NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 9     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      534.92      0    DUMMY
          2000.00
16575                 2000.00      534.92      1    1973 0+00 X/S 9  
            21.86
 4094                 2021.86      538.87      2    AT MON 352 LB    9
             1.28
 4093                 2023.13      538.94      3    TOP DYKE         9
             1.94
 4092                 2025.07      537.72      4    .                9
             4.65
 4091                 2029.72      536.25      5    TOE DYKE         9
             4.71
 4090                 2034.43      535.81      6    TOP              9
             1.53
 4089                 2035.97      535.09      7    TOE              9
             2.27
 4088                 2038.24      535.29      8    TOE              9
             2.09
 4087                 2040.33      536.35      9    TOP              9
             3.53
 4086                 2043.85      536.35     10    TOP CUT          9
             0.42
 4085                 2044.28      535.04     11    TOE CUT          9
             2.34
 4084                 2046.62      535.06     12    .                9
             0.99
 4083                 2047.61      534.74     13    TOP CUT          9
             0.79
 4082                 2048.40      532.07     14    WL LB            9
             1.09
 4081                 2049.49      531.71     15    .39              9
             2.06
 4080                 2051.55      531.05     16    1.05             9
             1.43
 4079                 2052.98      530.57     17    1.51             9
             1.96
 4078                 2054.94      529.86     18    2.24             9
             0.36
 4077                 2055.30      529.79     19    FIX 519          9
             1.45
 4076                 2056.75      529.59     20    SUND BP 518-519  9
             4.14
 4075                 2060.89      525.74     21    SUND BP 518-519  9
             1.03
 4074                 2061.92      525.59     22    FIX 518          9
             4.03
 4073                 2065.96      524.29     23    SUND BP 517-518  9
             1.64
 4072                 2067.59      524.29     24    FIX 517          9
             3.37
 4071                 2070.97      524.04     25    SUND BP 516-517  9
X/S 9     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             4.00
 4070                 2074.97      522.84     26    SUND BP 516-517  9
             0.62
 4069                 2075.59      522.84     27    FIX 516          9
             2.15
 4068                 2077.74      522.70     28    SUND BP 515-516  9
             4.84
 4067                 2082.58      520.39     29    SUND BP 515-516  9
             1.34
 4066                 2083.92      520.39     30    FIX 515          9
             0.80
 4065                 2084.72      520.69     31    SUND BP 514-515  9
             1.59
 4064                 2086.31      521.04     32    SUND BP 514-515  9
             2.12
 4063                 2088.43      520.99     33    SUND BP 514-515  9
             0.66
 4062                 2089.09      520.69     34    SUND BP 514-515  9
             3.05
 4061                 2092.14      520.69     35    FIX 514          9
             6.57
 4060                 2098.71      520.39     36    SUND BP 513-514  9
             1.79
 4059                 2100.50      520.49     37    FIX 513          9
             0.47
 4058                 2100.98      520.44     38    SUND BP 512-513  9
             4.26
 4057                 2105.23      520.79     39    SUND BP 512-513  9
             3.94
 4056                 2109.17      521.49     40    FIX 512          9
             5.37
 4055                 2114.55      522.34     41    SUND BP 511-512  9
             3.91
 4054                 2118.46      522.89     42    FIX 511          9
             1.58
 4053                 2120.04      522.99     43    SUND BP 510-511  9
             1.58
 4052                 2121.62      522.99     44    SUND BP 510-511  9
             3.96
 4051                 2125.58      523.39     45    SUND BP 510-511  9
             2.69
 4050                 2128.27      523.39     46    FIX 510          9
             1.86
 4049                 2130.13      523.29     47    SUND BP 509-510  9
             4.89
 4048                 2135.02      523.39     48    SUND BP 509-510  9
             1.86
 4047                 2136.87      523.39     49    SUND BP 509-510  9
             2.02
 4046                 2138.90      523.34     50    FIX 509          9
             1.85
X/S 9     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 4045                 2140.75      523.20     51    SUND BP 508-509  9
             2.16
 4044                 2142.92      523.29     52    SUND BP 508-509  9
             2.47
 4043                 2145.39      523.24     53    SUND BP 508-509  9
             3.40
 4042                 2148.79      523.09     54    FIX 508          9
             2.62
 4041                 2151.41      523.04     55    SUND BP 507-508  9
             2.97
 4040                 2154.38      523.04     56    SUND BP 507-508  9
             3.15
 4039                 2157.53      522.79     57    FIX 507          9
             1.60
 4038                 2159.13      522.34     58    SUND BP 506-507  9
             2.32
 4037                 2161.45      521.59     59    SUND BP 506-507  9
             2.03
 4036                 2163.48      521.69     60    SUND BP 506-507  9
             0.44
 4035                 2163.92      521.69     61    SUND BP 506-507  9
             2.61
 4034                 2166.53      521.49     62    FIX 506          9
             2.98
 4033                 2169.51      521.09     63    SUND BP 505-506  9
             2.51
 4032                 2172.01      521.34     64    SUND BP 505-506  9
             2.19
 4031                 2174.21      522.09     65    SUND BP 505-506  9
             4.39
 4030                 2178.60      523.34     66    FIX 505          9
             4.10
 4029                 2182.70      524.84     67    SUND BP 504-505  9
             1.86
 4028                 2184.56      525.29     68    SUND BP 504-505  9
             1.74
 4027                 2186.30      525.39     69    FIX 504          9
             2.64
 4026                 2188.95      525.39     70    SUND BP 503-504  9
             1.53
 4025                 2190.48      525.59     71    SUND BP 503-504  9
             1.81
 4024                 2192.29      525.69     72    SUND BP 503-504  9
             2.23
 4023                 2194.51      525.69     73    SUND BP 503-504  9
             0.97
 4022                 2195.49      525.79     74    FIX 503          9
             2.81
 4021                 2198.30      525.79     75    SUND BP 502-503  9
             3.35
 4020                 2201.64      526.09     76    SUND BP 502-503  9
X/S 9     KOOTENAY RIVER     PROJECT 9217R011     JUNE 1992
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.74
 4019                 2203.38      525.89     77    SUND BP 502-503  9
             0.27
 4018                 2203.65      526.14     78    FIX 502          9
             3.27
 4017                 2206.92      529.19     79    SUND BP 501-502  9
             1.92
 4016                 2208.84      528.69     80    SUND BP 501-502  9
             1.15
 4015                 2209.99      528.89     81    FIX 501          9
             4.12
 4014                 2214.11      530.35     82    1.72             9
             1.52
 4013                 2215.63      530.72     83    1.38             9
             1.66
 4012                 2217.29      531.41     84    .68              9
             1.63
 4011                 2218.92      531.73     85    .39              9
             2.22
 4010                 2221.14      532.09     86    WL RB            9
             0.21
 4009                 2221.35      532.18     87    .                9
             0.01
 4008                 2221.36      532.55     88    .                9
             0.80
 4007                 2222.16      532.80     89    .                9
             0.21
 4006                 2222.37      533.57     90    .                9
             0.71
 4005                 2223.08      534.21     91    .                9
             0.75
 4004                 2223.83      535.38     92    .                9
             0.33
 4003                 2224.16      536.87     93    .                9
             1.26
 4002                 2225.42      537.26     94    .                9
             1.34
 4001                 2226.76      537.49     95    .                9
             1.83
 4000                 2228.59      537.49     96    G/L MON 351 RB   9
 
JOIN  16575-4000  S 58d47'0" E  228.59
