NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 19     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      535.73      0    DUMMY
          2000.00
20181                 2000.00      535.73      1    1968 0+00 X/S 19
             2.40
 2214                 2002.40      535.75      2    FIELD LEVEL     19  
             4.87
 2215                 2007.26      536.01      3    .               19  
             3.52
 2216                 2010.78      536.22      4    TOE DYKE        19  
             1.55
 2217                 2012.33      536.63      5    FENCE LINE      19  
             0.58
 2218                 2012.91      536.65      6    .               19  
             1.50
 2219                 2014.41      537.38      7    .               19  
             1.67
 2220                 2016.08      538.23      8    .               19  
             0.57
 2221                 2016.65      538.36      9    TOP DYKE        19  
             1.19
 2222                 2017.85      538.36     10    G/L MON 402 LB  19  
             1.32
 2223                 2019.16      538.28     11    TOP DYKE        19  
             1.58
 2224                 2020.74      537.50     12    .               19  
             1.88
 2225                 2022.63      536.73     13    .               19  
             1.48
 2226                 2024.11      536.33     14    .               19  
             1.58
 2227                 2025.70      535.99     15    .               19  
             0.77
 2228                 2026.47      535.79     16    TOE DYKE        19  
             1.19
 2229                 2027.66      535.60     17    .               19  
             1.40
 2230                 2029.06      535.51     18    .               19  
             3.16
 2231                 2032.22      535.53     19    .               19  
             1.37
 2232                 2033.59      535.57     20    .               19  
             2.54
 2233                 2036.13      535.93     21    .               19  
             1.33
 2234                 2037.46      536.10     22    .               19  
             1.56
 2235                 2039.02      536.03     23    .               19  
             0.56
 2236                 2039.58      535.94     24    .               19  
             1.10
 2237                 2040.68      535.72     25    TOP CUT         19  
X/S 19     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.17
 2238                 2040.85      534.78     26    TOE CUT         19  
             0.67
 2239                 2041.52      534.58     27    .               19  
             0.18
 2240                 2041.70      534.30     28    .               19  
             0.81
 2241                 2042.51      533.93     29    .               19  
             0.45
 2242                 2042.96      533.11     30    .               19  
             0.44
 2243                 2043.40      532.79     31    .               19  
             0.45
 2244                 2043.85      532.64     32    .               19  
             0.27
 2245                 2044.12      532.26     33    TOE BANK        19  
             0.65
 2246                 2044.77      532.07     34    .               19  
             0.61
 2247                 2045.38      531.95     35    WL LB 1503HRS   19  
             0.98
 2248                 2046.36      531.78     36    .               19  
             2.32
 2249                 2048.68      530.92     37    D1.02           19  
             1.34
 2250                 2050.02      530.29     38    .               19  
             1.09
 2251                 2051.11      529.23     39    .               19  
             1.77
 2252                 2052.88      528.61     40    .               19  
             1.27
 2253                 2054.15      528.04     41    .               19  
             2.62
 2256                 2056.77      526.94     42    FIX 256         19  
             5.11
 2257                 2061.88      525.04     43    FIX 257         19  
             5.46
 2258                 2067.33      524.19     44    FIX 258         19  
             7.67
 2259                 2075.01      523.14     45    FIX 259         19  
             7.38
 2260                 2082.39      522.24     46    FIX 260         19  
             5.08
 2039                 2087.48      521.74     47    SUND BP         19  
             0.98
 2040                 2088.46      521.44     48    SUND BP         19  
             2.23
 2261                 2090.69      521.24     49    FIX 261         19  
             4.45
 2041                 2095.13      521.14     50    SUND BP         19  
             3.66
X/S 19     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 2262                 2098.79      520.24     51    FIX 262         19  
             1.66
 2042                 2100.45      520.19     52    SUND BP         19  
             6.38
 2263                 2106.84      520.34     53    FIX 263         19  
             7.39
