NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 24     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      538.11      0    DUMMY
          2000.00
 2509                 2000.00      538.11      1    1997 0+00 X/S 24  
             0.70
 2510                 2000.70      537.06      2    .               24  
             0.63
 2511                 2001.33      536.82      3    .               24  
             0.62
 2512                 2001.95      536.31      4    TOE ROCK SLOPE  24  
             0.97
 2513                 2002.91      536.15      5    G/L MON 411 LB  24  
             0.79
 2514                 2003.71      536.24      6    TOP LEDGE       24  
             0.66
 2515                 2004.37      535.81      7    .               24  
             0.86
 2516                 2005.23      535.42      8    .               24  
             0.76
 2517                 2005.99      535.19      9    .               24  
             0.83
 2518                 2006.82      535.21     10    .               24  
             1.33
 2519                 2008.15      535.37     11    .               24  
             1.81
 2520                 2009.96      535.50     12    .               24  
             1.52
 2521                 2011.48      535.52     13    .               24  
             1.27
 2522                 2012.75      535.11     14    TOP CUT         24  
             0.18
 2523                 2012.93      533.88     15    TOE CUT         24  
             0.36
 2524                 2013.29      533.65     16    .               24  
             0.49
 2525                 2013.78      532.76     17    .               24  
             0.67
 2526                 2014.45      532.14     18    TOE BANK        24  
             0.99
 2527                 2015.43      532.00     19    .               24  
             0.15
 2528                 2015.58      531.83     20    WL LB 1134HRS   24  
             0.35
 2529                 2015.93      531.67     21    .               24  
             1.35
 2530                 2017.28      531.34     22    .               24  
             1.23
 2531                 2018.51      530.79     23    D1.04           24  
             1.65
 2532                 2020.16      530.18     24    .               24  
             0.79
 2533                 2020.95      529.50     25    .               24  
X/S 24     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.59
 2534                 2022.54      528.55     26    .               24  
             1.13
 2535                 2023.67      527.95     27    .               24  
             1.51
 2536                 2025.18      526.86     28    .               24  
             1.14
 2064                 2026.32      526.03     29    SUND BP         24  
             1.58
 2538                 2027.90      525.58     30    FIX 538         24  
             1.18
 2065                 2029.07      525.33     31    SUND BP         24  
             5.03
 2539                 2034.10      522.68     32    FIX 539         24  
             6.22
 2066                 2040.33      521.63     33    SUND BP         24  
             1.52
 2540                 2041.84      520.83     34    FIX 540         24  
             6.02
 2067                 2047.86      518.73     35    SUND BP         24  
             1.28
 2541                 2049.14      518.43     36    FIX 541         24  
             2.93
 2068                 2052.08      518.03     37    SUND BP         24  
             4.97
 2542                 2057.05      517.73     38    FIX 542         24  
             8.23
 2543                 2065.28      516.93     39    FIX 543         24  
             1.58
 2069                 2066.86      516.73     40    SUND BP         24  
             3.17
 2070                 2070.03      516.73     41    SUND BP         24  
             2.06
 2544                 2072.09      517.03     42    FIX 544         24  
             9.88
 2545                 2081.97      517.13     43    FIX 545         24  
             6.62
 2071                 2088.59      514.43     44    SUND BP         24  
             5.17
 2546                 2093.75      514.23     45    FIX 546         24  
             4.08
 2072                 2097.83      514.13     46    SUND BP         24  
             2.89
 2547                 2100.72      514.33     47    FIX 547         24  
             6.10
 2548                 2106.82      516.13     48    FIX 548         24  
             6.65
 2549                 2113.46      518.63     49    FIX 549         24  
             3.72
 2073                 2117.18      521.83     50    SUND BP         24  
             2.35
X/S 24     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 2550                 2119.53      523.13     51    FIX 550         24  
             2.50
 2551                 2122.03      524.45     52    .               24  
             0.65
 2552                 2122.68      525.41     53    .               24  
             1.93
 2553                 2124.61      527.50     54    .               24  
             2.34
 2554                 2126.95      529.28     55    D2.53           24  
             2.52
 2555                 2129.47      530.08     56    .               24  
             1.27
 2556                 2130.73      530.71     57    .               24  
             1.35
 2557                 2132.09      531.32     58    .               24  
             1.87
 2558                 2133.95      531.67     59    .               24  
             0.73
 2559                 2134.68      531.84     60    WL RB 1200HRS   24  
             0.69
 2560                 2135.38      532.11     61    .               24  
             0.42
 2561                 2135.80      532.43     62    .               24  
             1.16
 2562                 2136.96      533.16     63    .               24  
             0.47
 2563                 2137.43      533.51     64    .               24  
             0.33
 2564                 2137.76      533.86     65    TOE CUT         24  
             0.49
 2565                 2138.25      535.30     66    TOP CUT         24  
             0.38
 2566                 2138.63      535.49     67    .               24  
             1.21
 2567                 2139.84      535.78     68    .               24  
             2.28
 2568                 2142.12      536.08     69    .               24  
             1.43
 2569                 2143.55      536.33     70    .               24  
             0.89
 2570                 2144.44      536.29     71    G/L MON 410 RB  24  
             1.77
 2571                 2146.21      536.30     72    .               24  
             2.73
 2572                 2148.93      536.23     73    .               24  
 
JOIN  2509-2572  N 70d21'5" E  148.93
