THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. MISSION CREEK X/S 1 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 100 200 0.00 499.62 1 DUMMY 2000.00 101 201 2000.00 499.62 2 ST XS-1 LB ON SL 8.50 102 202 2008.50 498.77 3 TOP 2.87 103 203 2011.37 496.74 4 HIGH WATER MARK 2.90 104 204 2014.27 495.84 5 W/L LB 1.52 105 205 2015.79 495.50 6 1.15 1.98 106 206 2017.77 495.32 7 1.75 3.35 107 207 2021.12 495.46 8 1.3 5.18 108 208 2026.31 495.46 9 1.3 3.97 109 209 2030.27 495.55 10 0.9 1.68 110 210 2031.95 495.84 11 W/L RB 1.94 111 211 2033.89 496.13 12 . 3.38 112 212 2037.28 496.92 13 TOE 2.75 113 213 2040.03 499.02 14 ON SLOPE END XS1 MISSION CREEK X/S 2 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 114 214 0.00 496.57 1 DUMMY 2000.00 115 215 2000.00 496.57 2 END X-S 2 6.97 116 216 2006.97 496.48 3 . 2.64 117 217 2009.60 494.65 4 . 1.68 118 218 2011.28 494.16 5 W/L LB 3.50 119 219 2014.78 493.81 6 1.2 EDGE ROCK 0.91 120 220 2015.69 494.87 7 . 0.61 121 221 2016.30 493.75 8 1.4 EDGE ROCK 2.44 122 222 2018.74 493.81 9 1.3 2.74 123 223 2021.48 493.69 10 1.65 3.81 124 224 2025.29 493.84 11 1.0 2.59 125 225 2027.88 494.18 12 W/L RB 0.34 126 226 2028.22 494.21 13 . 3.43 127 227 2031.65 494.52 14 . 7.14 128 228 2038.79 495.58 15 . 10.13 129 229 2048.92 495.70 16 . 1.55 130 230 2050.47 496.58 17 . 2.68 131 231 2053.16 496.69 18 . 3.45 132 232 2056.60 496.23 19 . 3.75 133 233 2060.35 496.40 20 . 2.06 134 234 2062.41 497.14 21 TOE 0.93 135 235 2063.34 498.35 22 TOP 2.10 136 236 2065.44 498.93 23 ST XS 2 MISSION CREEK X/S 3 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 137 237 0.00 496.06 1 DUMMY 2000.00 138 238 2000.00 496.06 2 ST XS-3 LB SLOPE 1.30 139 239 2001.30 494.87 3 . 5.34 140 240 2006.64 494.42 4 . 4.17 141 241 2010.80 494.05 5 HIGH WATER MARK 3.86 142 242 2014.66 493.18 6 W/L LB 2.41 143 243 2017.07 492.98 7 0.7 4.62 144 244 2021.69 492.90 8 0.8 3.80 145 245 2025.49 492.80 9 1.2 5.99 146 246 2031.49 492.89 10 0.9 EDGE OF ROAD 4.86 147 247 2036.35 493.05 11 .6 C/L OF ROAD 2.67 148 248 2039.02 493.27 12 W/L RB 5.50 149 249 2044.52 493.70 13 HIGH WATER MARK 12.31 150 250 2056.84 496.23 14 . 11.33 151 251 2068.16 497.12 15 END XS-3 MISSION CREEK X/S 4 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 175 275 0.00 496.45 1 DUMMY 2000.00 174 274 2000.00 496.45 2 ON SLOPE END XS4 5.79 173 273 2005.79 495.17 3 TOE 2.44 172 272 2008.23 495.58 4 . 15.82 171 271 2024.04 495.62 5 GL REBAR LB 0.79 170 270 2024.84 495.62 6 . 1.52 169 269 2026.36 495.08 7 TOP ABUTMENT LB 0.10 168 268 2026.46 493.41 8 TOE ABUTMENT 2.79 167 267 2029.25 492.86 9 W/L 2.53 166 266 2031.79 492.48 10 1.2 3.08 165 265 2034.87 492.22 11 2.1 2.10 164 264 2036.97 492.40 12 1.5 TOE PIER 0.26 163 263 2037.23 494.67 13 . 2.12 162 262 2039.35 494.17 14 . 0.33 161 261 2039.68 492.42 15 1.6 TOE PIER 1.83 160 260 2041.51 492.33 16 1.9 3.31 159 259 2044.82 492.55 17 1.3 5.06 158 258 2049.88 492.51 18 1.4 TOE ABUTMENT 0.03 157 257 2049.91 494.88 19 TOP ABUTMENT RB 1.86 156 256 2051.78 495.60 20 . 15.53 155 255 2067.31 496.41 21 ROAD 5.79 154 254 2073.09 496.87 22 TOE 4.57 153 253 2077.67 497.84 23 ST XS-4 C/L BR. MISSION CREEK X/S 5 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 192 292 0.00 495.97 1 DUMMY 2000.00 191 291 2000.00 495.97 2 END XS-5 LB 4.77 190 290 2004.77 494.31 3 . 5.60 189 289 2010.37 493.92 4 . 9.15 188 288 2019.51 493.53 5 . 