THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. NAVER CREEK X/S 1 PROJ 88-RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1331 0.00 574.25 1 DUMMY 2000.00 1330 2000.00 574.25 2 TOP-FLAT 15 RR 17.34 1329 2017.34 567.13 3 TOE-SLOPE 7.08 1328 2024.42 566.61 4 BP 2.64 1327 2027.06 566.15 5 BP 1.19 1326 2028.26 566.48 6 BP 3.57 1325 2031.82 566.49 7 EDGE-TREES 12.89 1324 2044.71 566.52 8 FIELD LEVEL 15.34 1323 2060.05 566.67 9 TOP @ BOLT LB 4.18 1322 2064.24 564.68 10 ON-SL 3.87 1321 2068.10 561.98 11 WL LB 1.11 1320 2069.22 561.15 12 TOE.83 1.17 1319 2070.39 561.20 13 .79 1.53 1318 2071.92 561.05 14 .94 6.07 1317 2077.98 561.03 15 .95 0.56 1316 2078.54 561.10 16 .88 3.34 1315 2081.88 561.38 17 .6 4.30 1314 2086.18 561.50 18 .44 3.38 1313 2089.56 561.51 19 .44 2.72 1312 2092.28 561.52 20 .44 2.62 1311 2094.90 561.96 21 WL RB 4.35 1310 2099.25 562.61 22 NB 6.80 1309 2106.05 562.91 23 BP 10.02 1308 2116.07 563.15 24 GL BOLT RB 6.47 1307 2122.54 563.36 25 BP 5.83 1306 2128.38 563.49 26 BP 14.90 1305 2143.28 564.16 27 BP 11.79 1304 2155.07 564.10 28 BP 32.59 1303 2187.66 563.59 29 BP 24.17 1302 2211.83 564.32 30 TOE 3.18 1301 2215.01 567.17 31 TOP BANK 4.12 1300 2219.13 567.11 32 FLAT BEYOND JOIN 331-300 NORTH 2219.128 END NAVER CREEK X/S 2 PROJ 88-RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2326 0.00 564.29 1 DUMMY 2000.00 2325 2000.00 564.29 2 GL BOLT LB 7.64 2324 2007.64 564.13 3 BP 6.97 2323 2014.61 564.25 4 BP 4.11 2322 2018.72 563.93 5 BP 8.09 2321 2026.81 564.10 6 BP 9.13 2320 2035.94 564.02 7 EDGE.TREES 6.36 2319 2042.30 563.98 8 BP 5.35 2318 2047.66 563.58 9 GRASS.LINE 6.54 2317 2054.20 563.54 10 BP 4.74 2316 2058.94 563.05 11 BP 4.31 2315 2063.25 563.07 12 WL LB 6.08 2314 2069.33 562.68 13 .38 5.64 2313 2074.97 562.31 14 .77 2.60 2312 2077.57 562.13 15 .96 8.13 2311 2085.70 561.99 16 1.1 1.07 2310 2086.77 562.28 17 .82 0.62 2309 2087.39 562.66 18 .44 0.21 2308 2087.60 563.05 19 WL RB 0.67 2307 2088.28 564.65 20 TOP RB 4.17 2306 2092.45 564.91 21 GL BOLT RB 3.16 2305 2095.60 564.93 22 BP 7.80 2304 2103.40 565.13 23 TOE-SLOPE 10.17 2303 2113.57 565.99 24 ON-SLOPE 12.69 2302 2126.26 566.97 25 TOP-BANK 15.38 2301 2141.64 566.91 26 BP 19.77 2300 2161.42 567.05 27 FLAT-BEYOND JOIN 326-300 NORTH 2161.415 END NAVER CREEK X/S 3 PROJ 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3299 0.00 565.38 1 DUMMY 2000.00 3300 2000.00 565.38 2 RISE 4.77 3301 2004.77 565.49 3 TOP 2.08 3302 2006.84 564.35 4 TOE 4.92 3303 2011.77 564.05 5 BP 2.44 3304 2014.21 564.35 6 BP 11.10 3305 2025.31 564.29 7 GL BOLT LB 6.02 3306 2031.32 564.36 8 BP 3.57 3307 2034.90 563.92 9 BP 1.70 3308 2036.60 564.28 10 BP 10.98 3309 2047.58 564.34 11 BP 12.68 3310 2060.26 564.44 12 BP 2.73 3311 2062.99 564.20 13 NB 1.60 3312 2064.58 564.04 14 BP 7.18 3313 2071.76 564.44 15 EDGE-T-TRASH 3.33 3314 2075.09 564.36 16 TOP-LB 2.67 3315 2077.77 563.63 17 TOE 3.20 3316 2080.97 563.45 18 .23 1.31 3317 2082.27 563.39 19 .29 1.76 3318 2084.03 563.60 20 BP 1.15 3319 2085.17 563.58 21 WL LB 3.34 3320 2088.52 563.31 22 .65 4.69 3321 2093.21 563.09 23 .5 2.74 3322 2095.94 562.93 24 .69 5.04 3323 2100.98 562.83 25 .75 0.59 3324 2101.57 562.89 26 .72 1.26 3325 2102.83 563.09 27 .47 2.10 3326 2104.94 563.25 28 .32 1.88 3327 2106.81 563.33 29 .27 1.69 3328 2108.50 563.56 30 WL RB 1.44 3329 2109.94 563.75 31 TOP-BAR 1.50 3330 2111.44 563.51 32 BP 1.46 3331 2112.90 563.33 33 TOE 0.4 0.92 3332 2113.82 563.76 34 BP 1.50 3333 2115.32 564.52 35 SCOUR 1.94 3334 2117.26 566.34 36 BP 0.56 3335 2117.82 567.93 37 TOP-BANK 6.14 3336 2123.96 568.17 38 BP 3.97 3337 2127.93 568.04 39 BP 4.05 3338 2131.99 568.13 40 GL BOLT RB 0.99 3339 2132.97 567.75 41 TOP-BANK 1.12 3340 2134.10 566.44 42 TOE-BANK 6.71 3341 2140.80 566.27 43 BP 1.91 3342 2142.72 566.53 44 BP 4.90 3343 2147.62 566.32 45 BP 7.21 3344 2154.83 566.48 46 BP 11.88 3345 2166.71 566.30 47 BP 7.40 3346 2174.11 566.10 48 TOP 2.01 3347 2176.12 565.43 49 TOE 4.31 3348 2180.43 565.30 50 TOE 2.51 3349 2182.94 566.12 51 TOP-DRY-CHANNEL 7.05 3350 2189.99 566.27 52 BP 4.30 3351 2194.29 566.10 53 TOP 1.90 3352 2196.18 565.75 54 TOE 3.04 3353 2199.23 565.75 55 BP 4.26 3354 2203.49 565.09 56 BP 3.81 3355 2207.30 565.15 57 BP 3.06 3356 2210.36 565.07 58 TOP-DITCH 1.55 3357 2211.91 564.60 59 CL.25 0.68 3358 2212.59 564.59 60 TOE.15 1.49 3359 2214.08 566.22 61 TOPBANK 5.43 3360 2219.51 566.38 62 BP 6.93 3361 2226.45 566.23 63 TOE-HWY-FILL 3.36 3362 2229.80 568.43 64 TOP-BENCH JOIN 299-362 NORTH 2229.800 END NAVER CREEK X/S 4 PROJ 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4299 0.00 568.80 1 DUMMY 2000.00 4300 2000.00 568.80 2 FLAT-BEYOND 5.38 4301 2005.38 568.91 3 GL BOLT LB 6.83 4302 2012.21 568.75 4 TOP-CUT-BANK 3.48 4303 2015.69 564.90 5 TOE-CUT-BANK 2.11 4304 2017.80 564.38 6 BP 2.87 4305 2020.68 564.35 7 BP 2.45 4306 2023.13 564.78 8 TRASH-LINE 8.40 4307 2031.53 565.31 9 TOP-BAR 3.27 4308 2034.80 565.01 10 BAR 5.26 4309 2040.06 564.95 11 BP 0.80 4310 2040.86 564.55 12 BP 1.46 4311 2042.32 564.52 13 BP 1.65 4312 2043.97 564.30 14 BP 1.84 4313 2045.80 564.29 15 BP 2.17 4314 2047.98 564.70 16 TOP-BAR 3.70 4315 2051.67 564.66 17 TOP-BAR 3.49 4316 2055.17 564.09 18 BP 1.72 4317 2056.89 564.54 19 BP 1.00 4318 2057.88 564.51 20 