NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 3     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      532.51      0    DUMMY
          2000.00
  515                 2000.00      532.51      1    1997 0+00 X/S 3  
             5.70
  514                 2005.70      532.71      2    FIELD LEVEL      3  
             3.31
  513                 2009.00      532.97      3    .                3  
             2.13
  512                 2011.13      533.17      4    TOE DYKE         3  
             0.75
  511                 2011.88      533.34      5    .                3  
             0.51
  510                 2012.39      533.56      6    .                3  
             1.25
  509                 2013.64      533.80      7    .                3  
             0.16
  508                 2013.80      534.01      8    .                3  
             2.19
  507                 2015.99      534.71      9    .                3  
             6.22
  506                 2022.21      536.71     10    .                3  
             3.96
  505                 2026.18      538.04     11    .                3  
             1.60
  504                 2027.78      538.74     12    .                3  
             0.76
  503                 2028.54      539.14     13    TOP DYKE         3  
             1.32
  502                 2029.86      539.12     14    G/L MON 330 LB   3  
             1.52
  501                 2031.38      539.17     15    TOP DYKE         3  
             0.35
  500                 2031.73      539.00     16    .                3  
             1.77
  499                 2033.50      538.39     17    .                3  
             4.01
  498                 2037.51      537.02     18    .                3  
             4.06
  497                 2041.58      535.95     19    .                3  
             3.18
  496                 2044.76      535.44     20    .                3  
             4.00
  495                 2048.75      534.89     21    .                3  
             3.40
  494                 2052.15      534.68     22    .                3  
             3.09
  493                 2055.25      534.63     23    .                3  
             3.33
  492                 2058.57      534.91     24    .                3  
             2.23
  491                 2060.80      535.19     25    .                3  
X/S 3     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             2.59
  490                 2063.39      535.41     26    .                3  
             1.84
  489                 2065.23      535.62     27    .                3  
             1.12
  488                 2066.35      535.78     28    .                3  
             1.03
  487                 2067.38      535.82     29    .                3  
             0.50
  486                 2067.88      535.57     30    .                3  
             0.57
  485                 2068.45      535.18     31    .                3  
             0.12
  484                 2068.56      534.55     32    .                3  
             0.26
  483                 2068.83      533.78     33    .                3  
             0.89
  482                 2069.72      533.53     34    .                3  
             0.63
  481                 2070.34      533.01     35    .                3  
             0.19
  480                 2070.53      532.89     36    .                3  
             0.73
  479                 2071.26      532.09     37    WL LB 1437HRS    3  
             0.10
  478                 2071.36      531.98     38    .                3  
             0.71
  477                 2072.07      531.74     39    .                3  
             2.00
  476                 2074.07      531.21     40    .                3  
             1.68
  475                 2075.74      530.85     41    .                3  
             1.76
  474                 2077.50      530.36     42    .                3  
             2.38
  473                 2079.88      529.19     43    .                3  
             3.45
  471                 2083.33      527.61     44    FIX 471          3  
             4.86
  470                 2088.19      526.11     45    FIX 470          3  
             3.57
  979                 2091.76      525.21     46    SUND BP          3  
             1.88
  469                 2093.64      525.01     47    FIX 469          3  
             6.04
  468                 2099.68      524.51     48    FIX 468          3  
             7.81
  467                 2107.48      524.11     49    FIX 467          3  
             3.25
  978                 2110.74      523.91     50    SUND BP          3  
             3.18
X/S 3     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
  466                 2113.92      523.91     51    FIX 466          3  
             6.74
  465                 2120.66      523.86     52    FIX 465          3  
             9.25
  464                 2129.91      523.51     53    FIX 464          3  
             6.29
  463                 2136.20      523.21     54    FIX 463          3  
             2.68
  977                 2138.88      523.01     55    SUND BP          3  
             4.24
  462                 2143.12      522.01     56    FIX 462          3  
             1.78
  976                 2144.90      521.81     57    SUND BP          3  
             3.86
  975                 2148.77      523.11     58    SUND BP          3  
             1.49
  461                 2150.25      523.31     59    FIX 461          3  
             3.30
  974                 2153.56      523.56     60    SUND BP          3  
             2.98
  460                 2156.54      523.51     61    FIX 460          3  
             7.11
  459                 2163.65      523.41     62    FIX 459          3  
             5.84
  458                 2169.49      523.41     63    FIX 458          3  
             7.22
  457                 2176.71      523.56     64    FIX 457          3  
             5.52
  456                 2182.23      523.56     65    FIX 456          3  
             3.93
  973                 2186.16      523.41     66    SUND BP          3  
             2.91
  455                 2189.07      523.61     67    FIX 455          3  
             6.54
  454                 2195.61      523.56     68    FIX 454          3  
             7.72
  453                 2203.33      523.66     69    FIX 453          3  
             4.63
  972                 2207.96      524.56     70    SUND BP          3  
             2.09
  452                 2210.05      524.66     71    FIX 452          3  
             5.83
  971                 2215.88      524.81     72    SUND BP          3  
             1.40
  451                 2217.28      524.61     73    FIX 451          3  
             4.66
  970                 2221.94      524.61     74    SUND BP          3  
             1.83
  450                 2223.78      524.76     75    FIX 450          3  
             3.11
  969                 2226.89      524.71     76    SUND BP          3  
X/S 3     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.88
  968                 2227.77      525.11     77    SUND BP          3  
             1.49
  449                 2229.26      525.31     78    FIX 449          3  
             4.39
  448                 2233.65      526.31     79    FIX 448          3  
             4.69
  442                 2238.34      527.56     80    .                3  
             2.18
  441                 2240.53      528.43     81    .                3  
             1.92
  440                 2242.44      529.00     82    .                3  
             0.98
  439                 2243.43      529.51     83    .                3  
             1.25
  438                 2244.68      529.93     84    .                3  
             0.65
  437                 2245.33      530.34     85    .                3  
             0.68
  436                 2246.00      530.65     86    .                3  
             1.12
  435                 2247.12      530.98     87    D1.15            3  
             1.13
  434                 2248.25      531.36     88    .                3  
             1.24
  433                 2249.48      531.77     89    .                3  
             1.45
  432                 2250.93      532.14     90    WL RB 1420HRS    3  
             0.24
  431                 2251.18      532.26     91    .                3  
             0.57
  430                 2251.75      532.35     92    .                3  
             0.36
  429                 2252.11      532.70     93    .                3  
             0.23
  428                 2252.34      533.30     94    .                3  
             0.36
  427                 2252.70      533.68     95    .                3  
             1.10
  426                 2253.80      534.64     96    .                3  
             0.18
  424                 2253.98      534.64     97    .                3  
             0.28
  423                 2254.25      535.54     98    TOP CUT          3  
             0.60
  422                 2254.85      535.98     99    .                3  
             0.75
  421                 2255.60      536.20    100    .                3  
             1.25
  420                 2256.85      536.15    101    .                3  
             0.92
X/S 3     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
  419                 2257.78      536.54    102    .                3  
             0.71
  418                 2258.49      536.91    103    PATH             3  
             1.07
  417                 2259.56      537.23    104    PATH             3  
             0.68
  416                 2260.25      537.59    105    .                3  
             1.54
  415                 2261.78      537.70    106    G/L MON 329 RB   3  
             1.25
  414                 2263.04      537.68    107    .                3  
 
JOIN  515-414  N 26d55'15" E  263.04