4.00 187 287 2023.51 492.96 6 TOP 1.13 186 286 2024.65 492.38 7 W/L LB 1.06 185 285 2025.71 492.04 8 1.1 3.46 184 284 2029.16 491.78 9 2.0 1.44 183 283 2030.61 491.77 10 1.95 1.56 182 282 2032.16 491.94 11 1.35 1.91 181 281 2034.07 492.17 12 0.65 4.16 180 280 2038.23 492.35 13 W/L RB 2.54 179 279 2040.76 492.42 14 . 4.34 178 278 2045.11 492.59 15 HIGH WATER MARK 4.50 177 277 2049.60 493.15 16 TOE RB 0.50 176 276 2050.10 493.81 17 ST XS 5 ON SLOPE MISSION CREEK X/S 6 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 192 292 0.00 495.50 1 DUMMY 2000.00 193 293 2000.00 495.50 2 START XS-6 LB 8.25 194 294 2008.25 495.46 3 ROAD 21.62 195 295 2029.88 495.70 4 . 12.46 196 296 2042.33 495.79 5 GL REBAR LB 4.60 197 297 2046.93 495.60 6 . 1.82 198 298 2048.75 494.55 7 TOP ABUTMENT 0.00 199 299 2048.76 492.28 8 TOE ABUTMENT 0.29 200 300 2049.05 492.28 9 W/L LB 3.81 201 301 2052.86 491.98 10 0.85 2.37 202 302 2055.23 491.88 11 1.25 3.84 203 303 2059.07 491.79 12 1.55 TOE PIER 0.14 204 304 2059.21 494.56 13 TOP PIER 24 1.50 205 305 2060.71 494.83 14 TOP PIER 0.74 206 306 2061.45 491.64 15 1.65 TOE PIER 3.16 207 307 2064.61 491.43 16 2.4 2.72 208 308 2067.33 491.62 17 1.8 2.27 209 309 2069.59 491.57 18 1.9 1.51 210 310 2071.10 492.18 19 W/L RB 3.65 211 311 2074.75 493.05 20 HIGH WATER MARK 1.12 212 312 2075.88 495.68 21 TOP 11.89 213 313 2087.77 496.40 22 TOE END XS-6 MISSION CREEK X/S 7 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 235 335 0.00 495.84 1 DUMMY 2000.00 234 334 2000.00 495.84 2 END XS-7 14.68 233 333 2014.68 496.15 3 . 4.94 232 332 2019.61 494.35 4 . 2.23 231 331 2021.85 494.19 5 . 2.86 230 330 2024.71 492.65 6 TOE 5.31 229 329 2030.03 492.30 7 HIGH WATER MARK 1.97 228 328 2031.99 492.19 8 W/L LB 3.38 227 327 2035.37 491.98 9 0.7 7.27 226 326 2042.65 492.12 10 0.3 3.74 225 325 2046.39 491.98 11 W/L 1.49 224 324 2047.88 491.56 12 1.3 2.79 223 323 2050.67 491.49 13 1.6 1.93 222 322 2052.60 491.67 14 1.0 3.28 221 321 2055.89 491.65 15 0.8 0.47 220 320 2056.36 491.88 16 W/L RB 1.44 219 319 2057.79 491.97 17 TOE 2.77 218 318 2060.56 492.80 18 HIGH WATER MARK 1.50 217 317 2062.06 493.60 19 . 9.04 216 316 2071.10 494.21 20 . 6.93 215 315 2078.02 495.40 21 ST XS-7 RB MISSION CREEK X/S 8 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 235 335 0.00 493.21 1 DUMMY 2000.00 236 336 2000.00 493.21 2 START XS-8 LB 6.15 237 337 2006.15 494.22 3 TOP 4.15 238 338 2010.30 491.60 4 TOE GULLEY 3.05 239 339 2013.34 492.97 5 TOP RIDGE 3.05 240 340 2016.39 491.65 6 HIGH WATER MARK 1.52 241 341 2017.92 490.97 7 W/L 0.00 242 342 2017.92 490.83 8 0.45 2.44 243 343 2020.35 490.62 9 1.1 3.96 244 344 2024.32 490.65 10 1.0 3.05 245 345 2027.37 490.53 11 1.3 2.74 246 346 2030.11 490.61 12 1.0 4.88 247 347 2034.99 490.65 13 1.0 3.96 248 348 2038.95 490.71 14 0.7 4.11 249 349 2043.06 490.93 15 W/L RB 2.86 250 350 2045.92 491.81 16 . 2.01 251 351 2047.93 491.89 17 FENCE 6.85 252 352 2054.78 492.39 18 TOE 2.53 253 353 2057.31 494.12 19 ON SLOPE END XS8 MISSION CREEK X/S 9 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 275 375 0.00 491.45 1 DUMMY 2000.00 274 374 2000.00 491.45 2 END XS-9 LB 8.82 273 373 2008.82 491.30 3 . 3.94 272 372 2012.76 490.39 4 . 1.22 271 371 2013.97 490.33 5 . 0.92 270 370 2014.89 489.74 6 . 3.65 269 369 2018.54 490.48 7 . 3.92 268 368 2022.46 491.19 8 TOP 2.69 267 367 2025.15 489.95 9 HIGH WATER MARK 1.52 266 366 2026.68 489.49 10 . 2.79 265 365 2029.47 489.37 11 . 3.34 264 364 2032.81 488.77 12 W/L LB 2.28 263 363 2035.09 488.29 13 1.6 2.57 262 362 2037.66 488.24 14 1.8 1.52 261 361 2039.19 488.27 15 1.7 2.74 260 360 2041.92 488.37 16 0.3 1.82 259 359 2043.74 488.76 17 W/L 1.80 258 358 2045.54 489.18 18 . 