BP 0.69 4319 2058.57 564.23 21 WL LB 1.38 4320 2059.95 563.99 22 .28 2.14 4321 2062.10 563.85 23 .44 1.79 4322 2063.89 563.86 24 .4 2.61 4323 2066.50 564.04 25 .21 2.12 4324 2068.62 563.64 26 .58 1.36 4325 2069.98 563.41 27 .83 0.85 4326 2070.83 563.37 28 .83 3.60 4327 2074.43 563.53 29 .66 1.96 4328 2076.39 563.55 30 .65 2.31 4329 2078.71 563.46 31 .73TOE 1.79 4330 2080.50 564.18 32 WL RB 0.62 4331 2081.13 565.52 33 TOP-BANK 1.70 4332 2082.82 564.77 34 TOE 2.86 4333 2085.68 564.89 35 TOE 0.76 4334 2086.44 565.22 36 TOP 1.13 4335 2087.57 565.21 37 TOP 2.30 4336 2089.88 564.31 38 TOE 2.25 4337 2092.13 565.07 39 TOP 2.36 4338 2094.49 565.16 40 TOP 1.46 4339 2095.95 564.83 41 BP 5.69 4340 2101.64 565.13 42 BP 8.66 4341 2110.30 565.21 43 BP 5.31 4342 2115.62 566.05 44 TOP-CL-PATH 7.17 4343 2122.79 566.78 45 GL BOLT RB 3.18 4344 2125.97 567.09 46 TOP 5.03 4345 2131.00 567.19 47 BP 8.12 4346 2139.11 567.35 48 BP 6.41 4347 2145.52 567.18 49 CL-BEYOND 5.61 4348 2151.13 567.19 50 EDGE-BEYOND 3.76 4349 2154.89 567.15 51 EDGE-BEYOND 4.62 4350 2159.51 567.30 52 FLAT-BEYOND JOIN 299-350 NORTH 2159.514 END NAVER CREEK X/S 5 PR0J 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5299 0.00 570.79 1 DUMMY 2000.00 5300 2000.00 570.79 2 SL-RISE30M 13.38 5301 2013.38 570.49 3 GL BOLT LB 7.95 5302 2021.33 570.02 4 CL-D-BEYOND 10.83 5303 2032.16 569.99 5 TOP-BAD-CUT-B 1.32 5304 2033.48 566.42 6 BP 1.66 5305 2035.14 565.28 7 TOE-CUT 2.10 5306 2037.24 565.09 8 WL LB 1.95 5307 2039.19 564.17 9 .94 5.42 5308 2044.61 564.26 10 .85 0.29 5309 2044.90 564.30 11 .84 1.08 5310 2045.98 564.37 12 .76 1.77 5311 2047.75 564.52 13 .58 1.27 5312 2049.02 564.60 14 .5 4.33 5313 2053.36 565.06 15 WL RB 1.55 5314 2054.91 565.28 16 BAR 2.68 5315 2057.58 565.24 17 .05 2.73 5316 2060.31 565.25 18 .08 1.95 5317 2062.27 565.38 19 BP 7.57 5318 2069.84 565.70 20 BP 9.32 5319 2079.16 565.97 21 TRASH 8.84 5320 2088.00 565.98 22 BP 10.54 5321 2098.54 566.12 23 TOP-BC 1.53 5322 2100.08 565.42 24 CL 2.21 5323 2102.28 566.08 25 TOP 10.51 5324 2112.80 565.98 26 BP 9.68 5325 2122.48 565.82 27 BP 10.64 5326 2133.12 565.75 28 BP 5.66 5327 2138.79 565.76 29 TOE-BANK 2.77 5328 2141.55 566.95 30 GL BOLT RB 8.56 5329 2150.11 567.28 31 BP 4.69 5330 2154.80 567.48 32 EDGE-BEYOND 5.52 5331 2160.33 567.51 33 EDGE-BEYOND 7.20 5332 2167.53 567.50 34 FLAT-BEYOND JOIN 299-332 NORTH 2167.525 END NAVER CREEK X/S 6 PROJ 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6299 0.00 569.24 1 DUMMY 2000.00 6300 2000.00 569.24 2 SPOT-CL-BEYOND 3.97 6301 2003.97 569.16 3 EDGERC 6.94 6302 2010.91 569.00 4 BP 23.54 6303 2034.44 569.17 5 OPP-COR-H 19.22 6304 2053.66 569.30 6 BP 13.71 6305 2067.37 568.98 7 BP 12.13 6306 2079.50 568.97 8 GL BOLT LB 2.36 6307 2081.87 568.13 9 TOE 10.74 6308 2092.61 567.62 10 BP 4.86 6309 2097.47 567.84 11 BP 4.83 6310 2102.30 567.72 12 BP 9.44 6311 2111.74 568.01 13 BP 4.07 6312 2115.81 567.34 14 TOP-BANK 2.01 6313 2117.82 566.51 15 TOE 6.29 6314 2124.11 566.76 16 BP 8.97 6315 2133.08 566.86 17 BP 1.46 6316 2134.54 566.53 18 HWM 7.47 6317 2142.01 566.48 19 BP 3.91 6318 2145.92 566.06 20 WL LB 4.21 6319 2150.12 565.65 21 .4 4.61 6320 2154.73 565.49 22 .57 3.25 6321 2157.98 565.45 23 .63 3.38 6322 2161.36 565.43 24 .68 2.38 6323 2163.74 565.41 25 .68 2.62 6324 2166.36 565.20 26 .85 0.92 6325 2167.27 565.10 27 .93 1.36 6326 2168.63 565.32 28 .71TOE 0.27 6327 2168.90 566.05 29 WL RB 0.90 6328 2169.80 566.73 30 TOP-BANK 4.12 6329 2173.92 566.74 31 BP 2.39 6330 2176.31 567.02 32 TOE 2.60 6331 2178.90 567.63 33 GL BOLT RB 2.38 6332 2181.28 567.87 34 TOP 5.33 6333 2186.61 567.76 35 BP 6.03 6334 2192.64 567.92 36 BP 7.05 6335 2199.69 567.85 37 FLAT JOIN 299-335 NORTH 2199.693 END NAVER CREEK X/S 7 PROJ 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7299 0.00 568.90 1 DUMMY 2000.00 7300 2000.00 568.90 2 CL-DW 18.01 7301 2018.01 569.02 3 LAWN 26.34 7302 2044.35 569.06 4 CL-DW 5.26 7303 2049.61 569.19 5 CL-DW 35.60 7304 2085.21 569.30 6 EDGE-BEYOND 23.99 7305 2109.19 569.04 7 CL.BEYOND 23.50 7306 2132.69 568.75 8 EDGE-PAVEMENT 14.23 7307 2146.92 568.32 9 BP 2.94 7308 2149.86 567.86 10 BP 12.87 7309 2162.73 567.76 11 FENCE 0.77 7310 2163.50 567.73 12 GL BOLT LB 2.32 7311 2165.82 567.20 13 BP 2.17 7312 2167.99 567.20 14 EDGE-BC 2.37 7313 2170.36 567.15 15 BP 1.84 7314 2172.21 567.49 16 EBC 2.79 7315 2175.00 567.58 17 BP 4.93 7316 2179.93 567.41 18 TOP-MAIN LB 0.55 7317 2180.49 566.38 19 .5 0.88 7318 2181.36 565.65 20 1.2 7.82 7319 2189.18 565.92 21 .92 0.95 7320 2190.14 566.02 22 .82 1.23 7321 2191.37 566.08 23 .74TOE 2.61 7322 2193.97 566.81 24 WL RB 0.60 7323 2194.57 566.98 25 BAR 2.35 7324 2196.93 566.98 26 BAR 0.85 7325 2197.78 566.73 27 .12 1.28 7326 2199.06 566.82 28 .04 2.39 7327 2201.45 566.83 29 .06 1.26 7328 2202.72 566.64 30 .28 2.07 7329 2204.78 566.65 31 .28 0.64 7330 2205.43 566.80 32 WL 0.96 7331 2206.39 567.16 33 TOP 1.57 7332 2207.96 567.05 34 TOE-HWY 2.89 7333 2210.85 568.99 35 ON-SL 0.77 7334 2211.62 569.53 36 TOP-RIPRAP 1.95 7335 2213.57 569.74 37 TOE 4.56 7336 2218.13 572.06 38 GL BOLT RB 7.09 7337 2225.22 572.34 39 CL-HWY 6.60 7338 2231.82 572.37 40 EDGE-PAVE. 9.12 7339 2240.94 571.79 41 BP 27.90 7340 2268.84 571.42 42 EDGE.GRAS 20.45 7341 2289.29 571.15 43 BP 31.27 