NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 7     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      536.69      0    DUMMY
          2000.00
16373                 2000.00      536.69      1    1973 0+00 X/S 7  
             3.67
  794                 2003.67      536.74      2    FIELD LEVEL      7  
             4.80
  795                 2008.47      536.76      3    .                7  
             4.30
  796                 2012.77      536.89      4    .                7  
             2.45
  797                 2015.22      537.02      5    TOE DYKE         7  
             2.33
  798                 2017.56      537.47      6    .                7  
             2.38
  799                 2019.93      538.30      7    .                7  
             1.25
  800                 2021.18      538.68      8    .                7  
             1.16
  801                 2022.35      539.01      9    TOP DYKE         7  
             0.34
  802                 2022.69      539.14     10    .                7  
             1.74
  803                 2024.43      539.10     11    G/L MON 348 LB   7  
             1.42
  804                 2025.85      539.11     12    TOP DYKE         7  
             0.83
  805                 2026.68      538.85     13    .                7  
             0.92
  806                 2027.59      538.45     14    .                7  
             1.08
  807                 2028.67      538.12     15    .                7  
             1.78
  808                 2030.45      537.70     16    .                7  
             1.61
  809                 2032.05      537.32     17    .                7  
             1.27
  810                 2033.32      537.00     18    TOE DYKE         7  
             2.52
  811                 2035.84      536.70     19    .                7  
             2.50
  812                 2038.34      536.33     20    .                7  
             2.94
  813                 2041.28      536.06     21    .                7  
             4.51
  814                 2045.79      535.82     22    .                7  
             2.65
  815                 2048.44      535.61     23    .                7  
             3.12
  816                 2051.56      535.61     24    .                7  
             2.84
  817                 2054.40      535.36     25    .                7  
X/S 7     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.08
  818                 2055.48      535.00     26    .                7  
             0.39
  819                 2055.87      534.74     27    .                7  
             1.78
  820                 2057.65      534.49     28    .                7  
             1.47
  821                 2059.12      534.45     29    .                7  
             2.27
  822                 2061.39      534.43     30    .                7  
             1.09
  823                 2062.48      534.50     31    .                7  
             1.38
  824                 2063.86      534.85     32    .                7  
             2.11
  825                 2065.97      535.32     33    .                7  
             1.18
  826                 2067.15      535.37     34    .                7  
             1.30
  827                 2068.45      535.22     35    .                7  
             2.12
  828                 2070.57      535.23     36    .                7  
             2.60
  829                 2073.17      535.56     37    .                7  
             1.54
  830                 2074.72      535.91     38    .                7  
             2.49
  831                 2077.21      535.81     39    .                7  
             2.15
  832                 2079.35      535.78     40    .                7  
             2.67
  833                 2082.03      535.85     41    .                7  
             1.91
  834                 2083.94      536.09     42    .                7  
             0.64
  835                 2084.58      536.07     43    .                7  
             0.94
  836                 2085.51      535.79     44    .                7  
             1.05
  837                 2086.56      535.61     45    .                7  
             1.74
  838                 2088.30      535.48     46    .                7  
             1.88
  839                 2090.18      535.70     47    .                7  
             2.70
  840                 2092.88      535.44     48    .                7  
             2.23
  841                 2095.11      535.45     49    .                7  
             1.32
  842                 2096.43      535.54     50    .                7  
             0.90
X/S 7     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
  843                 2097.34      535.97     51    .                7  
             1.42
  844                 2098.76      536.48     52    .                7  
             2.87
  845                 2101.63      536.43     53    .                7  
             2.26
  846                 2103.89      536.25     54    .                7  
             1.98
  847                 2105.87      536.30     55    .                7  
             1.52
  848                 2107.39      536.46     56    .                7  
             2.82
  849                 2110.21      536.48     57    .                7  
             3.37
  850                 2113.58      536.71     58    .                7  
             4.66
  851                 2118.25      536.87     59    .                7  
             2.66
  852                 2120.90      536.77     60    .                7  
             2.03
  853                 2122.93      536.57     61    .                7  
             2.49
  854                 2125.42      536.58     62    .                7  
             1.70
  855                 2127.12      536.45     63    .                7  
             2.56
  856                 2129.68      536.41     64    .                7  
             2.44
  857                 2132.12      536.30     65    .                7  
             2.53
  858                 2134.65      536.30     66    .                7  
             0.71
  859                 2135.36      536.08     67    TOP BANK         7  
             0.34
  860                 2135.70      535.66     68    .                7  
             1.14
  861                 2136.83      535.03     69    .                7  
             1.04
  862                 2137.87      534.20     70    .                7  
             0.39
  863                 2138.26      533.93     71    .                7  
             0.43
  864                 2138.69      532.70     72    .                7  
             1.05