0.76 257 357 2046.30 489.21 19 . 0.03 256 356 2046.33 490.06 20 HWM 2.35 255 355 2048.68 491.69 21 START XS-9 RB MISSION CREEK X/S 10 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 293 393 0.00 489.75 1 DUMMY 2000.00 292 392 2000.00 489.75 2 ST XS 10 14.04 291 391 2014.04 489.44 3 TN 0.73 290 390 2014.77 489.44 4 TOP 1.05 289 389 2015.83 488.61 5 HIGH WATER MARK 1.51 288 388 2017.34 487.57 6 W/L LB 0.30 287 387 2017.64 487.37 7 0.6 TOE 3.63 286 386 2021.27 487.21 8 1.1 4.24 285 385 2025.51 487.19 9 1.3 5.75 284 384 2031.26 487.29 10 1.0 4.67 283 383 2035.93 487.38 11 0.6 TOE 0.49 282 382 2036.41 487.53 12 W/L RB 0.18 281 381 2036.59 487.68 13 . 4.20 280 380 2040.79 488.31 14 TRASH LINE 3.35 279 379 2044.14 488.50 15 TOE 2.79 278 378 2046.92 489.43 16 TOP 0.31 277 377 2047.23 489.53 17 FENCE LINE 7.01 276 376 2054.24 489.74 18 END XS-10 RB MISSION CREEK X/S 11 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 314 414 0.00 488.56 1 DUMMY 2000.00 313 413 2000.00 488.56 2 END XS 11 LB 6.39 312 412 2006.39 488.60 3 TOP 4.53 311 411 2010.92 487.43 4 . 13.08 310 410 2024.00 487.78 5 . 11.26 309 409 2035.26 487.67 6 TOP 2.70 308 408 2037.96 486.86 7 HIGH WATER MARK 1.83 307 407 2039.79 486.43 8 . 7.01 306 406 2046.80 486.70 9 TOE 8.56 305 405 2055.37 486.46 10 TN 6.37 304 404 2061.73 486.01 11 W/L LB 2.13 303 403 2063.87 485.87 12 0.4 2.44 302 402 2066.31 485.76 13 0.9 3.66 301 401 2069.96 485.67 14 1.25 3.05 300 400 2073.01 485.59 15 1.35 3.05 299 399 2076.06 485.62 16 1.4 3.35 298 398 2079.41 485.86 17 0.75 1.22 297 397 2080.63 486.07 18 W/L RB 3.26 296 396 2083.88 487.22 19 TOE OF CUT 0.17 295 395 2084.06 488.29 20 TOP OF BANK 9.78 294 394 2093.84 488.31 21 ST.XS-11 RB MISSION CREEK X/S 12 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 332 432 0.00 486.18 1 DUMMY 2000.00 331 431 2000.00 486.18 2 END XS 12 LB 9.43 330 430 2009.43 486.21 3 TOP OF BANK 1.80 329 429 2011.23 485.07 4 HIGH WATER MARK 1.22 328 428 2012.45 484.39 5 W/L LB 2.09 327 427 2014.54 484.00 6 0.8 4.87 326 426 2019.41 484.07 7 1.0 2.44 325 425 2021.85 484.08 8 1.0 3.04 324 424 2024.89 484.24 9 0.7 5.78 323 423 2030.67 484.23 10 0.9 4.87 322 422 2035.53 484.45 11 0.3 6.05 321 421 2041.59 484.44 12 GL REBAR 2.62 320 420 2044.21 484.42 13 W/L 1.98 319 419 2046.19 483.71 14 2.35 0.91 318 418 2047.10 484.41 15 W/L RB 0.46 317 417 2047.56 485.02 16 . 0.93 316 416 2048.49 485.37 17 . 0.29 315 415 2048.78 486.37 18 ST XS 12 RB MISSION CREEK X/S 13 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 350 433 0.00 486.00 1 DUMMY 2000.00 349 434 2000.00 486.00 2 ST XS-13 LB 10.30 348 435 2010.30 485.64 3 . 2.43 347 436 2012.73 484.87 4 . 11.53 346 437 2024.26 484.72 5 TOP 0.61 345 438 2024.86 484.21 6 HIGH WATER MARK 1.21 344 439 2026.07 483.91 7 . 5.80 343 440 2031.87 483.61 8 GL REBAR LB 0.27 342 441 2032.15 483.49 9 W/L LB 3.66 341 442 2035.80 483.32 10 0.65 W 5.79 340 443 2041.59 483.33 11 0.8 W 4.42 339 444 2046.01 483.28 12 0.85 W 5.18 338 445 2051.20 483.26 13 0.9 W 3.50 337 446 2054.70 483.18 14 1.1 TOE 0.46 336 447 2055.16 483.50 15 W/L RB 1.07 335 448 2056.22 484.84 16 . 0.75 334 449 2056.97 485.05 17 TOP 10.71 333 450 2067.68 485.36 18 . MISSION CREEK X/S 14 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 382 482 0.00 485.26 1 DUMMY 2000.00 381 481 2000.00 485.26 2 ST XS-14 LB 2.74 380 480 2002.74 484.28 3 TOE 2.44 379 479 2005.18 483.96 4 . 3.66 378 478 2008.84 483.93 5 . 1.21 377 477 2010.06 483.24 6 . 6.09 376 476 2016.15 483.04 7 . 5.77 375 475 2021.92 483.57 8 . 