7342 2320.56 571.33 44 CL-DWY 24.38 7343 2344.94 571.44 45 EDGE-TREES 15.04 7344 2359.98 572.19 46 TOE-SL 8.46 7345 2368.45 574.23 47 BP JOIN 299-345 NORTH 2368.446 END NAVER CREEK X/S 8 PROJ 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8299 0.00 570.02 1 DUMMY 2000.00 8300 2000.00 570.02 2 EDGE-DW 15.12 8301 2015.12 568.88 3 BP 15.46 8302 2030.58 568.56 4 GL BOLT LB 4.97 8303 2035.55 568.54 5 TOP-BANK 0.96 8304 2036.51 568.07 6 TOE-NB 3.26 8305 2039.77 567.68 7 .16 1.94 8306 2041.71 567.33 8 .5 3.11 8307 2044.82 567.24 9 .61 3.07 8308 2047.89 567.59 10 .25 3.23 8309 2051.12 567.84 11 WL LB 6.39 8310 2057.51 567.59 12 .28 5.71 8311 2063.22 567.43 13 .4 3.38 8312 2066.60 567.12 14 .71 1.80 8313 2068.40 566.95 15 .92 3.51 8314 2071.91 566.62 16 1.25 1.11 8315 2073.02 566.95 17 .88 0.63 8316 2073.66 567.53 18 .31 0.19 8317 2073.85 567.56 19 .31 0.82 8318 2074.67 567.86 20 WL RB 0.33 8319 2075.01 568.46 21 TOP-BANK 4.51 8320 2079.52 568.50 22 BP 3.54 8321 2083.06 568.58 23 TOP 2.84 8322 2085.90 568.06 24 TOE-BACKCHANNEL 3.42 8323 2089.32 568.09 25 TOE-BACKCHANNEL 4.11 8324 2093.43 568.45 26 TOP 4.64 8325 2098.08 568.56 27 BP 6.40 8326 2104.47 568.60 28 FENCE 4.22 8327 2108.70 568.29 29 BP 2.34 8328 2111.03 568.67 30 TOP 13.95 8329 2124.99 568.90 31 FENCE 4.27 8330 2129.25 569.01 32 CL-BEYOND 3.49 8331 2132.74 569.59 33 EDGE-BEYOND-TOE 2.55 8332 2135.30 570.51 34 TOP-BANK 3.56 8333 2138.86 570.99 35 TOP 9.31 8334 2148.17 571.38 36 TOP 5.13 8335 2153.29 571.30 37 2.89 8336 2156.18 571.06 38 FENCE 0.50 8337 2156.68 571.05 39 GL BOLT RB 7.38 8338 2164.06 571.12 40 CL DRIVEWAY 15.32 8339 2179.38 571.51 41 BP 9.41 8340 2188.79 571.59 42 GL BOLT RB JOIN 299-340 NORTH 2188.788 END NAVER CREEK X/S 9 PROJ 88RPP-11 MAY 26 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9299 0.00 571.28 1 DUMMY 2000.00 9300 2000.00 571.28 2 ON BEYOND. SL 2.15 9301 2002.15 569.33 3 TOE-SL 12.62 9302 2014.77 569.27 4 BP 18.52 9303 2033.30 569.14 5 BP 10.71 9304 2044.01 569.12 6 EDGE-TREES 16.06 9305 2060.06 568.99 7 SLOUGH 3.24 9306 2063.30 568.39 8 .4 1.56 9307 2064.86 568.53 9 .26 1.87 9308 2066.74 568.76 10 WL LB 1.37 9309 2068.11 569.22 11 TOP 3.70 9310 2071.81 569.17 12 GL BOLT LB 3.63 9311 2075.44 568.96 13 BP 7.09 9312 2082.54 569.29 14 BP 6.42 9313 2088.95 568.97 15 TOP-CUT 0.58 9314 2089.53 567.32 16 1.02TOE 1.10 9315 2090.63 567.09 17 1.23 1.28 9316 2091.91 567.22 18 1.15 5.72 9317 2097.63 567.48 19 .83 1.64 9318 2099.27 567.66 20 .65 2.29 9319 2101.56 567.73 21 .6 2.01 9320 2103.57 567.79 22 .5TOE 3.68 9321 2107.25 568.28 23 WL RB 1.52 9322 2108.77 568.69 24 TOP-BAR 19.71 9323 2128.48 569.06 25 BP 11.63 9324 2140.11 569.08 26 BP 11.14 9325 2151.25 569.00 27 BP 7.93 9326 2159.18 568.76 28 TOP-BACKCHANNEL 1.85 9327 2161.03 568.41 29 TOE 2.25 9328 2163.28 568.35 30 TOE 0.93 9329 2164.21 568.68 31 TOP 4.65 9330 2168.85 568.99 32 BP 3.90 9331 2172.75 570.34 33 TOP-HEN-PEN 10.99 9332 2183.74 570.55 34 FENCE 6.73 9333 2190.47 570.66 35 FENCE-COR 11.62 9334 2202.08 570.56 36 FENCE 8.51 9335 2210.60 570.53 37 BP 7.49 9336 2218.09 570.52 38 BP 7.65 9337 2225.74 571.05 39 BP 0.11 9338 2225.85 571.05 40 GL BOLT RB 21.07 9339 2246.92 571.44 41 CL DRIVEWAY 22.84 9340 2269.76 571.78 42 P 18.57 9341 2288.33 571.97 43 CL 6.17 9342 2294.50 571.97 44 TOE.HWY 3.98 9343 2298.49 574.11 45 TOP 7.26 9344 2305.74 574.35 46 CL-HWY 7.35 9345 2313.09 574.20 47 EDGE-HWY 4.19 9346 2317.28 573.92 48 TOP 5.86 9347 2323.13 571.86 49 TOE 9.91 9348 2333.04 571.54 50 FENCE-FIELD-L JOIN 299-348 NORTH 2333.040 END NAVER CREEK X/S 10 PROJ 88-RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10299 0.00 577.63 1 DUMMY 2000.00 10300 2000.00 577.63 2 SCHOOL-WALL 16.55 10301 2016.55 577.18 3 CORNER-PAVE 31.12 10302 2047.67 576.31 4 PLAY-FIELD 26.03 10303 2073.70 575.94 5 PLAY-FIELD 31.90 10304 2105.60 575.28 6 BP 13.27 10305 2118.87 573.63 7 FENCE 1.43 10306 2120.30 573.58 8 TOP-DITCH 3.05 10307 2123.35 572.89 9 CL 4.34 10308 2127.69 573.54 10 TOP 2.76 10309 2130.45 573.59 11 ED-BEYOND 13.83 10310 2144.27 573.37 12 ED-BEYOND 7.26 10311 2151.53 572.60 13 DITCH 3.36 10312 2154.89 572.63 14 DITCH 3.06 10313 2157.95 573.40 15 ED-BEYOND 7.79 10314 2165.74 573.47 16 CL 3.75 10315 2169.49 573.33 17 10ED-BEYOND 2.51 10316 2172.00 573.07 18 GL BOLT LB 3.18 10317 2175.17 572.20 19 BP 2.95 10318 2178.12 570.55 20 TOE 5.04 10319 2183.17 570.08 21 BP 5.11 10320 2188.28 570.28 22 BP 16.98 10321 2205.26 570.35 23 BP 1.86 10322 2207.12 569.94 24 BP 4.14 10323 2211.26 570.35 25 BP 10.74 10324 2222.00 570.40 26 BP 3.66 10325 2225.66 570.06 27 CL-TRAIL 4.87 10326 2230.53 570.04 28 TOP 4.21 10327 2234.74 569.17 29 TOE 16.89 10328 2251.63 570.47 30 BP 2.46 10329 2254.10 570.20 31 TOP-LEFT BANK 0.96 10330 2255.06 569.96 32 TOP 2.03 10331 2257.09 567.94 33 .9TOE-WHEEL 1.43 10332 2258.52 567.88 34 1.01 2.41 10333 2260.93 568.59 35 .29 4.47 10334 2265.39 568.47 36 .42 4.05 10335 2269.44 568.41 37 .5 3.99 10336 2273.43 568.36 38 .55 4.22 10337 2277.65 568.42 39 .47 1.04 10338 2278.69 568.47 40 .37 0.75 10339 2279.44 568.85 41 WL RB 0.45 10340 2279.89 569.89 42 TOP-BANK 3.64 10341 2283.53 570.00 43 BP 3.19 10342 2286.72 569.43 44 BP 1.89 10343 2288.61 569.87 45 FENCE 10.44 10344 2299.05 569.58 46 BP 9.59 10345 