  865                 2139.74      532.21     73    .                7  
             0.32
  866                 2140.06      532.08     74    WL LB 1008HRS    7  
             0.27
  867                 2140.33      531.78     75    .                7  
             1.11
  868                 2141.45      531.61     76    .                7  
X/S 7     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.41
  869                 2142.85      531.10     77    .                7  
             1.67
  870                 2144.53      530.52     78    .                7  
             1.02
  871                 2145.55      529.84     79    .                7  
             0.80
  872                 2146.34      529.27     80    .                7  
             2.39
  873                 2148.73      528.25     81    .                7  
             1.22
  876                 2149.95      527.35     82    FIX 876          7  
             3.68
  877                 2153.63      525.15     83    FIX 877          7  
             3.94
  878                 2157.57      523.85     84    FIX 878          7  
             1.87
   84                 2159.44      523.35     85    SUND BP          7  
             3.67
  879                 2163.11      523.25     86    FIX 879          7  
             5.01
  880                 2168.12      523.15     87    FIX 880          7  
             7.55
  881                 2175.68      522.85     88    FIX 881          7  
             1.94
   85                 2177.61      522.85     89    SUND BP          7  
             2.32
   86                 2179.94      522.55     90    SUND BP          7  
             1.68
  882                 2181.62      522.65     91    FIX 882          7  
             5.43
  883                 2187.05      522.65     92    FIX 883          7  
             8.60
  884                 2195.64      522.35     93    FIX 884          7  
             3.98
   87                 2199.63      521.55     94    SUND BP          7  
             2.70
  885                 2202.33      520.75     95    FIX 885          7  
             0.70
   88                 2203.03      520.55     96    SUND BP          7  
             2.31
   89                 2205.34      520.55     97    SUND BP          7  
             2.94
  886                 2208.29      520.15     98    FIX 886          7  
             3.31
   90                 2211.60      519.45     99    SUND BP          7  
             3.65
  887                 2215.25      518.05    100    FIX 887          7  
             2.77
   91                 2218.02      517.45    101    SUND BP          7  
             3.51
X/S 7     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
  888                 2221.53      517.30    102    FIX 888          7  
             6.32
  889                 2227.85      517.45    103    FIX 889          7  
             6.91
  890                 2234.76      517.85    104    FIX 890          7  
             7.44
  891                 2242.21      518.45    105    FIX 891          7  
             0.97
   92                 2243.17      519.25    106    SUND BP          7  
             3.14
   93                 2246.32      519.55    107    SUND BP          7  
             2.98
  892                 2249.30      519.25    108    FIX 892          7  
             7.34
  893                 2256.64      517.25    109    FIX 893          7  
             5.16
   94                 2261.80      515.75    110    SUND BP          7  
             2.84
  894                 2264.64      515.35    111    FIX 894          7  
             1.81
   95                 2266.45      515.35    112    SUND BP          7  
             4.56
  895                 2271.01      518.85    113    FIX 895          7  
             7.15
  896                 2278.15      520.75    114    FIX 896          7  
             6.08
  897                 2284.24      524.55    115    FIX 897          7  
             3.23
  899                 2287.47      525.43    116    D6.64            7  
             1.73
  900                 2289.20      526.85    117    .                7  
             2.14
  901                 2291.34      528.87    118    .                7  
             1.06
  902                 2292.40      529.56    119    .                7  
             1.30
  903                 2293.70      530.10    120    .                7  
             1.09
  904                 2294.79      530.88    121    .                7  
             1.08
  905                 2295.86      531.51    122    .                7  
             1.45
  906                 2297.31      531.75    123    .                7  
             0.71
  907                 2298.02      532.03    124    WL RB 1026HRS    7  
             0.47
  908                 2298.50      532.09    125    .                7  
             0.18
  909                 2298.67      532.23    126    .                7  
             0.86
  910                 2299.53      532.96    127    .                7  
X/S 7     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             1.08
  911                 2300.61      533.61    128    .                7  
             0.22
  913                 2300.83      533.43    129    .                7  
             0.24
  914                 2301.06      533.46    130    .                7  
             0.73
  915                 2301.80      533.69    131    .                7  
             0.45
  916                 2302.25      533.92    132    .                7  
             1.00
  917                 2303.24      534.84    133    .                7  
             0.47
  918                 2303.71      535.21    134    .                7  
             0.54
  919                 2304.25      535.31    135    .                7  
             0.27
  920                 2304.53      535.85    136    .                7  
             0.63
  921                 2305.15      535.97    137    .                7  
             1.51
  922                 2306.66      535.96    138    .                7  
             0.43
  923                 2307.09      536.35    139    .                7  
             0.34
  924                 2307.43      537.27    140    TOP BANK         7  
             0.85
  925                 2308.28      537.37    141    .                7  
             3.62
  926                 2311.91      537.46    142    .                7  
             2.60
  927                 2314.50      537.49    143    G/L MON 347 RB   7  
             6.30
  928                 2320.80      537.41    144    FIELD LEVEL      7  
             7.42
  929                 2328.22      537.37    145    FIELD LEVEL      7  
 
JOIN  16373-929  S 27d53'54" E  328.22