3.01 374 474 2024.93 483.53 9 GL REBAR LB 1.86 373 473 2026.79 483.39 10 . 1.37 372 472 2028.15 483.01 11 HIGH WATER MARK 2.89 371 471 2031.04 482.84 12 TRASH LINE 4.25 370 470 2035.29 482.59 13 . 2.89 369 469 2038.19 481.89 14 W/L LB 0.77 368 468 2038.95 481.61 15 0.9 TOE 1.07 367 467 2040.02 481.61 16 0.9 BESIDE REF 3.51 366 466 2043.53 481.55 17 1.05 3.04 365 465 2046.57 481.45 18 1.4 2.74 364 464 2049.31 481.40 19 1.45 1.52 363 463 2050.84 481.66 20 0.65 1.52 362 462 2052.36 481.58 21 0.95 1.53 361 461 2053.88 481.57 22 0.9 0.30 360 460 2054.18 481.80 23 0.2 0.60 359 459 2054.79 481.72 24 0.45 0.60 358 458 2055.38 481.86 25 W/L RB 0.60 357 457 2055.98 482.04 26 . 0.80 356 456 2056.78 482.48 27 . 0.16 355 455 2056.94 483.48 28 TOP OF BANK MISSION CREEK X/S 14 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.99 354 454 2060.93 483.66 29 G/L BOLT RB 14.31 353 453 2075.23 483.55 30 TOE 3.05 352 452 2078.28 484.47 31 . 12.19 351 451 2090.47 484.41 32 END XS-14 RB MISSION CREEK X/S 15 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 382 482 0.00 484.13 1 DUMMY 2000.00 383 483 2000.00 484.13 2 START XS-15 LB 2.89 384 484 2002.89 483.09 3 . 5.79 385 485 2008.69 482.72 4 . 0.73 386 486 2009.42 482.72 5 TOP OF BANK 1.07 387 487 2010.48 482.08 6 HIGH WATER MARK 1.98 388 488 2012.47 481.50 7 . 2.44 389 489 2014.90 481.17 8 W/L LB 1.66 390 490 2016.56 480.80 9 1.25 3.20 391 491 2019.77 480.75 10 1.4 2.89 392 492 2022.66 480.98 11 0.65 3.95 393 493 2026.61 481.07 12 0.35 5.17 394 494 2031.78 481.09 13 0.25 2.14 395 495 2033.92 481.17 14 W/L 3.96 396 496 2037.88 481.61 15 . 4.28 397 497 2042.16 481.80 16 . 6.12 398 498 2048.28 482.15 17 . 3.96 399 499 2052.24 482.71 18 . 6.40 400 500 2058.64 483.01 19 . 16.76 401 501 2075.40 482.73 20 . 13.41 402 502 2088.81 482.10 21 . 4.86 403 503 2093.68 483.80 22 TOP 6.40 404 504 2100.08 483.80 23 END XS 15 RB MISSION CREEK X/S 16 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 405 505 0.00 480.57 1 DUMMY 2000.00 406 506 2000.00 480.57 2 END XS 16 LB 5.05 407 507 2005.05 481.18 3 . 5.94 408 508 2010.99 480.97 4 TOP OF BANK 0.23 409 509 2011.23 480.63 5 HIGH WATER MARK 1.82 410 510 2013.05 479.81 6 W/L LB 1.82 411 511 2014.87 479.47 7 1.15 2.74 412 512 2017.61 479.42 8 1.35 2.74 413 513 2020.35 479.59 9 0.7 2.28 414 514 2022.63 479.81 10 W/L 2.89 415 515 2025.52 480.07 11 . 1.19 416 516 2026.71 480.09 12 TN 1.40 417 517 2028.11 479.83 13 . 1.52 418 518 2029.64 479.68 14 W/L 1.98 419 519 2031.62 479.39 15 0.95 3.35 420 520 2034.97 479.26 16 1.35 2.44 421 521 2037.41 479.22 17 1.5 1.37 422 522 2038.78 479.37 18 1.05 TOE 0.30 423 523 2039.09 479.68 19 W/L 1.22 424 524 2040.31 480.59 20 TOE OF CUT BANK 0.30 425 525 2040.61 482.73 21 TOP OF CUT BANK 8.99 426 526 2049.60 482.83 22 ST XS 16 RB MISSION CREEK X/S 17 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 427 527 0.00 480.02 1 DUMMY 2000.00 428 528 2000.00 480.02 2 END XS-17 LB 4.57 429 529 2004.57 479.80 3 C/L ROAD 5.48 430 530 2010.06 479.99 4 TOP 0.61 431 531 2010.67 479.22 5 HIGH WATER MARK 0.91 432 532 2011.58 478.92 6 . 6.70 433 533 2018.29 478.69 7 . 4.27 434 534 2022.55 478.43 8 W/L LB 1.52 435 535 2024.08 478.15 9 1.0 3.05 436 536 2027.12 477.95 10 1.6 3.20 437 537 2030.32 478.06 11 1.3 3.20 438 538 2033.52 478.06 12 1.3 2.59 439 539 2036.11 478.23 13 0.7 TOE 0.46 440 540 2036.57 478.43 14 W/L 0.30 441 541 2036.88 478.93 15 TOP 1.55 442 542 2038.43 479.24 16 HIGH WATER MARK 7.39 443 543 2045.82 479.75 17 . 8.62 444 544 2054.44 479.57 18 TOE 3.30 445 545 2057.74 479.12 19 . 