2308.64 569.46 47 BP 8.56 10346 2317.20 569.34 48 TOE 2.61 10347 2319.80 570.77 49 TOP 10.75 10348 2330.55 570.92 50 FENCE 6.19 10349 2336.74 571.61 51 LAWN 7.42 10350 2344.16 571.61 52 LAWN 6.16 10351 2350.32 571.57 53 GL BOLT RB 25.12 10352 2375.44 571.47 54 CL DUP 0.00 10353 2375.44 571.47 55 CL-DRIVEWAY 5.83 10354 2381.27 571.46 56 EDGE-LAWN 5.99 10355 2387.26 572.36 57 EDGE-HOUSE JOIN 299-355 NORTH 2387.262 END NAVER CREEK C/L HWY OVER BRIDGE MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10212 0.00 574.68 1 CL-HWY 43.54 10211 43.54 574.65 2 CL-HWY-CL-BEYOND 21.58 10210 65.13 574.64 3 CL-HWY 31.29 10209 96.42 574.71 4 CL-HWY-END-BR 31.46 10208 127.87 574.72 5 CL-HWY-CL-BR 28.04 10207 155.92 574.67 6 CL-HWY-END-BR 59.12 10206 215.03 574.49 7 CL-HWY 43.51 10205 258.54 574.31 8 CL-HWY 28.51 10204 287.05 574.08 9 CL-HWY END NAVER CREEK X/S 11 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11299 0.00 574.54 1 DUMMY 2000.00 11300 2000.00 574.54 2 EDG-BEYOND 36.08 11301 2036.08 574.51 3 CL-BEYOND-ER 26.23 11302 2062.31 574.48 4 E-R 19.67 11303 2081.98 574.48 5 E-R 4.08 11304 2086.06 574.66 6 BP 0.10 11305 2086.16 574.65 7 GL BOLT LB 2.39 11306 2088.55 574.93 8 TOP-ABUT 0.29 11307 2088.84 574.92 9 TOP-ABUT 0.02 11308 2088.87 574.11 10 TOE-ABUT 4.01 11309 2092.88 572.77 11 BP 3.54 11310 2096.42 571.99 12 BP 3.78 11311 2100.20 570.72 13 TOE 2.78 11312 2102.98 570.68 14 TOP 0.95 11313 2103.94 569.91 15 NB 1.85 11314 2105.78 569.39 16 TOE CL-PIER 6.84 11315 2112.62 569.11 17 WL LB 4.84 11316 2117.46 568.74 18 .37 3.47 11317 2120.92 568.49 19 .6 1.85 11318 2122.77 568.32 20 .83 0.96 11319 2123.73 568.25 21 .89 4.83 11320 2128.55 568.16 22 .99 1.15 11321 2129.70 568.34 23 .8-TOE 0.87 11322 2130.57 568.89 24 .25 CL-PIER 0.89 11323 2131.47 569.12 25 WL RB 1.30 11324 2132.77 569.77 26 NB 1.23 11325 2134.00 570.20 27 BP 0.94 11326 2134.95 570.71 28 TOP 6.33 11327 2141.28 570.77 29 TOE 2.44 11328 2143.71 572.12 30 BP 4.36 11329 2148.07 573.53 31 TOE-ABUT 0.06 11330 2148.13 574.89 32 TOP-ABUT 0.29 11331 2148.41 574.90 33 TOP-ABUT 0.13 11332 2148.54 574.04 34 TOE 1.94 11333 2150.49 574.63 35 GL BOLT RB 16.31 11334 2166.80 574.42 36 TOP-BEYOND-BANK 41.18 11335 2207.98 574.32 37 TOP-BEYOND-BANK 34.87 11336 2242.85 574.15 38 TOP-BEYOND-BANK 56.11 11337 2298.95 573.77 39 CL-BEYOND-EDGE JOIN 299-337 NORTH 2298.954 END NAVER CREEK X/S 12 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 12299 0.00 574.52 1 DUMMY 2000.00 12300 2000.00 574.52 2 CL-DR-WY 29.64 12301 2029.64 574.56 3 EDGE-HWY 24.86 12302 2054.50 574.50 4 CL-DRIVEWAY 27.15 12303 2081.65 574.54 5 EDGE-HWY 27.53 12304 2109.18 574.58 6 EDGE-HWY 2.44 12305 2111.62 574.77 7 GL BOLT LB 1.08 12306 2112.70 574.96 8 TOP-ABUT 0.27 12307 2112.97 574.95 9 TOP-ABUT 0.21 12308 2113.18 573.78 10 TOE-ABUT 3.82 12309 2117.00 572.65 11 BP 1.87 12310 2118.88 572.49 12 BP 3.66 12311 2122.53 570.92 13 BP 3.18 12312 2125.72 570.74 14 PATH 4.23 12313 2129.95 570.30 15 TOP-BANK 0.64 12314 2130.59 569.88 16 CL-PIER 1.96 12315 2132.55 569.20 17 TOE 4.03 12316 2136.58 569.13 18 WL LB 5.47 12317 2142.05 568.74 19 .42 3.03 12318 2145.08 568.47 20 .64 1.98 12319 2147.06 568.41 21 .77 CL 2.03 12320 2149.10 568.46 22 .7 1.76 12321 2150.85 568.42 23 .75 1.90 12322 2152.75 568.41 24 .75 1.35 12323 2154.10 568.34 25 .8TOE 0.78 12324 2154.88 568.88 26 .28CL-PIER 1.10 12325 2155.98 569.17 27 WL RB 2.40 12326 2158.38 570.12 28 NB 1.11 12327 2159.49 570.59 29 TOP 2.64 12328 2162.12 570.84 30 BP 3.33 12329 2165.45 571.45 31 TOE 2.18 12330 2167.63 572.66 32 TOP 1.07 12331 2168.70 572.53 33 TOE 3.68 12332 2172.37 573.71 34 TOE-ABUT 0.14 12333 2172.52 574.85 35 TOP-ABUT 0.16 12334 2172.68 574.85 36 TOP-ABUT 0.04 12335 2172.72 574.26 37 TOE-ABUT 0.90 12336 2173.62 574.48 38 BP 0.54 12337 2174.16 574.49 39 GL BOLT RB 22.90 12338 2197.06 574.34 40 EDGE-BEYOND 32.16 12339 2229.22 574.33 41 EDGE-BEYOND 40.33 12340 2269.55 574.20 42 BEYOND-INTERSECT JOIN 299-340 NORTH 2269.549 END NAVER CREEK X/S 13 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13351 0.00 574.68 1 DUMMY 2000.00 13350 2000.00 574.68 2 CL-HWY 12.41 13349 2012.41 574.45 3 TOPEDGE-HWY 35.40 13348 2047.81 573.88 4 CL-GAS-PUMPS 16.32 13347 2064.14 573.57 5 GL BOLT LB 9.48 13346 2073.61 573.15 6 TOP 5.72 13345 2079.33 571.80 7 TOE 9.07 13344 2088.40 571.33 8 BP 15.77 13343 2104.17 571.18 9 TOP 4.88 13342 2109.05 570.97 10 BP 11.26 13341 2120.31 570.99 11 TOP 1.90 13340 2122.21 570.39 12 TOE 5.58 13339 2127.79 570.34 13 BP 7.67 13338 2135.46 570.33 14 TOP-BANK-NB 0.95 13337 2136.41 569.58 15 WL LB 0.91 13336 2137.32 569.00 16 .55 1.28 13335 2138.60 569.00 17 .6 2.29 13334 2140.89 569.06 18 .52 2.23 13333 2143.12 569.16 19 .4 4.28 13332 2147.41 569.44 20 .14 5.13 13331 2152.53 569.46 21 .19 4.83 13330 2157.36 569.63 22 WL RB 5.86 13329 2163.22 570.04 23 TOP-BAR 5.15 13328 2168.37 569.67 24 BP 4.63 13327 2173.00 569.57 25 .13 3.20 13326 2176.20 569.59 26 BP 1.75 13325 2177.96 569.70 27 TOP-BAR 0.77 13324 2178.73 569.53 28 WL LB 2.90 13323 2181.63 569.30 29 .22 2.15 13322 2183.77 569.01 30 .55 1.45 13321 2185.22 568.91 31 .7 1.60 13320 2186.82 568.65 32 1.05 RB 0.88 13319 2187.70 569.03 33 .63TOE 0.78 13318 2188.48 570.54 34 TOP 2.00 13317 2190.48 570.45 35 