NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 13     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      534.99      0    DUMMY
          2000.00
19568                 2000.00      534.99      1    1968 0+00 X/S 13
            23.85
 4586                 2023.85      538.82      2    AT MON 360 LB   13
             1.39
 4585                 2025.24      538.68      3    TOP DYKE        13
             2.56
 4584                 2027.80      537.88      4    .               13
             1.53
 4583                 2029.33      537.43      5    .               13
             2.47
 4582                 2031.80      536.89      6    .               13
             3.94
 4581                 2035.73      536.07      7    TOE DYKE        13
             7.27
 4580                 2043.00      535.98      8    TOP             13
             2.13
 4579                 2045.13      535.79      9    .               13
             0.06
 4578                 2045.20      535.50     10    .               13
             1.52
 4577                 2046.71      535.23     11    .               13
             0.93
 4576                 2047.64      534.85     12    .               13
             3.14
 4575                 2050.78      533.90     13    .               13
             1.27
 4574                 2052.05      533.30     14    .               13
             1.90
 4573                 2053.95      532.78     15    .               13
             0.45
 4572                 2054.39      532.46     16    .               13
             2.99
 4571                 2057.38      532.05     17    WL LB           13
             1.71
 4570                 2059.09      531.87     18    .2              13
             2.09
 4569                 2061.18      531.61     19    .47             13
             3.14
 4568                 2064.32      531.04     20    1.02            13
             3.58
 4567                 2067.89      530.58     21    FIX 521         13
             6.06
 4566                 2073.96      529.58     22    FIX 520         13
             6.68
 4565                 2080.63      528.28     23    FIX 519         13
             7.23
 4564                 2087.86      527.23     24    FIX 518         13
             7.74
 4563                 2095.61      526.53     25    FIX 517         13
X/S 13     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             7.23
 4562                 2102.84      525.73     26    FIX 516         13
             1.05
 4561                 2103.89      525.63     27    SUND BP 515-516 13
             1.70
 4560                 2105.59      525.58     28    SUND BP 515-516 13
             5.23
 4559                 2110.82      525.08     29    FIX 515         13
             1.40
 4558                 2112.22      524.98     30    SUND BP 514-515 13
             1.82
 4557                 2114.05      525.03     31    SUND BP 514-515 13
             4.21
 4556                 2118.26      524.88     32    FIX 514         13
             7.55
 4555                 2125.81      524.38     33    FIX 513         13
             7.48
 4554                 2133.29      523.73     34    FIX 512         13
             1.32
 4553                 2134.61      523.63     35    SUND BP 511-512 13
             0.44
 4552                 2135.05      523.38     36    SUND BP 511-512 13
             6.59
 4551                 2141.64      523.03     37    FIX 511         13
             3.15
 4550                 2144.79      522.94     38    SUND BP 510-511 13
             2.88
 4549                 2147.66      522.88     39    SUND BP 510-511 13
             2.74
 4548                 2150.40      522.58     40    FIX 510         13
             2.24
 4547                 2152.65      522.38     41    SUND BP 509-510 13
             2.09
 4546                 2154.74      522.03     42    SUND BP 509-510 13
             4.64
 4545                 2159.38      521.48     43    FIX 509         13
             2.72
 4544                 2162.09      521.33     44    SUND BP 508-509 13
             1.36
 4543                 2163.45      521.33     45    SUND BP 508-509 13
             4.07
 4542                 2167.52      520.98     46    FIX 508         13
             4.83
 4541                 2172.35      520.53     47    SUND BP 507-508 13
             1.90
 4540                 2174.26      520.18     48    SUND BP 507-508 13
             2.63
 4539                 2176.89      519.53     49    FIX 507         13
             1.88
 4538                 2178.77      519.78     50    SUND BP 506-507 13
             1.59
X/S 13     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 4537                 2180.36      519.53     51    SUND BP 506-507 13
             2.31
 4536                 2182.67      519.48     52    SUND BP 506-507 13
             2.60
 4535                 2185.27      518.38     53    FIX 506         13
             1.05
 4534                 2186.32      518.33     54    SUND BP 505-506 13
             1.05
 4533                 2187.37      518.58     55    SUND BP 505-506 13
             1.65
 4532                 2189.02      518.58     56    SUND BP 505-506 13
             2.40
 4531                 2191.42      518.98     57    SUND BP 505-506 13
             1.65
 4530                 2193.07      519.58     58    FIX 505         13
             2.23
 4529                 2195.29      519.98     59    SUND BP 504-505 13
             2.51
 4528                 2197.80      524.03     60    SUND BP 504-505 13
             4.18
 4527                 2201.98      524.08     61    FIX 504         13
             0.91
 4526                 2202.89      524.08     62    SUND BP 503-504 13
             4.81
 4525                 2207.71      525.58     63    SUND BP 503-504 13
             2.34
 4524                 2210.05      526.68     64    FIX 503         13
             1.42
 4523                 2211.47      527.23     65    SUND BP 502-503 13
             1.18
 4522                 2212.65      527.23     66    SUND BP 502-503 13
             0.35
 4521                 2213.00      527.58     67    SUND BP 502-503 13
             1.77
 4520                 2214.78      527.98     68    SUND BP 502-503 13
             2.96
 4519                 2217.73      528.13     69    FIX 502         13
             0.83
 4518                 2218.56      528.18     70    SUND BP 501-502 13
             1.20
 4517                 2219.76      528.88     71    SUND BP 501-502 13
             0.60
 4516                 2220.36      529.28     72    SUND BP 501-502 13
             2.33
 4515                 2222.69      529.83     73    SUND BP 501-502 13
             0.75
 4514                 2223.44      529.88     74    FIX 501         13
             4.23
 4513                 2227.67      530.97     75    1.08            13
             1.75
 4512                 2229.42      531.49     76    .58             13
X/S 13     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.13
 4511                 2231.55      531.71     77    .36             13
             3.20
 4510                 2234.75      532.07     78    WL RB           13
             1.58
 4509                 2236.33      532.73     79    .               13
             0.71
 4508                 2237.05      533.08     80    .               13
             0.70
 4507                 2237.75      533.75     81    .               13
             0.24
 4506                 2237.99      536.27     82    TOP CUT         13
             0.83
 4505                 2238.82      536.61     83    .               13
             2.02
 4504                 2240.84      537.17     84    .               13
             1.97
 4503                 2242.81      537.71     85    .               13
             1.08
 4502                 2243.88      538.23     86    .               13
             0.79
 4501                 2244.68      538.57     87    TOP DYKE        13
             1.12
 4500                 2245.80      538.64     88    G/L MON 359 RB  13
 
JOIN  19568-4500  N 56d50'43" W  245.80