4.77 446 546 2062.51 480.18 20 . 3.31 447 547 2065.82 481.15 21 . 10.32 448 548 2076.15 482.49 22 ST XS 17 RB MISSION CREEK X/S 18 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 465 565 0.00 480.59 1 DUMMY 2000.00 464 564 2000.00 480.59 2 C/L ROAD END 18 9.39 463 563 2009.39 480.79 3 TOP 2.07 462 562 2011.46 480.12 4 . 2.31 461 561 2013.77 478.48 5 HIGH WATER MARK 3.08 460 560 2016.85 477.71 6 . 3.20 459 559 2020.05 477.64 7 W/L LB 2.89 458 558 2022.94 477.45 8 0.6 4.26 457 557 2027.19 477.34 9 0.95 3.04 456 556 2030.24 477.14 10 1.5 2.44 455 555 2032.67 477.08 11 1.75 2.89 454 554 2035.56 477.41 12 0.7 1.08 453 553 2036.64 477.61 13 W/L 1.78 452 552 2038.42 477.87 14 TN 2.61 451 551 2041.03 478.57 15 HIGH WATER MARK 0.93 450 550 2041.96 479.86 16 START XS-18 RB MISSION CREEK X/S 19 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 482 582 0.00 479.19 1 DUMMY 2000.00 481 581 2000.00 479.19 2 C/L ROAD END 19 8.73 480 580 2008.73 478.85 3 . 4.79 479 579 2013.53 479.09 4 TOP OF LB 1.30 478 578 2014.83 477.60 5 HIGH WATER MARK 1.19 477 577 2016.02 476.89 6 . 2.01 476 576 2018.03 476.50 7 W/L 2.53 475 575 2020.56 476.04 8 1.5 3.49 474 574 2024.05 476.14 9 1.1 3.05 473 573 2027.10 476.13 10 1.1 3.04 472 572 2030.14 476.19 11 1.05 2.85 471 571 2032.99 476.23 12 0.8 2.42 470 570 2035.41 476.52 13 W/L RB 2.36 469 569 2037.77 477.14 14 TOE CUT 0.63 468 568 2038.40 477.40 15 HIGH WATER MARK 0.02 467 567 2038.42 478.09 16 TOP OF BANK 9.46 466 566 2047.88 478.19 17 ST XS-19 RB MISSION CREEK X/S 20 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 508 608 0.00 478.48 1 DUMMY 2000.00 507 607 2000.00 478.48 2 C/L PATH END 20 4.70 506 606 2004.70 478.32 3 . 4.73 505 605 2009.43 477.52 4 TOP OF LB 0.33 504 604 2009.77 476.87 5 HIGH WATER MARK 1.12 503 603 2010.89 476.24 6 W/L LB 1.67 502 602 2012.56 476.05 7 . 1.61 501 601 2014.17 476.08 8 0.55 2.74 500 600 2016.91 475.78 9 1.6 3.28 499 599 2020.19 475.75 10 1.7 2.74 498 598 2022.93 475.83 11 1.5 1.74 497 597 2024.67 476.25 12 W/L RB 3.78 496 596 2028.45 476.58 13 MOSS LINE 3.45 495 595 2031.90 477.10 14 HIGH WATER MARK 2.27 494 594 2034.17 478.06 15 TOP 3.97 493 593 2038.14 478.07 16 START XS 20 RB MISSION CREEK X/S 21 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 524 624 0.00 478.20 1 DUMMY 2000.00 523 623 2000.00 478.20 2 ST XS 21 LB 1.11 522 622 2001.11 476.44 3 TOE CUT HWM 2.14 521 621 2003.25 475.84 4 . 3.38 520 620 2006.63 475.39 5 . 3.32 519 619 2009.95 475.19 6 W/L LB 1.22 518 618 2011.16 474.92 7 0.9 3.35 517 617 2014.51 474.95 8 0.9 2.74 516 616 2017.25 474.70 9 1.6 2.43 515 615 2019.68 474.84 10 1.2 2.73 514 614 2022.41 474.95 11 1.0 1.53 513 613 2023.94 475.26 12 W/L RB 2.47 512 612 2026.40 475.90 13 . 1.22 511 611 2027.62 476.15 14 HIGH WATER MARK 5.41 510 610 2033.04 477.41 15 TOP RB 10.95 509 609 2043.99 477.61 16 . MISSION CREEK X/S 22 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 552 652 0.00 477.04 1 DUMMY 2000.00 551 651 2000.00 477.04 2 END XS 22 8.17 550 650 2008.17 477.21 3 . 4.21 549 649 2012.38 475.41 4 TOE 11.62 548 648 2024.00 474.89 5 TOP 0.45 547 647 2024.45 474.35 6 HIGH WATER MARK 1.88 546 646 2026.33 473.07 7 W/L LB 0.60 545 645 2026.93 472.86 8 0.7 3.49 544 644 2030.42 472.79 9 0.85 3.06 543 643 2033.48 472.68 10 1.3 1.51 542 642 2034.99 472.68 11 1.3 3.64 541 641 2038.63 472.79 12 1.0 1.30 540 640 2039.93 472.84 13 EDGE OF STONE 0.03 539 639 2039.96 473.11 14 W/L 0.46 538 638 2040.42 474.65 15 . 1.25 537 637 2041.67 475.25 16 . 