92      536.42     16    .                 7
             3.04
 7315                 2040.96      536.06     17    .                 7
             4.92
 7316                 2045.87      535.83     18    .                 7
             2.24
 7317                 2048.11      535.52     19    .                 7
             2.16
 7318                 2050.27      535.75     20    .                 7
             2.26
 7319                 2052.52      535.52     21    .                 7
             1.96
 7320                 2054.48      535.39     22    .                 7
             1.75
 7321                 2056.23      534.99     23    .                 7
             2.92
 7322                 2059.15      534.37     24    .                 7
             3.82
 7323                 2062.97      534.42     25    .                 7
X/S 7     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             4.35
 7324                 2067.31      535.44     26    .                 7
             1.63
 7325                 2068.94      535.19     27    .                 7
             2.20
 7326                 2071.15      535.27     28    .                 7
             2.42
 7327                 2073.56      535.54     29    .                 7
             1.31
 7328                 2074.87      535.89     30    .                 7
             3.19
 7329                 2078.06      535.74     31    .                 7
             4.15
 7330                 2082.20      535.77     32    .                 7
             1.73
 7331                 2083.94      535.98     33    .                 7
             0.87
 7332                 2084.81      536.08     34    .                 7
             1.24
 7333                 2086.04      535.70     35    .                 7
             2.31
 7334                 2088.35      535.45     36    .                 7
             2.59
 7335                 2090.94      535.66     37    .                 7
             2.86
 7336                 2093.80      535.39     38    .                 7
             2.33
 7337                 2096.12      535.48     39    .                 7
             1.64
 7338                 2097.76      536.02     40    .                 7
             1.18
 7339                 2098.94      536.45     41    .                 7
             1.82
 7340                 2100.76      536.39     42    .                 7
             2.92
 7341                 2103.67      536.51     43    .                 7
             1.60
 7342                 2105.27      536.24     44    .                 7
             2.54
 7343                 2107.81      536.64     45    .                 7
             2.08
 7344                 2109.88      536.52     46    .                 7
             3.25
 7345                 2113.13      536.72     47    .                 7
             5.06
 7346                 2118.19      536.91     48    .                 7
             6.02
 7347                 2124.21      536.57     49    .                 7
             2.98
 7348                 2127.19      536.46     50    .                 7
             2.12
X/S 7     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 7349                 2129.31      536.36     51    .                 7
             2.47
 7350                 2131.78      536.26     52    .                 7
             1.98
 7351                 2133.76      536.28     53    .                 7
             1.46
 7352                 2135.22      536.31     54    TOP               7
             1.11
 7353                 2136.33      535.72     55    .                 7
             0.68
 7354                 2137.01      534.91     56    .                 7
             0.68
 7355                 2137.68      534.21     57    .                 7
             0.64
 7356                 2138.33      533.92     58    .                 7
             0.74
 7357                 2139.07      533.23     59    .                 7
             0.51
 7358                 2139.58      532.55     60    WL LB             7
             0.27
 7359                 2139.85      532.12     61    0.42              7
             0.66
 7360                 2140.51      531.74     62    0.82              7
             1.58
 7361                 2142.09      530.96     63    1.58              7
             1.13
 7362                 2143.22      530.31     64    2.24              7
             0.94
 7363                 2144.16      530.36     65    FIX 1             7
             0.10
 7364                 2144.26      529.97     66    2.20              7
             0.36
 7365                 2144.62      530.26     67    SUND BP   1-2     7
             1.89
 7366                 2146.51      529.36     68    FIX 2             7
             1.31
 7367                 2147.83      528.56     69    SUND BP   2-3     7
             1.43
 7368                 2149.26      527.66     70    FIX 3             7
             1.05
 7369                 2150.31      526.86     71    SUND BP   3-4     7
             2.32
 7370                 2152.63      525.56     72    SUND BP   3-4     7
             1.79
 7371                 2154.43      524.56     73    FIX 4             7
             2.84
 7372                 2157.26      523.06     74    SUND BP   4-5     7
             2.06
 7373                 2159.33      522.67     75    SUND BP   4-5     7
             2.19
 7374                 2161.52      522.56     76    FIX 5             7
X/S 7     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             3.46
 7375                 2164.98      522.56     77    SUND BP   5-6     7
             1.38
 7376                 2166.36      522.26     78    SUND BP   5-6     7
             3.46
