NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 12     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      536.09      0    DUMMY
          2000.00
  208                 2000.00      536.09      1    1997 0+00 X/S 12 
            10.27
  207                 2010.27      536.39      2    FIELD LEVEL      12 
             3.91
  206                 2014.19      536.67      3    TOE DYKE         12 
             3.88
  205                 2018.07      537.40      4    .                12 
             1.80
  204                 2019.87      537.98      5    .                12 
             1.17
  203                 2021.05      538.27      6    .                12 
             1.65
  202                 2022.70      538.59      7    G/L MON 358 LB   12 
             0.96
  201                 2023.66      538.85      8    TOP DYKE         12 
             1.50
  200                 2025.16      539.00      9    C/L DYKE         12 
             1.81
  199                 2026.97      539.03     10    TOP DYKE         12 
             1.19
  198                 2028.16      538.79     11    .                12 
             1.34
  197                 2029.50      538.26     12    .                12 
             1.74
  196                 2031.24      537.89     13    .                12 
             3.39
  195                 2034.64      537.54     14    .                12 
             3.14
  194                 2037.78      536.77     15    TOE              12 
             1.79
  193                 2039.57      536.61     16    .                12 
             0.99
  192                 2040.56      536.42     17    TOP CUT          12 
             0.58
  191                 2041.14      535.46     18    .                12 
             0.28
  190                 2041.42      535.37     19    .                12 
             0.23
  189                 2041.65      534.48     20    .                12 
             0.46
  188                 2042.10      534.07     21    .                12 
             0.92
  187                 2043.02      533.68     22    .                12 
             0.28
  186                 2043.29      533.24     23    .                12 
             0.25
  185                 2043.54      533.14     24    .                12 
             0.06
  184                 2043.60      532.88     25    .                12 
X/S 12     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.57
  183                 2044.17      532.74     26    .                12 
             0.38
  182                 2044.54      532.27     27    .                12 
             0.43
  181                 2044.97      532.22     28    .                12 
             0.32
  180                 2045.29      532.10     29    WL LB 1634       12 
             0.40
  179                 2045.69      531.73     30    .                12 
             0.93
  178                 2046.62      531.46     31    .                12 
             0.32
  177                 2046.94      530.76     32    .                12 
             0.94
  176                 2047.88      530.36     33    .                12 
             0.44
  175                 2048.33      529.91     34    .                12 
             0.84
  174                 2049.17      529.50     35    .                12 
             0.29
  173                 2049.46      529.09     36    .                12 
             0.27
  172                 2049.74      528.90     37    .                12 
             0.37
  171                 2050.10      528.73     38    .                12 
             0.33
  170                 2050.44      528.52     39    .                12 
             1.42
  169                 2051.86      528.22     40    .                12 
             2.30
  168                 2054.15      527.41     41    FIX 168          12 
             3.47
  938                 2057.62      526.01     42    SUND BP          12 
             3.30
  167                 2060.92      526.06     43    FIX 167          12 
             2.36
  937                 2063.28      525.96     44    SUND BP          12 
             3.95
  166                 2067.24      525.61     45    FIX 166          12 
             6.28
  165                 2073.51      525.81     46    FIX 165          12 
             6.08
  164                 2079.59      525.61     47    FIX 164          12 
             8.57
  163                 2088.17      525.51     48    FIX 163          12 
             7.00
  162                 2095.16      525.41     49    FIX 162          12 
             6.07
  161                 2101.24      525.21     50    FIX 161          12 
             7.41
X/S 12     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
  160                 2108.65      525.01     51    FIX 160          12 
             3.09
  936                 2111.74      525.11     52    SUND BP          12 
             4.78
  159                 2116.52      525.11     53    FIX 159          12 
             5.73
  158                 2122.25      525.01     54    FIX 158          12 
             2.13
  935                 2124.39      524.91     55    SUND BP          12 
             3.99
  157                 2128.38      524.91     56    FIX 157          12 
             1.17
  934                 2129.55      524.71     57    SUND BP          12 