BP 3.13 13316 2193.61 570.74 36 TOE 1.63 13315 2195.24 571.27 37 BP 0.41 13314 2195.65 571.28 38 BPTOP-BANK 2.87 13313 2198.52 571.16 39 GL BOLT RB 0.84 13312 2199.36 571.26 40 FENCE 3.59 13311 2202.95 571.36 41 BP 5.70 13310 2208.65 572.48 42 EDGE-BEYOND 4.42 13309 2213.07 572.48 43 EDGE-BEYOND 1.65 13308 2214.72 572.26 44 P 2.18 13307 2216.90 572.74 45 FENCE 13.37 13306 2230.27 572.60 46 BP 5.68 13305 2235.95 572.13 47 BP 4.55 13304 2240.50 572.47 48 BP 14.15 13303 2254.65 572.32 49 FIELD 37.18 13302 2291.83 572.02 50 FIELD 28.77 13301 2320.60 572.41 51 TOE-SLOPE 9.44 13300 2330.05 573.79 52 RISE3H1V JOIN 351-300 NORTH 2330.048 END NAVER CREEK X/S 14 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 14341 0.00 576.13 1 DUMMY 2000.00 14340 2000.00 576.13 2 FENCE-FLAT 2.49 14339 2002.49 576.09 3 TOP 5.18 14338 2007.67 573.73 4 TOE HWY 2.39 14337 2010.06 574.58 5 TOP HWY 15.93 14336 2025.99 574.43 6 TOP 2.34 14335 2028.33 573.65 7 TOE-HWY 18.31 14334 2046.64 573.54 8 CL-BEYOND 34.02 14333 2080.66 573.65 9 BP 21.27 14332 2101.93 573.58 10 TOP-LAWN 15.97 14331 2117.90 572.69 11 GL BOLT LB 3.04 14330 2120.94 572.53 12 TOP 3.07 14329 2124.01 571.93 13 TOE 4.07 14328 2128.08 571.52 14 BP 5.38 14327 2133.46 571.29 15 NB 2.84 14326 2136.30 570.86 16 TOP-BANK 0.34 14325 2136.64 570.60 17 WL LB 1.48 14324 2138.12 570.15 18 .45 1.50 14323 2139.62 569.96 19 .65TOE 0.90 14322 2140.53 569.88 20 .72 2.05 14321 2142.58 569.88 21 .72 2.69 14320 2145.27 569.96 22 .65 2.13 14319 2147.40 570.03 23 .55 2.48 14318 2149.88 570.14 24 .49 4.87 14317 2154.75 570.25 25 .42 5.13 14316 2159.88 570.27 26 .4 3.44 14315 2163.32 570.39 27 .25 0.48 14314 2163.79 570.63 28 WL RB 0.92 14313 2164.71 570.78 29 BP 0.33 14312 2165.04 571.10 30 NB 1.13 14311 2166.17 571.46 31 BP 0.48 14310 2166.65 572.02 32 TOP-BANK 1.89 14309 2168.53 572.12 33 FENCE 0.52 14308 2169.05 572.07 34 GL BOLT RB 2.33 14307 2171.38 571.87 35 BP 6.99 14306 2178.38 572.01 36 P 11.84 14305 2190.22 572.64 37 P 16.90 14304 2207.12 572.78 38 P 17.65 14303 2224.77 572.60 39 P 13.97 14302 2238.74 572.37 40 TOE 3.76 14301 2242.50 574.36 41 TOP-FENCE 11.50 14300 2254.00 574.77 42 FLAT75-100M JOIN 341-300 NORTH 2253.998 END NAVER CREEK X/S 15 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15350 0.00 577.36 1 DUMMY 2000.00 15349 2000.00 577.36 2 EDGE-HWY-INT 14.66 15348 2014.66 577.19 3 TOP-E 3.99 15347 2018.65 575.86 4 TOE-HWY 19.92 15346 2038.58 575.84 5 BP 19.89 15345 2058.47 575.63 6 CL-BEYOND 18.43 15344 2076.89 575.13 7 BP 2.32 15343 2079.21 575.45 8 GL BOLT LB 7.03 15342 2086.25 572.91 9 BP 2.11 15341 2088.35 572.25 10 BP 3.69 15340 2092.05 571.43 11 TOE 6.40 15339 2098.45 572.56 12 BP 5.07 15338 2103.52 573.13 13 TOP 0.92 15337 2104.44 572.16 14 SCOUR 2.50 15336 2106.93 571.27 15 WL LB 1.93 15335 2108.87 570.64 16 .64 0.70 15334 2109.56 570.41 17 .86 0.67 15333 2110.23 569.97 18 1.3 5.59 15332 2115.82 570.36 19 .95 1.46 15331 2117.28 570.61 20 .68 3.31 15330 2120.59 570.93 21 .39 4.79 15329 2125.38 571.32 22 WL RB 5.87 15328 2131.25 571.41 23 TOE 2.09 15327 2133.34 572.08 24 TOP 7.85 15326 2141.19 572.16 25 BP 3.26 15325 2144.45 572.57 26 TOE-WB 2.58 15324 2147.03 573.92 27 TOP RB 1.61 15323 2148.64 574.10 28 BP 2.20 15322 2150.84 573.97 29 FELCE-LINE 0.69 15321 2151.53 574.03 30 GL BOLT RB 4.35 15320 2155.88 574.64 31 BP 5.91 15319 2161.79 574.67 32 BP 6.59 15318 2168.39 574.54 33 BP 7.48 15317 2175.87 574.15 34 BP 17.52 15316 2193.39 574.71 35 BP 7.57 15315 2200.96 574.37 36 BP 9.10 15314 2210.06 573.76 37 TOE 2.53 15313 2212.59 574.85 38 TOP 3.69 15312 2216.28 574.85 39 BP 1.20 15311 2217.48 575.14 40 BP 6.70 15310 2224.18 575.32 41 BP 2.15 15309 2226.33 574.83 42 BP 10.86 15308 2237.19 574.37 43 BP 2.37 15307 2239.56 573.86 44 BP 3.11 15306 2242.67 574.25 45 BP 4.95 15305 2247.62 574.31 46 BP 8.64 15304 2256.25 573.70 47 TOE 1.80 15303 2258.05 574.55 48 BP 4.59 15302 2262.64 574.75 49 BP 5.61 15301 2268.25 574.42 50 TOE.SL 2.27 15300 2270.52 576.12 51 ON-SLOPE JOIN 350-300 NORTH 2270.519 END NAVER CREEK X/S 16 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 16338 0.00 578.56 1 DUMMY 2000.00 16337 2000.00 578.56 2 EDGE-BEYOND-FLAT 7.22 16336 2007.22 578.55 3 EDGE-BEYOND 4.48 16335 2011.70 578.12 4 BP 6.31 16334 2018.01 577.84 5 BP 11.41 16333 2029.42 577.02 6 TOP-CUT 4.96 16332 2034.39 573.38 7 TOE 8.69 16331 2043.07 573.76 8 BP 8.12 16330 2051.19 573.30 9 BP 12.69 16329 2063.88 573.19 10 GL BOLT LB 2.17 16328 2066.06 573.33 11 TOE 0.80 16327 2066.86 573.66 12 TOP 6.16 16326 2073.02 573.78 13 BP 9.65 16325 2082.67 573.83 14 CL-BEYOND 11.67 16324 2094.34 574.05 15 BP 11.48 16323 2105.81 574.13 16 BP 13.91 16322 2119.72 573.84 17 BP 7.25 16321 2126.98 573.84 18 TOP 3.38 16320 2130.35 573.58 19 TOP 2.45 16319 2132.80 573.13 20 NB 2.49 16318 2135.29 572.87 21 BP 5.12 16317 2140.41 572.76 22 BP 4.83 16316 2145.24 572.61 23 WL LB 4.11 16315 2149.35 572.42 24 .19 5.09 16314 2154.44 572.28 25 .33 2.93 16313 2157.37 572.23 26 .4 3.41 16312 2160.77 572.15 27 .47 1.62 16311 2162.40 572.01 28 .6 2.19 16310 2164.59 571.78 29 .93 1.90 16309 2166.49 571.74 30 .93 0.99 16308 2167.48 571.89 31 .78 1.31 16307 2168.78 572.10 32 .5 1.67 16306 2170.46 572.59 33 WL RB 1.33 16305 2171.78 573.13 34 TOE-CUT 