1.19 536 636 2042.85 475.59 17 . 1.22 535 635 2044.07 473.39 18 EDGE OF STONE 3.66 534 634 2047.73 473.55 19 . 3.05 533 633 2050.78 473.09 20 . 1.22 532 632 2052.00 473.25 21 TOE RB 0.46 531 631 2052.45 473.76 22 . 3.49 530 630 2055.94 474.45 23 . 2.69 529 629 2058.63 475.64 24 . 2.40 528 628 2061.03 476.00 25 . 16.37 527 627 2077.40 475.98 26 . 2.74 526 626 2080.14 476.42 27 . 3.33 525 625 2083.47 478.19 28 ST XS 22 RB MISSION CREEK X/S 23 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 575 675 0.00 475.90 1 DUMMY 2000.00 574 674 2000.00 475.90 2 END XS 23 3.04 573 673 2003.04 474.80 3 TOE 7.89 572 672 2010.93 474.69 4 . 10.36 571 671 2021.29 474.64 5 TOP 1.86 570 670 2023.15 473.28 6 HIGH WATER MARK 2.44 569 669 2025.58 472.75 7 . 1.59 568 668 2027.18 472.02 8 . 2.73 567 667 2029.91 471.45 9 W/L LB 1.93 566 666 2031.84 471.31 10 0.4 0.92 565 665 2032.76 470.72 11 2.2 1.88 564 664 2034.64 470.67 12 2.6 1.75 563 663 2036.39 470.86 13 1.9 1.93 562 662 2038.32 470.72 14 2.2 1.85 561 661 2040.16 470.99 15 1.4 1.88 560 660 2042.04 470.63 16 2.8 1.51 559 659 2043.55 470.79 17 2.2 TOE 0.44 558 658 2043.99 473.67 18 . 1.40 557 657 2045.40 474.10 19 . 4.20 556 656 2049.59 474.84 20 . 2.38 555 655 2051.97 474.02 21 . 3.90 554 654 2055.87 474.67 22 TOE 2.12 553 653 2057.99 475.90 23 ST XS 23 RB MISSION CREEK X/S 24 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 595 695 0.00 476.61 1 DUMMY 2000.00 594 694 2000.00 476.61 2 TOP END XS-24 5.75 593 693 2005.75 472.55 3 TOE OLD WORKINGS 7.60 592 692 2013.35 472.17 4 TOP 0.84 591 691 2014.19 471.52 5 HIGH WATER MARK 1.22 590 690 2015.41 470.77 6 . 2.16 589 689 2017.57 470.24 7 W/L LB 1.82 588 688 2019.40 469.87 8 1.2 2.43 587 687 2021.82 469.91 9 1.0 1.52 586 686 2023.34 469.75 10 1.8 0.91 585 685 2024.25 470.01 11 1.0 2.74 584 684 2026.99 469.82 12 1.5 1.37 583 683 2028.36 470.11 13 0.7 2.13 582 682 2030.50 470.29 14 W/L 0.79 581 681 2031.29 470.41 15 TN 1.19 580 680 2032.48 470.59 16 . 2.43 579 679 2034.91 471.75 17 HIGH WATER MARK 1.34 578 678 2036.25 472.06 18 . 1.19 577 677 2037.44 472.79 19 . 12.92 576 676 2050.36 474.55 20 ST XS 24 RB MISSION CREEK X/S 25 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 612 712 0.00 471.47 1 DUMMY 2000.00 611 711 2000.00 471.47 2 TOE END XS 25 17.01 610 710 2017.01 471.18 3 . 8.23 609 709 2025.24 470.79 4 TOP OF BANK 1.22 608 708 2026.46 469.28 5 TOE 0.31 607 707 2026.77 469.15 6 W/L LB 4.26 606 706 2031.03 468.78 7 1.2 2.44 605 705 2033.47 468.67 8 1.6 3.20 604 704 2036.67 468.61 9 1.8 4.11 603 703 2040.78 468.88 10 1.0 0.61 602 702 2041.39 469.47 11 . 0.91 601 701 2042.30 469.53 12 . 0.46 600 700 2042.76 470.05 13 . 0.79 599 699 2043.55 470.23 14 . 0.88 598 698 2044.44 470.64 15 HIGH WATER MARK 2.07 597 697 2046.51 471.48 16 . 4.15 596 696 2050.66 475.42 17 ST XS 25 RB MISSION CREEK X/S 26 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 629 729 0.00 471.32 1 DUMMY 2000.00 628 728 2000.00 471.32 2 START XS 26 3.35 627 727 2003.35 469.19 3 TN 1.65 626 726 2005.00 468.43 4 W/L LB 1.68 625 725 2006.67 468.06 5 1.3 3.05 624 724 2009.72 467.72 6 2.3 EDGE STONE 0.30 623 723 2010.03 469.14 7 ON STONE 1.53 622 722 2011.55 469.11 8 ON STONE 0.91 621 721 2012.47 467.90 9 1.7 EDGE STONE 1.22 620 720 2013.68 468.00 10 1.5 2.44 619 719 2016.12 468.09 11 1.2 2.74 618 718 2018.86 468.45 12 W/L RB 3.05 617 717 2021.91 468.63 13 . 0.61 616 716 2022.52 469.37 14 HIGH WATER MARK 4.88 615 715 2027.40 470.01 15 . 6.99 614 714 2034.40 470.64 16 . 