NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 1     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      535.74      0    DUMMY
          2000.00
15763                 2000.00      535.74      1    1973 0+00 X/S 1  
            22.05
 3077                 2022.05      539.29      2    AT MON 326 LB    1
             1.22
 3076                 2023.27      539.30      3    TOP DYKE         1
             2.90
 3075                 2026.17      537.95      4    .                1
             1.52
 3074                 2027.68      537.68      5    .                1
             2.26
 3073                 2029.95      536.98      6    .                1
             3.93
 3072                 2033.87      536.23      7    .                1
             2.94
 3071                 2036.81      535.87      8    TOE              1
             2.54
 3070                 2039.35      535.88      9    TOE              1
             2.08
 3069                 2041.43      536.40     10    .                1
             1.23
 3068                 2042.66      536.49     11    .                1
             0.73
 3067                 2043.39      536.46     12    FENCE LINE       1
             1.01
 3066                 2044.41      536.26     13    TOP              1
             0.93
 3065                 2045.34      535.74     14    .                1
             0.52
 3064                 2045.86      535.21     15    .                1
             1.29
 3063                 2047.15      534.53     16    .                1
             0.81
 3062                 2047.96      533.72     17    TOP CUT BANK     1
             1.16
 3061                 2049.12      532.42     18    .                1
             0.37
 3060                 2049.48      532.02     19    WL LB            1
             0.20
 3059                 2049.68      531.77     20    .3               1
             1.89
 3058                 2051.57      531.35     21    .72              1
             1.56
 3057                 2053.13      530.35     22    1.7              1
             1.96
 3056                 2055.09      529.25     23    2.81             1
             1.57
 3055                 2056.66      528.76     24    FIX 520          1
             3.47
 3054                 2060.13      526.06     25    SUND BP 519-520  1
X/S 1     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.39
 3053                 2062.52      525.06     26    FIX 519          1
             3.09
 3052                 2065.61      524.36     27    SUND BP 518-519  1
             3.46
 3051                 2069.07      524.06     28    SUND BP 518-519  1
             0.86
 3050                 2069.93      524.11     29    FIX 518          1
             1.81
 3049                 2071.74      524.56     30    SUND BP 517-518  1
             3.62
 3048                 2075.36      524.96     31    SUND BP 517-518  1
             1.45
 3047                 2076.81      524.91     32    FIX 517          1
             1.37
 3046                 2078.18      524.81     33    SUND BP 516-517  1
             4.88
 3045                 2083.06      523.86     34    FIX 516          1
             6.64
 3044                 2089.70      522.56     35    FIX 515          1
             3.11
 3043                 2092.81      521.96     36    SUND BP 514-515  1
             2.68
 3042                 2095.49      521.61     37    FIX 514          1
             7.56
 3041                 2103.05      520.86     38    FIX 513          1
             2.17
 3040                 2105.21      520.76     39    SUND BP 512-513  1
             1.74
 3039                 2106.95      520.36     40    SUND BP 512-513  1
             2.39
 3038                 2109.34      520.26     41    FIX 512          1
             7.16
 3037                 2116.49      519.96     42    FIX 511          1
             3.03
 3036                 2119.52      519.71     43    SUND BP 510-511  1
             2.82
 3035                 2122.34      519.36     44    FIX 510          1
             2.98
 3034                 2125.32      519.31     45    SUND BP 509-510  1
             1.95
 3033                 2127.27      519.01     46    SUND BP 509-510  1
             2.29
 3032                 2129.57      518.86     47    FIX 509          1
             1.21
 3031                 2130.78      518.71     48    SUND BP 508-509  1
             0.84
 3030                 2131.62      518.61     49    SUND BP 508-509  1
             1.69
 3029                 2133.31      518.56     50    SUND BP 508-509  1
             2.29
X/S 1     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 3028                 2135.60      518.46     51    FIX 508          1
             3.50
 3027                 2139.11      518.31     52    SUND BP 507-508  1
             3.28
 3026                 2142.39      518.01     53    FIX 507          1
             2.00
 3025                 2144.39      517.81     54    SUND BP 506-507  1
             4.66
 3024                 2149.05      517.76     55    FIX 506          1
             6.79
 3023                 2155.84      517.26     56    FIX 505          1
             4.91
 3022                 2160.75      517.01     57    SUND BP 504-505  1
             1.57
 3021                 2162.32      517.56     58    FIX 504          1
             1.93
 3020                 2164.25      518.36     59    SUND BP 503-504  1
             3.85
 3019                 2168.10      521.76     60    FIX 503          1
             2.10
 3018                 2170.19      523.56     61    SUND BP 502-503  1
             1.30
 3017                 2171.49      523.76     62    SUND BP 502-503  1
             2.20
 3016                 2173.69      524.81     63    SUND BP 502-503  1
             0.90
 3015                 2174.59      524.96     64    FIX 502          1
             3.75
 3014                 2178.33      527.16     65    SUND BP 501-502  1
             1.54
 3013                 2179.87      527.61     66    FIX 501          1
             1.46
 3012                 2181.33      527.92     67    4.2              1
             1.52
 3011                 2182.86      528.73     68    3.34             1
             2.32
 3010                 2185.17      529.78     69    2.3              1
             1.30
 3009                 2186.47      530.28     70    1.79             1
             1.05
 3008                 2187.52      531.46     71    .6               1
             1.04
 3007                 2188.56      532.06     72    WL               1
             1.49
 3006                 2190.05      533.14     73    .                1
             1.50
 3005                 2191.55      534.34     74    .                1
             1.19
 3004                 2192.74      535.54     75    .                1
             0.95
 3003                 2193.70      536.43     76    .                1
X/S 1     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.58
 3002                 2195.28      537.22     77    TOP CUT          1
             0.46
 3001                 2195.74      537.32     78    .                1
             1.45
 3000                 2197.19      537.34     79    G/L MON 325 RB   1
 
JOIN  15763-3000  N 75d21'56" E  197.19
