NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 4     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      533.92      0    DUMMY
          2000.00
 6808                 2000.00      533.92      1    1986 0+00 X/S 4
            25.32
 3596                 2025.32      539.14      2    AT MON 332 LB    4
             1.44
 3595                 2026.76      539.20      3    TOP DYKE         4
             0.84
 3594                 2027.60      538.96      4    .                4
             2.13
 3593                 2029.73      537.92      5    .                4
             2.70
 3592                 2032.43      537.01      6    .                4
             2.30
 3591                 2034.73      536.44      7    .                4
             5.20
 3590                 2039.93      535.43      8    .                4
             6.22
 3589                 2046.14      534.53      9    .                4
             4.39
 3588                 2050.53      534.12     10    .                4
             3.52
 3587                 2054.05      533.73     11    .                4
             5.05
 3586                 2059.10      533.98     12    .                4
             1.53
 3585                 2060.64      533.90     13    TOP CUT          4
             0.71
 3584                 2061.35      532.62     14    TOE CUT          4
             2.15
 3583                 2063.50      532.09     15    WL LB            4
             3.08
 3582                 2066.58      531.56     16    .54              4
             2.32
 3581                 2068.90      530.63     17    FIX 525          4
             0.24
 3580                 2069.14      530.56     18    1.54             4
             2.06
 3579                 2071.20      529.98     19    SUND BP 524-525  4
             1.09
 3578                 2072.29      529.58     20    SUND BP 524-525  4
             3.03
 3577                 2075.31      527.88     21    SUND BP 524-525  4
             0.12
 3576                 2075.43      527.58     22    SUND BP 524-525  4
             1.45
 3575                 2076.88      526.98     23    FIX 524          4
             5.27
 3574                 2082.15      525.38     24    SUND BP 523-524  4
             1.92
 3573                 2084.07      525.03     25    FIX 523          4
X/S 4     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.98
 3572                 2085.05      525.03     26    SUND BP 522-523  4
             0.86
 3571                 2085.91      525.28     27    SUND BP 522-523  4
             1.10
 3570                 2087.01      525.33     28    SUND BP 522-523  4
             1.47
 3569                 2088.49      524.98     29    SUND BP 522-523  4
             2.58
 3568                 2091.06      524.13     30    SUND BP 522-523  4
             0.86
 3567                 2091.92      524.18     31    FIX 522          4
             2.38
 3566                 2094.30      523.58     32    SUND BP 521-522  4
             0.37
 3565                 2094.67      523.33     33    SUND BP 521-522  4
             1.00
 3564                 2095.67      523.13     34    SUND BP 521-522  4
             3.25
 3563                 2098.92      523.28     35    FIX 521          4
             1.01
 3562                 2099.93      523.38     36    SUND BP 520-521  4
             1.64
 3561                 2101.57      523.38     37    SUND BP 520-521  4
             3.52
 3560                 2105.09      523.23     38    SUND BP 520-521  4
             0.88
 3559                 2105.97      523.28     39    FIX 520          4
             2.15
 3558                 2108.12      523.08     40    SUND BP 519-520  4
             1.67
 3557                 2109.79      523.08     41    SUND BP 519-520  4
             2.63
 3556                 2112.42      522.98     42    SUND BP 519-520  4
             1.19
 3555                 2113.61      523.03     43    FIX 519          4
             4.24
 3554                 2117.85      523.33     44    SUND BP 518-519  4
             4.24
 3553                 2122.09      523.48     45    FIX 518          4
             6.79
 3552                 2128.88      523.88     46    FIX 517          4
             5.24
 3551                 2134.13      524.08     47    SUND BP 516-517  4
             1.25
 3550                 2135.38      524.38     48    FIX 516          4
             3.65
 3549                 2139.02      523.98     49    SUND BP 515-516  4
             1.65
 3548                 2140.67      524.28     50    SUND BP 515-516  4
             3.18
X/S 4     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 3547                 2143.85      524.38     51    FIX 515          4
             7.75
 3546                 2151.59      524.58     52    FIX 514          4
             2.29
 3545                 2153.88      524.73     53    SUND BP 513-514  4
             3.78
 3544                 2157.66      524.78     54    FIX 513          4
             6.11
 3543                 2163.77      524.68     55    FIX 512          4
             0.98
 3542                 2164.75      524.68     56    SUND BP 511-512  4
             2.72
 3541                 2167.48      524.93     57    SUND BP 511-512  4
             1.74
 3540                 2169.22      524.93     58    SUND BP 511-512  4
             1.09
 3539                 2170.31      524.58     59    FIX 511          4
             2.20
 3538                 2172.51      524.53     60    SUND BP 510-511  4
             3.79
 3537                 2176.31      524.33     61    SUND BP 510-511  4
             0.86
 3536                 2177.16      524.38     62    FIX 510          4
             2.43
 3535                 2179.60      524.28     63    SUND BP 509-510  4
             3.94
 3534                 2183.54      524.48     64    FIX 509          4
             0.80
 3533                 2184.34      524.68     65    SUND BP 508-509  4
             2.39
 3532                 2186.73      524.83     66    SUND BP 508-509  4
             5.45
 3531                 2192.19      524.78     67    FIX 508          4
             6.73
 3530                 2198.92      524.63     68    SUND BP 507-508  4
             1.24
 3529                 2200.15      524.68     69    FIX 507          4
             2.69
 3528                 2202.84      524.78     70    SUND BP 506-507  4
             0.94
 3527                 2203.78      524.38     71    SUND BP 506-507  4
             1.21
 3526                 2204.99      524.38     72    SUND BP 506-507  4
             0.67
 3525                 2205.66      524.63     73    SUND BP 506-507  4
             1.34
 3524                 2207.00      524.43     74    SUND BP 506-507  4
             0.54
 3523                 2207.54      524.43     75    FIX 506          4
             3.73
 3522                 2211.26      524.63     76    SUND BP 505-506  4
X/S 4     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.49
 3521                 2213.75      524.63     77    SUND BP 505-506  4
             2.07
 3520                 2215.82      524.53     78    FIX 505          4
             3.54
 3519                 2219.36      524.58     79    SUND BP 504-505  4
             0.75
 3518                 2220.11      524.38     80    SUND BP 504-505  4
             1.49
 3517                 2221.60      524.58     81    SUND BP 504-505  4
             2.24
 3516                 2223.84      524.68     82    SUND BP 504-505  4
             1.31
 3515                 2225.14      524.98     83    FIX 504          4
             6.97
 3514                 2232.11      527.08     84    FIX 503          4
             4.88
 3513                 2236.99      529.58     85    FIX 502          4
             0.79
 3512                 2237.78      530.03     86    SUND BP 501-502  4
             1.03
 3511                 2238.81      530.28     87    SUND BP 501-502  4
             0.06
 3510                 2238.87      530.22     88    1.88             4
             0.76
 3509                 2239.62      530.44     89    1.67             4
             0.37
 3508                 2239.99      530.58     90    FIX 501          4
             1.90
 3507                 2241.90      530.88     91    1.22             4
             1.84
 3506                 2243.74      531.54     92    .56              4
             2.46
 3505                 2246.20      532.08     93    WL RB            4
             1.06
 3504                 2247.26      532.54     94    .                4
             1.24
 3503                 2248.50      534.19     95    .                4
             1.66
 3502                 2250.16      535.76     96    .                4
             0.87
 3501                 2251.03      537.36     97    TOP              4
             3.70
 3500                 2254.73      537.60     98    G/L MON 331 RB   4
 
JOIN  6808-3500  N 29d39'50" E  254.73