2.74 613 713 2037.14 472.44 17 END XS 26 RB MISSION CREEK X/S 27 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 646 730 0.00 471.81 1 DUMMY 2000.00 645 731 2000.00 471.81 2 ST XS-27 LB 2.91 644 732 2002.91 468.60 3 . 0.34 643 733 2003.24 468.43 4 . 1.19 642 734 2004.43 467.52 5 . 1.07 641 735 2005.50 467.25 6 W/L LB 1.37 640 736 2006.87 466.89 7 1.2 W 4.88 639 737 2011.74 466.95 8 1.1 W 2.44 638 738 2014.18 466.93 9 1.1 W 2.44 637 739 2016.62 467.05 10 0.75 W 5.48 636 740 2022.10 467.05 11 0.6 W 2.74 635 741 2024.84 467.02 12 0.75 W 0.61 634 742 2025.45 467.24 13 W/L RB 0.61 633 743 2026.06 467.80 14 . 3.36 632 744 2029.42 468.25 15 HIGH WATER MARK 0.61 631 745 2030.03 468.85 16 TOP 4.50 630 746 2034.53 469.05 17 END XS27 RB MISSION CREEK X/S 28 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 672 772 0.00 470.96 1 DUMMY 2000.00 671 771 2000.00 470.96 2 C/L ROAD 4.82 670 770 2004.82 470.68 3 TOP 3.13 669 769 2007.94 467.40 4 HIGH WATER MARK 0.91 668 768 2008.86 467.03 5 . 1.83 667 767 2010.69 466.44 6 TOE 2.16 666 766 2012.85 466.41 7 GL REBAR LB 0.27 665 765 2013.12 466.46 8 W/L LB 1.52 664 764 2014.65 466.13 9 1.1 1.52 663 763 2016.17 466.14 10 1.1 1.83 662 762 2018.00 465.82 11 2.1 W 2.44 661 761 2020.44 465.63 12 2.8 W 1.83 660 760 2022.27 466.19 13 0.9 W 2.74 659 759 2025.01 466.45 14 W/L RB 2.44 658 758 2027.45 466.62 15 . 1.53 657 757 2028.97 467.17 16 HIGH WATER MARK 1.52 656 756 2030.49 467.27 17 TOP 1.52 655 755 2032.02 467.30 18 TOP 1.83 654 754 2033.85 466.91 19 HIGH WATER MARK 7.31 653 753 2041.16 466.36 20 W/L LB 5.79 652 752 2046.95 466.18 21 0.5 3.96 651 751 2050.91 466.34 22 W/L RB 0.61 650 750 2051.52 466.46 23 TOE 0.29 649 749 2051.81 467.04 24 HIGH WATER MARK 0.30 648 748 2052.11 467.39 25 TOP RB 4.51 647 747 2056.62 468.20 26 ST XS-28 RB MISSION CREEK X/S 29 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 691 791 0.00 467.99 1 DUMMY 2000.00 690 790 2000.00 467.99 2 TOE HILL END 29 11.41 689 789 2011.41 466.56 3 TOP 0.92 688 788 2012.32 464.90 4 . 1.32 687 787 2013.65 463.92 5 . 2.52 686 786 2016.17 462.99 6 W/L LB 0.93 685 785 2017.10 462.68 7 0.9 W 1.81 684 784 2018.91 462.56 8 1.3 W 1.85 683 783 2020.75 462.31 9 2.1 W 2.58 682 782 2023.34 462.12 10 3.0 W 3.17 681 781 2026.51 462.29 11 2.1 W 1.52 680 780 2028.03 462.59 12 1.3 W 0.03 679 779 2028.06 463.00 13 W/L RB 1.02 678 778 2029.08 465.62 14 TOP BOULDER. 2.10 677 777 2031.18 465.75 15 . 2.16 676 776 2033.34 465.02 16 TOP BOULDER 0.13 675 775 2033.47 464.03 17 . 2.91 674 774 2036.38 464.49 18 . 2.73 673 773 2039.11 466.65 19 ST XS29 ON SLOPE MISSION CREEK X/S 30 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 707 807 0.00 465.98 1 DUMMY 2000.00 706 806 2000.00 465.98 2 ON SLOPE END 30 3.19 705 805 2003.19 463.59 3 HIGH WATER MARK 2.01 704 804 2005.20 462.55 4 W/L LB 0.76 703 803 2005.96 462.29 5 0.8 2.59 702 802 2008.55 462.00 6 1.8 3.50 701 801 2012.05 462.04 7 1.6 3.04 700 800 2015.09 462.29 8 0.85 2.74 699 799 2017.83 462.45 9 0.3 2.59 698 798 2020.42 462.19 10 1.1 2.89 697 797 2023.31 462.29 11 0.8 1.21 696 796 2024.52 462.49 12 W/L RB 0.94 695 795 2025.47 462.74 13 TN 2.22 694 794 2027.68 463.30 14 TOE SLOPE 0.98 693 793 2028.67 463.95 15 . 0.91 692 792 2029.58 465.27 16 ST XS 30 ON SLOP MISSION CREEK X/S 31 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 724 824 0.00 464.47 1 DUMMY 2000.00 723 823 2000.00 464.47 2 ST XS 31 5.70 722 822 2005.70 464.41 3 . 3.91 721 821 2009.61 463.63 4 TOP OF BANK LB 2.62 720 820 2012.22 462.21 5 TOE 0.97 719 819 2013.19 462.05 6 . 4.53 718 818 2017.72 462.25 7 . 