 7377                 2169.82      522.36     79    FIX 6             7
             1.54
 7378                 2171.36      522.26     80    SUND BP   6-7     7
             1.69
 7379                 2173.05      521.96     81    SUND BP   6-7     7
             1.39
 7380                 2174.44      522.06     82    SUND BP   6-7     7
             2.62
 7381                 2177.06      522.16     83    SUND BP   6-7     7
             0.77
 7382                 2177.82      522.16     84    FIX 7             7
             3.66
 7383                 2181.49      522.16     85    SUND BP   7-8     7
             2.65
 7384                 2184.14      522.67     86    FIX 8             7
             1.81
 7385                 2185.95      522.67     87    SUND BP   8-9     7
             7.25
 7386                 2193.20      521.86     88    FIX 9             7
             4.60
 7387                 2197.80      521.26     89    SUND BP   9-10    7
             2.51
 7388                 2200.31      520.96     90    FIX 10            7
             1.30
 7389                 2201.61      520.46     91    SUND BP  10-11    7
             5.46
 7390                 2207.07      520.46     92    FIX 11            7
             3.01
 7391                 2210.08      519.86     93    SUND BP  11-12    7
             4.11
 7392                 2214.19      519.06     94    FIX 12            7
             2.84
 7393                 2217.03      518.26     95    SUND BP  12-13    7
             0.28
 7394                 2217.32      517.36     96    SUND BP  12-13    7
             1.85
 7395                 2219.17      517.46     97    SUND BP  12-13    7
             2.42
 7396                 2221.58      517.36     98    FIX 13            7
             1.54
 7397                 2223.13      517.26     99    SUND BP  13-14    7
             1.54
 7398                 2224.67      517.36    100    SUND BP  13-14    7
             3.79
 7399                 2228.45      518.06    101    FIX 14            7
             7.48
X/S 7     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 7400                 2235.94      519.36    102    FIX 15            7
             2.22
 7401                 2238.16      519.56    103    SUND BP  15-16    7
             2.22
 7402                 2240.39      519.56    104    SUND BP  15-16    7
             2.82
 7403                 2243.20      519.26    105    FIX 16            7
             7.48
 7404                 2250.68      517.86    106    FIX 17            7
             4.02
 7405                 2254.70      516.96    107    SUND BP  17-18    7
             3.08
 7406                 2257.78      516.06    108    FIX 18            7
             1.13
 7407                 2258.91      515.56    109    SUND BP  18-19    7
             4.39
 7408                 2263.31      514.76    110    SUND BP  18-19    7
             1.56
 7409                 2264.87      514.26    111    FIX 19            7
             0.66
 7410                 2265.53      514.16    112    SUND BP  19-20    7
             1.98
 7411                 2267.51      514.36    113    SUND BP  19-20    7
             0.13
 7412                 2267.64      514.56    114    SUND BP  19-20    7
             1.19
 7413                 2268.83      515.06    115    SUND BP  19-20    7
             3.57
 7414                 2272.40      518.16    116    FIX 20            7
             2.46
 7415                 2274.86      518.66    117    SUND BP  20-21    7
             3.68
 7416                 2278.54      519.56    118    SUND BP  20-21    7
             2.18
 7417                 2280.72      520.56    119    FIX 21            7
             1.66
 7418                 2282.39      521.56    120    SUND BP  21-22    7
             1.01
 7419                 2283.40      522.56    121    SUND BP  21-22    7
             0.95
 7420                 2284.35      523.56    122    SUND BP  21-22    7
             0.65
 7421                 2285.00      524.26    123    FIX 22            7
             1.94
 7422                 2286.94      525.56    124    SUND BP  22-23    7
             1.84
 7423                 2288.79      527.56    125    SUND BP  22-23    7
             2.14
 7424                 2290.92      528.36    126    FIX 23            7
             2.36
 7425                 2293.29      529.16    127    SUND BP  23-24    7
X/S 7     KOOTENAY RIVER     PROJECT 86RPP-01     OCT 1986
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             4.59
 7426                 2297.88      530.16    128    FIX 24            7
             0.15
 7427                 2298.03      531.06    129    FIX 25            7
             1.08
 7428                 2299.11      531.56    130    1.00              7
             0.79
 7429                 2299.89      531.71    131    0.85              7
             0.43
 7430                 2300.32      532.57    132    WL RB             7
             0.50
 7431                 2300.82      532.93    133    .                 7
             0.80
 7432                 2301.62      533.38    134    .                 7
             0.01
 7433                 2301.63      535.83    135    TOP ERODED BANK   7
             0.94
 7434                 2302.57      536.14    136    .                 7
             1.14
 7435                 2303.71      536.90    137    .                 7
             2.33
 7436                 2306.04      537.24    138    TOP               7
             3.77
 7437                 2309.80      537.41    139    .                 7
             4.70
 7438                 2314.50      537.43    140    G/L MON 347 RB    7
            11.61
 7439                 2326.11      537.36    141    FIELD             7
 
JOIN  16373-7439  S 27d53'54" E  326.11