0.38 16304 2172.16 576.62 35 TOP-CUT-BANK 2.69 16303 2174.86 577.20 36 FENCE 0.92 16302 2175.78 577.37 37 GL BOLT RB 3.73 16301 2179.51 578.00 38 BP 5.55 16300 2185.05 578.90 39 TOE FAST RISE JOIN 338-300 NORTH 2185.053 END NAVER CREEK X/S 17 PROJ 88RPP-11 MAY 27 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 17332 0.00 580.92 1 DUMMY 2000.00 17331 2000.00 580.92 2 SLOW RISE 9.47 17330 2009.47 580.46 3 TOP 13.70 17329 2023.17 578.78 4 TOP 5.34 17328 2028.51 575.96 5 TOE 7.59 17327 2036.10 576.05 6 EDGE-BEYOND 6.81 17326 2042.91 576.13 7 EDGE-BEYOND 23.74 17325 2066.65 576.19 8 BP 13.42 17324 2080.06 576.05 9 GL BOLT LB 6.82 17323 2086.88 575.86 10 TOP-FENCE 2.60 17322 2089.48 574.40 11 TOP 0.65 17321 2090.13 573.70 12 NWB 0.67 17320 2090.80 573.08 13 WL LB 0.61 17319 2091.42 572.69 14 .4 1.67 17318 2093.09 572.59 15 .5 2.40 17317 2095.49 572.57 16 .55 2.94 17316 2098.43 572.50 17 .6 1.75 17315 2100.17 572.51 18 .65 3.50 17314 2103.67 572.55 19 .59 3.84 17313 2107.51 572.52 20 .61 4.21 17312 2111.72 572.76 21 .38 1.43 17311 2113.15 573.12 22 WL RB 2.18 17310 2115.32 573.86 23 NWB 1.14 17309 2116.47 574.23 24 TOP 4.23 17308 2120.69 574.43 25 BP 4.73 17307 2125.43 574.68 26 BP 2.48 17306 2127.91 574.40 27 BP 4.03 17305 2131.94 574.58 28 GL BOLT RB 15.15 17304 2147.08 574.51 29 BP 14.10 17303 2161.19 574.28 30 BP 12.91 17302 2174.10 575.53 31 TOE-SL 11.52 17301 2185.62 577.71 32 ON-SL 7.69 17300 2193.31 580.28 33 ON-SL JOIN 332-300 NORTH 2193.312 END NAVER CREEK X/S 18 PROJ 88-RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 18335 0.00 579.66 1 DUMMY 2000.00 18334 2000.00 579.66 2 FLAT 2.66 18333 2002.66 579.24 3 TOP-BANK 3.54 18332 2006.20 576.20 4 TOE-BANK 2.23 18331 2008.43 575.83 5 TOP 0.83 18330 2009.27 575.49 6 CL-DITCH 1.25 18329 2010.51 575.98 7 EDGE-BEYOND 7.83 18328 2018.35 576.10 8 EDGE-BEYOND 11.58 18327 2029.93 576.26 9 EDGE-DRIVEWAY 26.39 18326 2056.31 576.00 10 DR-HOUSE 18.56 18325 2074.87 576.21 11 LAWN 12.63 18324 2087.50 575.99 12 GL BOLT LB 1.32 18323 2088.82 575.76 13 TOP 0.99 18322 2089.81 575.10 14 TOE 1.85 18321 2091.67 574.82 15 HWL-RESIDENT 1.43 18320 2093.10 574.63 16 NB 1.38 18319 2094.48 574.72 17 BP 2.33 18318 2096.81 574.32 18 TOP 0.30 18317 2097.11 573.98 19 WL LB 0.36 18316 2097.47 573.55 20 .44TOE 2.99 18315 2100.46 573.65 21 .35 6.71 18314 2107.17 573.58 22 .42 4.86 18313 2112.04 573.53 23 .5 5.08 18312 2117.11 573.46 24 .59 4.63 18311 2121.74 573.48 25 .58 1.97 18310 2123.71 573.76 26 .28UNDERCUT-B 0.25 18309 2123.96 575.50 27 BP 0.57 18308 2124.53 575.74 28 TOP-RB 2.75 18307 2127.29 575.81 29 TOE 1.61 18306 2128.90 577.17 30 TOP 0.47 18305 2129.37 577.22 31 GL BOLT RB 5.30 18304 2134.68 577.41 32 BP 10.00 18303 2144.67 577.59 33 BP 10.31 18302 2154.98 577.89 34 BP 6.32 18301 2161.30 577.77 35 TOE-SLOPE 4.73 18300 2166.04 580.10 36 ON-SLOPE JOIN 335-300 NORTH 2166.036 END NAVER CREEK X/S 19 PROJ 88RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 19334 0.00 579.78 1 DUMMY 2000.00 19333 2000.00 579.78 2 CL-BEYOND-FLAT 21.06 19332 2021.06 578.95 3 TOP 11.00 19331 2032.06 577.22 4 ON-5L 9.33 19330 2041.39 576.60 5 FENCE-CORNER 7.49 19329 2048.88 576.60 6 EDGE-BEYOND 5.24 19328 2054.11 576.69 7 EDGE-BEYOND 6.62 19327 2060.73 576.61 8 GL BOLT LB 1.16 19326 2061.89 576.62 9 FENCE-L 16.49 19325 2078.38 576.97 10 FENCE-L 17.61 19324 2095.99 577.12 11 BP 14.21 19323 2110.20 577.00 12 BP 5.51 19322 2115.71 577.18 13 GL BOLT LB 6.76 19321 2122.48 576.44 14 BP 9.45 19320 2131.93 575.92 15 BP 9.57 19319 2141.50 576.02 16 BP 15.88 19318 2157.38 575.80 17 BP 8.25 19317 2165.63 575.95 18 BP 3.55 19316 2169.19 575.65 19 BP 9.59 19315 2178.78 575.44 20 NAWB 1.36 19314 2180.13 575.42 21 BP 2.12 19313 2182.26 575.16 22 TOP-BANK 0.90 19312 2183.16 574.66 23 WL LB 1.04 19311 2184.20 574.36 24 .33 1.54 19310 2185.74 574.04 25 .66TOE 3.33 19309 2189.07 573.98 26 .76 2.10 19308 2191.17 573.92 27 .78 2.67 19307 2193.83 573.92 28 .78 2.08 19306 2195.91 574.04 29 .66 3.39 19305 2199.30 574.35 30 .34 3.13 19304 2202.43 574.67 31 WL RB 2.46 19303 2204.88 574.74 32 BP 3.35 19302 2208.23 575.12 33 TRASH-LINE 2.63 19301 2210.86 575.48 34 TOE 3.22 19300 2214.08 578.05 35 ON-5L JOIN 334-300 NORTH 2214.077 END NAVER CREEK X/S 20 PROJ 88 RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 20352 0.00 585.25 1 DUMMY 2000.00 20351 2000.00 585.25 2 ON-SLOPE-RISING 6.21 20350 2006.21 583.30 3 TOE-SLOPE 14.44 20349 2020.65 582.25 4 TOP-BANK 1.49 20348 2022.15 581.61 5 CL-DITCH 3.67 20347 2025.82 583.24 6 TOP-HWY 12.92 20346 2038.74 583.76 7 TOP- 5.67 20345 2044.40 581.00 8 TOE-HWY 16.64 20344 2061.04 580.19 9 FENCE 28.36 20343 2089.40 579.58 10 FENCE 5.66 20342 2095.06 579.56 11 CL-BEYOND 15.59 20341 2110.66 579.46 12 PAVEMENT 24.72 20340 2135.37 578.95 13 GL BOLT LB 16.73 20339 2152.10 578.87 14 BP 15.27 20338 2167.38 578.52 15 TOE 1.65 20337 2169.03 578.96 16 TOP-FILL 2.17 20336 2171.20 577.62 17 ONSL 4.41 20335 2175.60 575.16 18 .47TOE 1.50 20334 2177.10 575.23 19 .4 1.72 20333 2178.82 575.41 20 BP.2 2.06 20332 2180.88 575.79 21 BP 4.63 20331 2185.52 575.87 22 BP 7.62 20330 2193.14 576.19 23 TOE-OLD-CHANNEL 2.58 20329 2195.72 576.86 24 TOP-OLD-CHANNEL 5.37 20328 2201.09 576.87 25 BP 3.72 20327 2204.81 577.63 26 BP 4.45 