2.21 717 817 2019.93 462.14 8 W/L LB 3.82 716 816 2023.75 461.95 9 0.6 4.45 715 815 2028.20 461.84 10 0.8 3.90 714 814 2032.10 461.77 11 0.8 3.33 713 813 2035.43 461.89 12 0.6 2.30 712 812 2037.73 461.71 13 1.2 0.69 711 811 2038.42 462.08 14 W/L RB 0.83 710 810 2039.25 463.42 15 TOP 2.35 709 809 2041.60 463.75 16 ON SLOPE 4.49 708 808 2046.09 467.35 17 END XS 31 MISSION CREEK X/S 32 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 742 842 0.00 465.20 1 DUMMY 2000.00 741 841 2000.00 465.20 2 END XS 32 4.86 740 840 2004.86 464.32 3 . 5.11 739 839 2009.98 463.44 4 . 3.19 738 838 2013.17 463.72 5 . 6.74 737 837 2019.91 462.62 6 . 4.64 736 836 2024.55 462.62 7 . 2.70 735 835 2027.25 461.65 8 W/L LB 1.18 734 834 2028.44 461.53 9 0.4 3.16 733 833 2031.60 461.43 10 0.8 3.76 732 832 2035.36 461.43 11 0.6 2.66 731 831 2038.02 461.52 12 0.4 2.10 730 830 2040.12 461.26 13 1.4 2.95 729 829 2043.07 461.26 14 1.4 2.81 728 828 2045.88 461.37 15 0.9 1.41 727 827 2047.29 461.66 16 W/L RB 1.20 726 826 2048.49 462.07 17 . 2.24 725 825 2050.73 463.80 18 ST XS 32 MISSION CREEK X/S 33 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 755 855 0.00 462.57 1 DUMMY 2000.00 756 856 2000.00 462.57 2 ST XS 33 ON LB 2.67 757 857 2002.67 461.84 3 TOE 3.63 758 858 2006.30 461.67 4 C/L ROAD 7.29 759 859 2013.59 461.39 5 . 0.76 760 860 2014.35 461.05 6 HIGH WATER MARK 2.41 761 861 2016.76 460.64 7 . 4.11 762 862 2020.87 460.18 8 . 2.41 763 863 2023.28 460.06 9 . 1.25 764 864 2024.53 459.93 10 W/L LB 0.30 765 865 2024.84 459.66 11 1.1 3.35 766 866 2028.19 459.48 12 1.5 3.05 767 867 2031.24 459.37 13 1.8 2.74 768 868 2033.98 459.45 14 1.6 2.13 769 869 2036.11 459.20 15 TOE STONE 2.4 0.15 770 870 2036.26 459.91 16 W/L RB 1.35 771 871 2037.62 461.54 17 ON STONE 0.45 772 872 2038.07 461.62 18 ON STONE 0.76 773 873 2038.83 461.17 19 EDGE OF STONE 1.52 774 874 2040.35 461.37 20 HIGH WATER MARK 1.52 775 875 2041.88 462.01 21 . 2.43 776 876 2044.31 462.16 22 TOE OF SLOPE 4.20 777 877 2048.50 464.61 23 END XS 33 RB MISSION CREEK X/S 34 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 798 898 0.00 459.96 1 DUMMY 2000.00 797 897 2000.00 459.96 2 START XS 34 LB 12.27 796 896 2012.27 460.13 3 . 6.89 795 895 2019.16 460.13 4 . 0.42 794 894 2019.58 459.30 5 . 2.24 793 893 2021.82 458.53 6 GL REBAR LB 0.64 792 892 2022.46 458.44 7 W/L LB 2.74 791 891 2025.20 458.23 8 0.8 2.29 790 890 2027.49 458.19 9 1.0 2.89 789 889 2030.38 458.09 10 1.5 3.35 788 888 2033.73 458.27 11 0.8 1.22 787 887 2034.95 458.50 12 W/L RB 1.21 786 886 2036.16 458.35 13 0.3 1.53 785 885 2037.69 458.43 14 W/L 2.74 784 884 2040.43 458.66 15 . 5.80 783 883 2046.23 459.44 16 . 7.31 782 882 2053.54 459.35 17 . 4.25 781 881 2057.79 459.83 18 TOE 2.88 780 880 2060.67 461.88 19 TOP 15.77 779 879 2076.44 462.42 20 END XS 34 RB MISSION CREEK X/S 35 PROJECT 80-OIP-1 SEPT 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 816 916 0.00 458.59 1 DUMMY 2000.00 815 915 2000.00 458.59 2 . 5.48 814 914 2005.48 458.39 3 TOE 12.34 813 913 2017.82 458.07 4 TOP OF BANK 0.15 812 912 2017.98 457.62 5 . 5.18 811 911 2023.16 456.96 6 W/L LB 2.13 810 910 2025.29 456.81 7 0.5 2.44 809 909 2027.73 456.54 8 1.4 3.96 808 908 2031.69 456.51 9 1.3 3.05 807 907 2034.74 456.59 10 1.1 3.05 806 906 2037.79 456.59 11 1.0 2.13 805 905 2039.92 456.94 12 W/L RB 2.16 804 904 2042.08 457.25 13 GL REBAR RB 1.80 803 903 2043.88 457.07 14 . 3.94 802 902 2047.82 457.37 15 TOE 1.21 801 901 2049.03 457.78 16 . 2.38 800 900 2051.41 459.15 17 . 3.35 799 899 2054.76 460.52 18 ST XS 35 RB