NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 8     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      534.48      0    DUMMY
          2000.00
 7586                 2000.00      534.48      1    1986 0+00 X/S 8
             0.50
 1185                 2000.50      534.52      2    FIELD LEVEL      8  
             6.37
 1184                 2006.88      534.86      3    .                8  
             1.02
 1183                 2007.89      534.93      4    TOE DYKE         8  
             1.64
 1182                 2009.54      535.39      5    .                8  
             2.68
 1181                 2012.22      536.35      6    .                8  
             3.02
 1180                 2015.24      537.45      7    .                8  
             1.09
 1179                 2016.33      537.98      8    .                8  
             0.64
 1178                 2016.97      538.50      9    .                8  
             0.97
 1177                 2017.94      538.63     10    G/L MON 350 LB   8  
             0.47
 1176                 2018.41      538.75     11    TOP DYKE         8  
             0.89
 1175                 2019.30      538.75     12    .                8  
             1.41
 1174                 2020.71      538.92     13    C/L              8  
             1.88
 1173                 2022.59      539.06     14    TOP DYKE         8  
             1.33
 1172                 2023.92      538.68     15    .                8  
             2.16
 1171                 2026.08      537.97     16    .                8  
             1.68
 1170                 2027.76      537.39     17    .                8  
             1.24
 1169                 2029.00      536.58     18    .                8  
             1.45
 1168                 2030.45      536.42     19    C/L ACCESS       8  
             2.50
 1167                 2032.95      536.27     20    .                8  
             3.45
 1166                 2036.40      535.96     21    .                8  
             2.92
 1165                 2039.32      535.65     22    .                8  
             0.75
 1164                 2040.07      535.17     23    .                8  
             1.71
 1163                 2041.78      534.19     24    .                8  
             0.73
 1162                 2042.51      533.32     25    .                8  
X/S 8     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.45
 1161                 2042.96      532.89     26    .                8  
             0.78
 1160                 2043.74      532.79     27    .                8  
             0.40
 1159                 2044.13      532.39     28    .                8  
             1.00
 1158                 2045.13      532.07     29    WL LB 1123HRS    8  
             0.28
 1157                 2045.42      531.81     30    .                8  
             1.34
 1156                 2046.76      531.55     31    .                8  
             1.97
 1155                 2048.73      530.97     32    .                8  
             1.55
 1154                 2050.29      530.45     33    .                8  
             2.17
 1153                 2052.45      529.51     34    .                8  
             1.66
 1152                 2054.12      528.34     35    .                8  
             3.28
 1151                 2057.39      527.08     36    .                8  
             1.78
 1148                 2059.17      526.07     37    FIX 148          8  
             7.52
 1147                 2066.69      521.97     38    FIX 147          8  
             7.13
 1146                 2073.81      518.17     39    FIX 146          8  
             8.19
 1145                 2082.00      514.87     40    FIX 145          8  
             1.92
 1047                 2083.92      514.67     41    SUND BP          8  
             2.64
 1046                 2086.57      514.67     42    SUND BP          8  
             2.48
 1144                 2089.05      515.07     43    FIX 144          8  
             7.43
 1143                 2096.48      516.67     44    FIX 143          8  
             1.92
 1045                 2098.39      516.97     45    SUND BP          8  
             5.75
 1142                 2104.15      517.47     46    FIX 142          8  
             6.82
 1141                 2110.97      517.97     47    FIX 141          8  
             6.02
 1140                 2116.98      518.47     48    FIX 140          8  
             7.44
 1139                 2124.43      518.77     49    FIX 139          8  
             6.77
 1138                 2131.20      519.17     50    FIX 138          8  
             7.63
X/S 8     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
 1137                 2138.83      519.67     51    FIX 137          8  
             6.06
 1136                 2144.89      519.77     52    FIX 136          8  
             3.27
 1044                 2148.16      519.67     53    SUND BP          8  
             1.89
 1043                 2150.04      518.87     54    SUND BP          8  
             2.03
 1135                 2152.08      518.97     55    FIX 135          8  
             4.55
 1042                 2156.62      519.17     56    SUND BP          8  
             2.51
 1134                 2159.13      519.07     57    FIX 134          8  
             3.06
 1041                 2162.19      519.47     58    SUND BP          8  
             2.33
 1133                 2164.52      519.67     59    FIX 133          8  
             4.05
 1040                 2168.57      519.87     60    SUND BP          8  
             2.13
 1132                 2170.70      520.17     61    FIX 132          8  
             5.96
 1131                 2176.66      521.27     62    FIX 131          8  
             5.69
 1130                 2182.35      522.67     63    FIX 130          8  
             5.60
 1129                 2187.95      524.17     64    FIX 129          8  
             5.34
 1128                 2193.29      525.07     65    FIX 128          8  
             5.20
 1125                 2198.49      527.08     66    .                8  
             2.75
 1124                 2201.24      528.02     67    .                8  
             2.02
 1123                 2203.26      528.96     68    .                8  
             1.62
 1122                 2204.88      529.88     69    .                8  
             0.99
 1121                 2205.87      530.25     70    .                8  
             1.23
 1120                 2207.10      530.74     71    D1.34            8  
             0.78
 1119                 2207.88      531.05     72    .                8  
             1.37
 1118                 2209.25      531.61     73    .                8  
             1.22
 1117                 2210.47      531.88     74    .                8  
             0.52
 1116                 2210.99      532.08     75    WL RB 1104HRS    8  
             0.58
 1115                 2211.57      532.22     76    .                8  
X/S 8     KOOTENAY RIVER     PROJECT 9717S008     SEPT 1997
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
             0.49
 1114                 2212.07      532.35     77    .                8  
             0.89
 1113                 2212.96      532.78     78    TOE BANK         8  
             0.38
 1112                 2213.34      533.65     79    .                8  
             0.29
 1111                 2213.63      534.02     80    .                8  
             0.51
 1110                 2214.14      534.42     81    .                8  
             0.23
 1109                 2214.37      535.07     82    .                8  
             0.35
 1108                 2214.72      535.50     83    .                8  
             0.68
 1107                 2215.40      536.00     84    .                8  
             0.99
 1106                 2216.39      536.21     85    .                8  
             0.74
 1105                 2217.13      536.54     86    .                8  
             0.71
 1104                 2217.85      537.15     87    TOP BANK         8  
             0.79
 1103                 2218.64      537.51     88    .                8  
             2.62
 1102                 2221.25      537.70     89    G/L MON 349 RB   8  
             1.26
 1101                 2222.52      537.72     90    .                8  
             2.90
 1100                 2225.42      537.66     91    .                8  
 
JOIN  7586-1100  N 26d37'58" E  225.42
