NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 3     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      532.51      0    DUMMY
          2000.00
  515                 2000.00      532.51      1    1997 0+00 X/S 3  
            29.86
 3404                 2029.86      539.12      2    AT MON 330 LB    3
             1.44
 3403                 2031.30      539.17      3    TOP DYKE         3
             2.78
 3402                 2034.07      538.13      4    .                3
             3.28
 3401                 2037.35      537.06      5    .                3
             4.08
 3400                 2041.43      535.94      6    .                3
             3.07
 3399                 2044.50      535.50      7    .                3
             4.56
 3398                 2049.06      534.88      8    TOE DYKE         3
             2.57
 3397                 2051.63      534.72      9    .                3
             4.62
 3396                 2056.26      534.72     10    .                3
             3.90
 3395                 2060.16      535.10     11    .                3
             4.48
 3394                 2064.64      535.58     12    .                3
             2.55
 3393                 2067.19      535.86     13    .                3
             1.12
 3392                 2068.31      535.48     14    TOP CUT          3
             0.17
 3391                 2068.48      534.57     15    TOE CUT          3
             1.40
 3390                 2069.88      533.79     16    .                3
             0.57
 3389                 2070.45      532.59     17    .                3
             0.40
 3388                 2070.85      532.08     18    WL LB            3
             2.46
 3387                 2073.30      531.64     19    .45              3
             1.46
 3386                 2074.77      531.05     20    1.05             3
             2.56
 3385                 2077.33      530.15     21    1.94             3
             0.68
 3384                 2078.02      529.90     22    FIX 522          3
             4.29
 3383                 2082.30      528.60     23    SUND BP 521-522  3
             0.13
 3382                 2082.43      528.00     24    SUND BP 521-522  3
             2.99
 3381                 2085.42      526.40     25    FIX 521          3
X/S 3     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.16
 3380                 2087.58      525.95     26    SUND BP 520-521  3
             1.52
 3379                 2089.10      525.65     27    SUND BP 520-521  3
             1.65
 3378                 2090.75      525.10     28    SUND BP 520-521  3
             2.28
 3377                 2093.03      524.80     29    FIX 520          3
             8.02
 3376                 2101.05      524.20     30    FIX 519          3
             3.62
 3375                 2104.67      524.15     31    SUND BP 518-519  3
             3.23
 3374                 2107.90      524.20     32    FIX 518          3
             2.91
 3373                 2110.81      524.35     33    SUND BP 517-518  3
             3.16
 3372                 2113.97      524.35     34    FIX 517          3
             5.47
 3371                 2119.44      524.35     35    SUND BP 516-517  3
             1.44
 3370                 2120.88      524.30     36    FIX 516          3
             2.81
 3369                 2123.69      524.00     37    SUND BP 515-516  3
             4.28
 3368                 2127.96      523.65     38    FIX 515          3
             1.99
 3367                 2129.95      523.55     39    SUND BP 514-515  3
             0.85
 3366                 2130.80      523.30     40    SUND BP 514-515  3
             4.26
 3365                 2135.07      521.15     41    SUND BP 514-515  3
             0.99
 3364                 2136.06      521.15     42    FIX 514          3
             1.08
 3363                 2137.14      521.60     43    SUND BP 513-514  3
             1.22
 3362                 2138.36      521.80     44    SUND BP 513-514  3
             1.63
 3361                 2139.99      521.70     45    SUND BP 513-514  3
             6.23
 3360                 2146.22      523.05     46    FIX 513          3
             2.09
 3359                 2148.31      523.35     47    SUND BP 512-513  3
             1.79
 3358                 2150.10      523.35     48    SUND BP 512-513  3
             0.30
 3357                 2150.40      523.10     49    SUND BP 512-513  3
             2.98
 3356                 2153.38      523.35     50    FIX 512          3
             2.33
X/S 3     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 3355                 2155.71      523.40     51    SUND BP 511-512  3
             4.52
 3354                 2160.23      523.30     52    FIX 511          3
             8.32