20326 2209.26 577.32 27 TOE 1.62 20325 2210.88 578.01 28 TOP-CHANNEL 1.99 20324 2212.87 576.92 29 BP 0.02 20323 2212.89 576.47 30 SCOUR-LINE 0.49 20322 2213.38 576.32 31 BP 0.43 20321 2213.81 575.77 32 WL LB 0.90 20320 2214.71 575.35 33 .44 1.19 20319 2215.90 574.98 34 .8TOE 1.10 20318 2217.00 575.04 35 .75 1.10 20317 2218.09 574.86 36 .94 1.42 20316 2219.51 574.97 37 .8 1.82 20315 2221.33 574.68 38 1.1 6.48 20314 2227.80 574.75 39 1.07 0.79 20313 2228.60 574.82 40 1.02 3.00 20312 2231.60 575.13 41 .7 2.12 20311 2233.72 575.81 42 WL RB 0.72 20310 2234.44 576.53 43 NB-TOE 0.54 20309 2234.97 577.99 44 TOP-CUT 2.33 20308 2237.30 578.05 45 BP 1.77 20307 2239.07 578.38 46 GL BOLT RB 2.79 20306 2241.86 577.36 47 TOE 6.10 20305 2247.96 577.29 48 BP 5.11 20304 2253.07 577.94 49 TOP 2.28 20303 2255.35 576.38 50 TOE 4.91 20302 2260.26 576.46 51 BP 3.62 20301 2263.88 577.09 52 TOE 3.09 20300 2266.96 579.75 53 ON-SL JOIN 352-300 NORTH 2266.963 END NAVER CREEK X/S 21 PROJ 88 RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 21345 0.00 579.36 1 DUMMY 2000.00 21344 2000.00 579.36 2 FIELD 10.89 21343 2010.89 579.17 3 TOP @ CONCESSION 1.06 21342 2011.95 578.55 4 TOE 5.88 21341 2017.84 578.13 5 BP 10.39 21340 2028.22 578.00 6 CL-BEYOND 2.82 21339 2031.04 577.94 7 GL BOLT LB 9.33 21338 2040.37 577.98 8 BP 12.05 21337 2052.42 577.94 9 BP 7.99 21336 2060.41 578.08 10 BP 8.51 21335 2068.92 578.06 11 TOP 2.53 21334 2071.44 577.51 12 CL 2.29 21333 2073.73 578.10 13 TOP-OLD CHANNEL 4.82 21332 2078.55 578.06 14 BP 11.79 21331 2090.34 577.78 15 BP 11.83 21330 2102.17 577.23 16 TOP-OLD CHANNEL 1.60 21329 2103.77 576.79 17 TOE 2.19 21328 2105.96 576.99 18 TOE 1.26 21327 2107.23 577.61 19 TOP-OLD-CHANNEL 7.24 21326 2114.46 577.29 20 BP 2.50 21325 2116.97 577.58 21 BP 12.59 21324 2129.56 577.33 22 BP 15.87 21323 2145.42 577.56 23 BP 13.46 21322 2158.88 577.46 24 BP 9.91 21321 2168.79 577.49 25 BP 1.31 21320 2170.10 577.24 26 BP 1.59 21319 2171.70 577.64 27 BP 2.32 21318 2174.01 577.63 28 TOP-BANK 0.20 21317 2174.21 577.30 29 NB 1.30 21316 2175.51 577.02 30 TOE 8.40 21315 2183.91 576.65 31 BP 9.20 21314 2193.11 576.90 32 TOP-BAR 0.75 21313 2193.86 576.59 33 BP 2.59 21312 2196.45 576.29 34 WL LB 1.87 21311 2198.33 575.98 35 .3 2.07 21310 2200.40 575.91 36 .4 1.78 21309 2202.18 575.54 37 .84 0.69 21308 2202.87 575.56 38 .88 8.02 21307 2210.89 575.96 39 .52CLAY-BOTTOM 1.85 21306 2212.74 575.89 40 .6 1.36 21305 2214.10 576.48 41 WL RB 1.41 21304 2215.51 577.24 42 BP 0.82 21303 2216.33 579.50 43 TOP-CUT 5.57 21302 2221.90 579.64 44 GL BOLT LB 3.66 21301 2225.56 580.26 45 TOE-SL 1.97 21300 2227.54 581.45 46 ONSL JOIN 345-300 NORTH 2227.536 END NAVER CREEK X/S 22 PROJ 88 RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 22367 0.00 585.16 1 DUMMY 2000.00 22366 2000.00 585.16 2 ON-SLOPE 5.94 22365 2005.94 582.54 3 DITCH 2.75 22364 2008.69 583.34 4 EDGE-HWY 14.31 22363 2023.00 583.93 5 TOP 8.63 22362 2031.62 580.45 6 TOE-HWY 4.15 22361 2035.78 580.27 7 TOP 3.14 22360 2038.91 579.33 8 TOE 21.86 22359 2060.77 579.26 9 FENCE 29.95 22358 2090.72 579.54 10 FIELD 16.53 22357 2107.25 579.59 11 GL BOLT LB 4.65 22356 2111.90 579.51 12 BP 2.97 22355 2114.86 579.63 13 TOP 1.26 22354 2116.12 578.59 14 TOE 5.51 22353 2121.63 578.65 15 BP 4.63 22352 2126.26 578.61 16 BP 7.94 22351 2134.20 578.79 17 TOP-BANK 1.80 22350 2136.01 578.24 18 NB 2.36 22349 2138.36 577.39 19 TOE 6.79 22348 2145.16 577.89 20 TOP-BAR 3.44 22347 2148.60 577.48 21 .15 2.14 22346 2150.73 577.45 22 .15 5.03 22345 2155.76 577.83 23 BP 6.95 22344 2162.71 578.11 24 TOP-BAR 3.10 22343 2165.81 577.72 25 WL LB 3.89 22342 2169.71 577.29 26 .48 2.11 22341 2171.82 577.11 27 .6 4.46 22340 2176.28 577.19 28 .6 2.43 22339 2178.70 577.23 29 .55 3.18 22338 2181.88 577.32 30 .44 3.05 22337 2184.94 577.70 31 .07 1.60 22336 2186.53 577.76 32 WL RB 3.12 22335 2189.66 578.13 33 BAR 7.23 22334 2196.89 578.08 34 BP 5.77 22333 2202.66 578.68 35 BP 4.43 22332 2207.09 578.58 36 BAR 6.84 22331 2213.93 578.46 37 TOP-BAR 3.65 22330 2217.58 577.96 38 GRASS-L 2.91 22329 2220.49 577.66 39 .11 2.39 22328 2222.88 577.60 40 .15 1.19 22327 2224.08 577.95 41 BP 3.09 22326 2227.16 577.83 42 BP 1.14 22325 2228.31 578.09 43 BAR 5.98 22324 2234.28 578.19 44 BAR 4.91 22323 2239.19 578.26 45 TOP-BAR 3.14 22322 2242.32 577.81 46 TOE 1.31 22321 2243.63 577.73 47 TOE 1.30 22320 2244.93 578.46 48 TOP 6.27 22319 2251.20 578.40 49 BP 5.36 22318 2256.56 578.62 50 GL BOLT RB 8.89 22317 2265.45 578.72 51 BP 4.92 22316 2270.37 578.69 52 TOP 0.99 22315 2271.37 578.10 53 TOE 2.08 22314 2273.44 577.92 54 CL 1.40 22313 2274.84 577.97 55 TOE 1.25 22312 2276.09 578.50 56 TOP 2.71 22311 2278.80 578.73 57 BP 1.09 22310 2279.89 579.10 58 BP 2.71 22309 2282.60 579.07 59 BP 3.13 22308 2285.73 578.57 60 TOP 0.73 22307 2286.46 578.01 61 TOE 1.92 22306 2288.39 577.75 62 CL 1.34 22305 2289.73 577.92 63 TOE 0.60 22304 2290.33 578.61 64 TOP-SLOUGH 7.95 22303 2298.27 579.18 65 BP 7.14 22302 2305.41 579.29 66 BP 11.59 22301 2317.00 579.23 67 BP 11.49 22300 2328.50 579.45 68 GL BOLT JOIN 367-300 NORTH 2328.500 END NAVER CREEK X/S 23 PROJ 88 RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 23391 0.00 580.35 1 DUMMY 2000.00 23390 2000.00 580.35 2 COMM.PT.. 8.56 23389 2008.56 