             5.06
  156                 2134.61      524.61     58    FIX 156          12 
             5.76
  155                 2140.37      524.46     59    FIX 155          12 
             2.25
  933                 2142.62      524.21     60    SUND BP          12 
             4.42
  154                 2147.04      521.91     61    FIX 154          12 
             6.87
  153                 2153.91      518.91     62    FIX 153          12 
             6.35
  152                 2160.26      516.01     63    FIX 152          12 
             6.40
  151                 2166.66      513.81     64    FIX 151          12 
             4.40
  932                 2171.06      512.51     65    SUND BP          12 
             2.17
  150                 2173.23      512.51     66    FIX 150          12 
             0.56
  931                 2173.79      514.01     67    SUND BP          12 
             2.47
  930                 2176.26      514.41     68    SUND BP          12 
             1.90
  149                 2178.16      515.41     69    FIX 149          12 
             5.81
  148                 2183.97      518.01     70    FIX 148          12 
             5.76
  147                 2189.73      523.81     71    FIX 147          12 
             6.65
  146                 2196.38      524.91     72    FIX 146          12 
             5.68
  145                 2202.06      526.11     73    FIX 145          12 
             4.68
  144                 2206.74      528.21     74    FIX 144          12 
             1.31
  140                 2208.05      529.24     75    .                12 
             3.54
  139                 2211.59      530.45     76    .                12 
X/S 12     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.69
  138                 2212.28      530.61     77    .                12 
             1.54
  137                 2213.82      531.10     78    .                12 
             1.65
  136                 2215.47      531.72     79    .                12 
             1.81
  135                 2217.28      532.12     80    WL RB 1609 HRS   12 
             0.53
  134                 2217.81      532.33     81    .                12 
             0.49
  133                 2218.30      532.80     82    .                12 
             0.44
  132                 2218.74      533.50     83    .                12 
             0.92
  131                 2219.66      534.39     84    .                12 
             0.59
  130                 2220.26      534.62     85    .                12 
             0.38
  129                 2220.64      535.91     86    TOP CUT          12 
             0.74
  128                 2221.38      535.83     87    .                12 
             1.71
  127                 2223.08      535.63     88    .                12 
             0.85
  126                 2223.93      535.68     89    TOE DYKE         12 
             0.63
  125                 2224.57      535.83     90    .                12 
             1.14
  124                 2225.71      536.08     91    .                12 
             1.74
  123                 2227.45      536.44     92    .                12 
             1.91
  122                 2229.37      537.00     93    .                12 
             1.24
  121                 2230.61      537.30     94    .                12 
             0.53
  120                 2231.14      537.53     95    EDGE ACCESS      12 
             2.01
  119                 2233.15      537.66     96    .                12 
             0.54
  118                 2233.69      537.83     97    .                12 
             1.56
  117                 2235.25      538.05     98    .                12 
             0.60
  116                 2235.85      538.28     99    EDGE ACCESS      12 
             0.84
  115                 2236.69      538.39    100    G/L MON 765 RB   12 
             1.10
  114                 2237.79      538.51    101    .                12 
             0.50
X/S 12     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
  113                 2238.29      538.74    102    TOP DYKE         12 
             0.54
  112                 2238.83      538.70    103    .                12 
             0.46
  111                 2239.29      538.82    104    .                12 
             0.77
  110                 2240.06      538.84    105    C/L DYKE         12 
             1.38
  109                 2241.44      538.78    106    TOP DYKE         12 
             1.40
  108                 2242.84      538.23    107    .                12 
             1.30
  107                 2244.14      537.83    108    .                12 
             2.23
  106                 2246.38      537.36    109    .                12 
             1.98
  105                 2248.36      536.88    110    .                12 
             2.60
  104                 2250.96      535.88    111    TOE DYKE         12 
             0.68
  103                 2251.64      535.85    112    FENCE LINE       12 
             2.23
  102                 2253.87      535.75    113    .                12 
             2.47
  101                 2256.34      535.65    114    .                12 
             5.52
  100                 2261.86      535.70    115    FIELD            12 
 
JOIN  208-100  N 4d0'2" W  261.86