 3353                 2168.55      523.46     53    FIX 510          3
             2.61
 3352                 2171.16      523.40     54    SUND BP 509-510  3
             4.27
 3351                 2175.43      523.10     55    SUND BP 509-510  3
             1.24
 3350                 2176.67      523.15     56    SUND BP 509-510  3
             0.41
 3349                 2177.08      523.10     57    FIX 509          3
             1.96
 3348                 2179.04      523.15     58    SUND BP 508-509  3
             2.38
 3347                 2181.42      523.00     59    SUND BP 508-509  3
             1.12
 3346                 2182.53      523.10     60    SUND BP 508-509  3
             3.78
 3345                 2186.31      523.25     61    SUND BP 508-509  3
             1.40
 3344                 2187.71      523.21     62    FIX 508          3
             2.69
 3343                 2190.40      523.21     63    SUND BP 507-508  3
             0.63
 3342                 2191.03      523.30     64    SUND BP 507-508  3
             1.58
 3341                 2192.61      523.30     65    SUND BP 507-508  3
             1.42
 3340                 2194.04      523.21     66    SUND BP 507-508  3
             1.42
 3339                 2195.46      523.15     67    FIX 507          3
             0.72
 3338                 2196.19      523.15     68    SUND BP 506-507  3
             2.32
 3337                 2198.51      523.46     69    SUND BP 506-507  3
             1.01
 3336                 2199.52      523.40     70    SUND BP 506-507  3
             2.90
 3335                 2202.42      523.71     71    SUND BP 506-507  3
             2.17
 3334                 2204.60      523.85     72    FIX 506          3
             1.42
 3333                 2206.02      524.10     73    SUND BP 505-506  3
             2.49
 3332                 2208.51      524.30     74    SUND BP 505-506  3
             3.38
 3331                 2211.89      524.20     75    SUND BP 505-506  3
             3.02
 3330                 2214.91      524.50     76    FIX 505          3
X/S 3     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.75
 3329                 2217.67      524.50     77    SUND BP 504-505  3
             2.20
 3328                 2219.87      524.35     78    SUND BP 504-505  3
             1.29
 3327                 2221.15      524.35     79    SUND BP 504-505  3
             1.29
 3326                 2222.44      524.40     80    SUND BP 504-505  3
             1.29
 3325                 2223.73      524.25     81    SUND BP 504-505  3
             0.92
 3324                 2224.64      524.35     82    FIX 504          3
             1.94
 3323                 2226.59      524.90     83    SUND BP 503-504  3
             4.37
 3322                 2230.96      525.60     84    SUND BP 503-504  3
             3.73
 3321                 2234.69      526.65     85    FIX 503          3
             1.66
 3320                 2236.35      527.30     86    SUND BP 502-503  3
             4.52
 3319                 2240.87      528.60     87    FIX 502          3
             1.80
 3318                 2242.67      529.20     88    SUND BP 501-502  3
             1.03
 3317                 2243.69      529.47     89    2.63             3
             0.76
 3316                 2244.46      530.00     90    2.13             3
             0.15
 3315                 2244.61      530.10     91    FIX 501          3
             1.97
 3314                 2246.58      530.57     92    1.5              3
             1.30
 3313                 2247.88      530.98     93    1.12             3
             1.53
 3312                 2249.41      531.72     94    .4               3
             1.69
 3311                 2251.09      532.09     95    WL RB            3
             0.85
 3310                 2251.94      532.45     96    .                3
             0.44
 3309                 2252.38      533.45     97    .                3
             0.55
 3308                 2252.93      533.68     98    .                3
             0.96
 3307                 2253.89      534.71     99    .                3
             0.43
 3306                 2254.32      535.70    100    .                3
             1.03
 3305                 2255.35      536.20    101    .                3
             1.43
X/S 3     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 3304                 2256.78      536.19    102    .                3
             1.23
 3303                 2258.01      536.61    103    .                3
             0.65
 3302                 2258.67      537.22    104    .                3
             1.70
 3301                 2260.37      537.60    105    TOP              3
             1.41
 3300                 2261.78      537.73    106    G/L MON 329 RB   3
 
JOIN  515-3300  N 26d55'15" E  261.78
