NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 25     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      535.16      0    DUMMY
          2000.00
10500                 2000.00      535.16      1    1986 0+00 X/S 25
             2.52
 2446                 2002.52      535.26      2    .               25  
             2.42
 2447                 2004.94      535.36      3    .               25  
             2.07
 2448                 2007.01      535.53      4    .               25  
             0.95
 2449                 2007.96      535.52      5    G/L MON 413 LB  25  
             2.35
 2450                 2010.31      535.51      6    .               25  
             2.61
 2451                 2012.92      535.67      7    .               25  
             1.98
 2452                 2014.90      535.53      8    .               25  
             0.87
 2453                 2015.77      535.17      9    TOP CUT         25  
             0.11
 2454                 2015.88      533.39     10    TOE CUT         25  
             0.54
 2455                 2016.42      533.00     11    .               25  
             0.45
 2456                 2016.87      532.89     12    .               25  
             0.61
 2457                 2017.48      532.39     13    .               25  
             0.50
 2458                 2017.98      532.24     14    TOE BANK        25  
             1.16
 2459                 2019.15      532.08     15    .               25  
             0.15
 2460                 2019.30      531.89     16    .               25  
             0.39
 2461                 2019.69      531.85     17    WL LB 1031HRS   25  
             1.73
 2462                 2021.42      531.51     18    .               25  
             0.72
 2463                 2022.14      531.09     19    .               25  
             0.90
 2464                 2023.04      530.72     20    D1.14           25  
             1.27
 2465                 2024.31      530.00     21    .               25  
             0.66
 2466                 2024.97      528.72     22    .               25  
             1.44
 2467                 2026.41      527.85     23    .               25  
             1.58
 2468                 2027.98      526.37     24    .               25  
             1.32
 2470                 2029.30      525.35     25    FIX 470         25  
X/S 25     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.64
 2053                 2031.94      524.65     26    SUND BP         25  
             1.78
 2471                 2033.72      523.35     27    FIX 471         25  
             5.83
 2472                 2039.55      520.25     28    FIX 472         25  
             3.54
 2054                 2043.08      519.15     29    SUND BP         25  
             2.52
 2473                 2045.60      518.85     30    FIX 473         25  
             8.07
 2474                 2053.67      515.85     31    FIX 474         25  
             5.20
 2055                 2058.87      514.35     32    SUND BP         25  
             2.08
 2475                 2060.95      514.05     33    FIX 475         25  
             4.68
 2056                 2065.64      513.95     34    SUND BP         25  
             3.12
 2476                 2068.76      514.85     35    FIX 476         25  
             3.97
 2057                 2072.73      517.05     36    SUND BP         25  
             2.38
 2477                 2075.11      517.15     37    FIX 477         25  
             1.61
 2058                 2076.72      516.95     38    SUND BP         25  
             2.23
 2059                 2078.94      515.65     39    SUND BP         25  
             2.84
 2478                 2081.78      515.85     40    FIX 478         25  
             4.15
 2060                 2085.93      516.35     41    SUND BP         25  
             2.43
 2479                 2088.36      517.05     42    FIX 479         25  
             5.83
 2480                 2094.19      517.75     43    FIX 480         25  
             6.01
 2481                 2100.20      518.85     44    FIX 481         25  
             4.60
 2061                 2104.79      519.80     45    SUND BP         25  
             1.05
 2482                 2105.84      519.85     46    FIX 482         25  
             6.82
 2483                 2112.66      520.15     47    FIX 483         25  
             1.83
 2062                 2114.49      520.15     48    SUND BP         25  
             3.59
 2484                 2118.07      520.85     49    FIX 484         25  
             1.27
 2063                 2119.34      522.35     50    SUND BP         25  
             5.08
X/S 25     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 2485                 2124.42      524.05     51    FIX 485         25  
             4.93
 2488                 2129.35      525.94     52    .               25  
             3.31
 2489                 2132.66      527.47     53    .               25  
             3.07
 2490                 2135.73      529.23     54    .               25  
             2.04
 2491                 2137.77      530.19     55    .               25  
             3.97
 2492                 2141.74      530.72     56    .               25  
             1.98
 2493                 2143.73      530.79     57    .               25  
             2.46
 2494                 2146.18      531.13     58    .               25  
             1.97
 2495                 2148.16      531.53     59    .               25  
             0.12
 2496                 2148.27      531.91     60    .               25  
             4.82
 2497                 2153.10      531.84     61    WL RB 1050HRS   25  
             1.43
 2498                 2154.52      532.01     62    .               25  
             2.23
 2499                 2156.75      532.16     63    TOE CUT         25  
             0.30
 2500                 2157.05      532.38     64    .               25  
             0.04
 2502                 2157.09      534.29     65    TOP CUT         25  
             1.20
 2503                 2158.29      534.72     66    .               25  
             1.45
 2504                 2159.75      534.85     67    .               25  
             1.61
 2505                 2161.36      534.96     68    G/L MON 412 RB  25  
             2.97
 2506                 2164.33      535.15     69    .               25  
             3.40
 2507                 2167.74      535.30     70    .               25  
             4.27
 2508                 2172.01      535.26     71    G/L BOLT RB     25  
 
JOIN  10500-2508  S 76d13'38" E  172.01