 2264                 2114.23      520.44     54    FIX 264         19  
             1.38
 2043                 2115.61      520.39     55    SUND BP         19  
             2.03
 2044                 2117.64      520.04     56    SUND BP         19  
             4.22
 2265                 2121.86      520.14     57    FIX 265         19  
             7.16
 2266                 2129.02      519.94     58    FIX 266         19  
             6.60
 2267                 2135.63      520.14     59    FIX 267         19  
             7.18
 2268                 2142.81      520.24     60    FIX 268         19  
             1.79
 2045                 2144.59      520.04     61    SUND BP         19  
             3.90
 2046                 2148.49      520.04     62    SUND BP         19  
             1.79
 2269                 2150.27      519.84     63    FIX 269         19  
             1.96
 2047                 2152.23      519.74     64    SUND BP         19  
             5.65
 2270                 2157.89      520.14     65    FIX 270         19  
             5.23
 2048                 2163.11      519.84     66    SUND BP         19  
             2.46
 2271                 2165.57      519.54     67    FIX 271         19  
             7.10
 2272                 2172.68      520.14     68    FIX 272         19  
             2.06
 2049                 2174.73      520.44     69    SUND BP         19  
             1.98
 2050                 2176.72      522.04     70    SUND BP         19  
             3.20
 2273                 2179.92      523.54     71    FIX 273         19  
             6.22
 2274                 2186.14      527.44     72    FIX 274         19  
             2.70
 2277                 2188.84      529.36     73    .               19  
             3.03
 2278                 2191.87      529.96     74    .               19  
             4.14
 2279                 2196.00      530.56     75    .               19  
             1.87
 2280                 2197.87      531.02     76    .               19  
X/S 19     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.98
 2281                 2198.85      531.33     77    .               19  
             1.37
 2282                 2200.22      531.63     78    .               19  
             1.48
 2284                 2201.71      531.92     79    WL RB 1517HRS   19  
             1.03
 2285                 2202.74      532.36     80    .               19  
             1.29
 2286                 2204.02      532.83     81    .               19  
             0.57
 2287                 2204.59      533.09     82    .               19  
             0.55
 2288                 2205.14      533.77     83    .               19  
             0.84
 2289                 2205.98      534.02     84    .               19  
             0.98
 2290                 2206.96      534.36     85    .               19  
             2.31
 2291                 2209.27      534.42     86    .               19  
             2.44
 2292                 2211.72      534.61     87    .               19  
             2.59
 2293                 2214.31      534.90     88    TOE DYKE        19  
             3.20
 2294                 2217.51      535.45     89    .               19  
             2.47
 2295                 2219.98      536.04     90    .               19  
             1.51
 2296                 2221.48      536.28     91    .               19  
             1.96
 2297                 2223.44      536.87     92    .               19  
             1.05
 2298                 2224.49      537.48     93    .               19  
             1.17
 2299                 2225.66      538.25     94    .               19  
             0.73
 2300                 2226.39      538.39     95    .               19  
             0.44
 2301                 2226.83      538.47     96    TOP DYKE        19  
             1.49
 2302                 2228.32      538.58     97    G/L MON 401 RB  19  
             1.51
 2303                 2229.83      538.52     98    TOP DYKE        19  
             0.58
 2304                 2230.41      538.38     99    .               19  
             0.90
 2305                 2231.31      538.15    100    .               19  
             2.00
 2306                 2233.32      537.56    101    .               19  
             2.94
X/S 19     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 2307                 2236.26      536.48    102    .               19  
             1.51
 2308                 2237.76      536.13    103    TOE DYKE        19  
             0.95
 2309                 2238.71      536.04    104    .               19  
             0.55
 2310                 2239.26      535.81    105    FENCE LINE      19  
             0.85
 2311                 2240.11      535.59    106    .               19  
             2.62
 2312                 2242.73      535.47    107    FIELD LEVEL     19  
             4.40
 2313                 2247.13      535.32    108    FIELD LEVEL     19  
 
JOIN  20181-2313  N 11d0'52" W  247.13