580.68 3 BP 9.36 23388 2017.92 580.56 4 BP 7.39 23387 2025.31 580.45 5 BP 7.36 23386 2032.68 580.43 6 TOE SLOPE 4.64 23385 2037.32 580.72 7 BP 1.48 23384 2038.80 581.52 8 BP 2.75 23383 2041.56 581.68 9 BP 3.05 23382 2044.60 580.54 10 BP 5.71 23381 2050.31 580.55 11 BP 9.07 23380 2059.38 580.54 12 BP 3.56 23379 2062.93 580.33 13 GL BOLT LB 2.62 23378 2065.55 579.72 14 CH 1.90 23377 2067.45 579.96 15 BP 2.06 23376 2069.51 579.74 16 BP 3.91 23375 2073.42 580.08 17 BP 7.10 23374 2080.52 580.10 18 TOP-CHANNEL 0.94 23373 2081.46 579.79 19 TOE-CHANNEL 2.81 23372 2084.27 579.57 20 TOE-CHANNEL 0.79 23371 2085.07 579.99 21 TOP-CHANNEL 2.80 23370 2087.86 580.08 22 BP 10.77 23369 2098.63 580.04 23 BP 10.77 23368 2109.40 579.97 24 BP 6.55 23367 2115.94 579.41 25 TOE.CHANNEL 2.98 23366 2118.92 579.61 26 EDGE 7.39 23365 2126.32 579.87 27 TOP 1.07 23364 2127.39 578.99 28 TOE.CHANNEL 3.27 23363 2130.66 579.13 29 TOE.CHANNEL 0.71 23362 2131.37 579.73 30 BP 5.50 23361 2136.87 579.92 31 TOP 0.86 23360 2137.72 579.11 32 NB 1.29 23359 2139.02 578.51 33 TOE 5.94 23358 2144.95 578.82 34 TOP-BAR 4.87 23357 2149.83 578.83 35 TOP-BAR 1.55 23356 2151.37 578.68 36 WL LB 2.53 23355 2153.91 578.36 37 .32 2.46 23354 2156.36 578.25 38 .44 3.47 23353 2159.83 578.11 39 .59 3.61 23352 2163.44 578.11 40 .58 2.88 23351 2166.32 578.15 41 .58 3.59 23350 2169.91 578.23 42 .48 2.37 23349 2172.29 578.58 43 .12 4.02 23348 2176.31 578.50 44 .17 2.25 23347 2178.55 577.99 45 .57 2.97 23346 2181.52 577.82 46 .74 2.21 23345 2183.73 577.47 47 1.1 0.75 23344 2184.47 577.94 48 .63 0.42 23343 2184.89 578.62 49 BP 1.92 23342 2186.81 579.28 50 TOP RB 6.21 23341 2193.02 579.06 51 BP 0.94 23340 2193.96 578.63 52 BP 1.88 23339 2195.84 578.31 53 BP 5.03 23338 2200.87 579.06 54 TOE 1.37 23337 2202.23 579.73 55 TOP 2.19 23336 2204.43 579.79 56 BP 3.20 23335 2207.63 580.09 57 TOP 1.43 23334 2209.05 579.75 58 TOE 1.98 23333 2211.03 579.67 59 BP 5.99 23332 2217.03 579.76 60 BP 6.27 23331 2223.29 579.60 61 BP 1.69 23330 2224.98 579.22 62 BP 1.06 23329 2226.04 579.30 63 BP 2.31 23328 2228.35 579.77 64 BP 7.43 23327 2235.77 579.71 65 BP 12.16 23326 2247.93 579.54 66 BP 1.70 23325 2249.63 579.12 67 BP 1.14 23324 2250.77 579.44 68 BP 7.64 23323 2258.41 579.47 69 BP 11.30 23322 2269.71 579.44 70 GL BOLT RB 0.16 23321 2269.87 579.44 71 BP 3.15 23320 2273.01 579.24 72 BP 2.31 23319 2275.33 578.82 73 BP 4.30 23318 2279.63 578.54 74 BP 3.52 23317 2283.15 578.44 75 .11 3.81 23316 2286.96 578.26 76 .28 4.02 23315 2290.98 578.06 77 .5 2.88 23314 2293.86 577.49 78 1.06 1.62 23313 2295.47 578.54 79 WL-SLOUGH 2.11 23312 2297.58 579.00 80 BP 2.66 23311 2300.24 579.29 81 BP 3.71 23310 2303.95 579.35 82 BP 3.92 23309 2307.87 579.84 83 TOP 1.19 23308 2309.06 579.21 84 TOE 3.33 23307 2312.39 579.19 85 LOG 4.58 23306 2316.98 578.99 86 BP 7.70 23305 2324.68 579.29 87 TOE 2.08 23304 2326.76 579.95 88 TOP 5.52 23303 2332.28 580.11 89 BP 6.78 23302 2339.05 579.58 90 BP 4.00 23301 2343.06 579.87 91 BP 3.29 23300 2346.35 580.41 92 FLAT JOIN 391-300 NORTH 2346.350 END NAVER CREEK X/S 24 PROJ 88 RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 24406 0.00 586.27 1 DUMMY 2000.00 24405 2000.00 586.27 2 SLOW-RISE 4.56 24404 2004.56 586.51 3 ON-SLOPE 7.49 24403 2012.04 582.62 4 CL-DIT 1.72 24402 2013.77 583.42 5 TOP-EDGE-HWY 13.53 24401 2027.30 583.53 6 TOP-EDGE 5.49 24400 2032.79 580.78 7 SPIKE LB 8.06 24399 2040.86 580.55 8 BP 7.74 24398 2048.60 580.28 9 BP 10.61 24397 2059.21 580.41 10 BP 6.36 24396 2065.57 580.53 11 BP 7.80 24395 2073.38 580.37 12 TOP 7.40 24394 2080.77 580.31 13 TOP 7.36 24393 2088.13 579.95 14 WL 6.29 24392 2094.42 579.18 15 .6 2.43 24391 2096.85 579.48 16 .5 3.17 24390 2100.02 579.99 17 WL-P 3.06 24389 2103.09 580.39 18 TOP 7.16 24388 2110.25 580.26 19 TOP 7.01 24387 2117.26 580.05 20 BP 4.81 24386 2122.07 580.00 21 SW-L 2.72 24385 2124.79 579.87 22 .15 3.64 24384 2128.43 579.76 23 .25 3.45 24383 2131.88 579.66 24 .35 1.89 24382 2133.78 579.56 25 .45 3.56 24381 2137.34 579.93 26 TOE-SSW 7.38 24380 2144.71 580.99 27 TOP 5.48 24379 2150.19 580.72 28 TOE 6.44 24378 2156.63 581.88 29 TOP 7.84 24377 2164.47 581.25 30 BP 0.81 24376 2165.28 581.61 31 BP 8.73 24375 2174.01 581.61 32 BP 6.71 24374 2180.72 581.48 33 TOP 1.63 24373 2182.35 580.14 34 TOE 12.04 24372 2194.39 580.28 35 BP 7.09 24371 2201.48 580.00 36 TOP-BANK 1.38 24370 2202.87 579.18 37 WL LB 1.40 24369 2204.27 578.52 38 .7TOE 2.14 24368 2206.42 578.40 39 .8 1.13 24367 2207.55 578.47 40 .8 1.49 24366 2209.04 578.58 41 .6 0.13 24365 2209.17 578.59 42 .6 2.11 24364 2211.28 579.16 43 WL 1.28 24363 2212.56 579.52 44 TOP 7.30 24362 2219.87 579.41 45 TOP 2.87 24361 2222.74 579.23 46 TOP 1.10 24360 2223.84 579.01 47 .10 2.91 24359 2226.74 579.19 48 TOP 2.01 24358 2228.76 578.85 49 .3 1.28 24357 2230.04 579.00 50 TOE 1.90 24356 2231.93 579.83 51 TOP 4.46 24355 2236.40 579.51 52 BP 7.25 24354 2243.65 580.02 53 TOP-BAR 6.49 24353 2250.13 579.99 54 TOP-BAR 5.52 24352 2255.65 579.64 55 BP 3.75 24351 2259.40 579.38 56 BP 4.94 24350 2264.34 579.74 57 BP 4.92 24349 2269.26 579.66 58 BP 6.43 24348 2275.69 579.89 59 BP 3.12 24347 2278.81 580.23 60 TOP 2.70 24346 2281.51 579.20 61 TOE 4.64 24345 2286.16 579.25 62 BP 4.84 24344 2291.00 579.41 63 TOP-BAR 2.39 24343 2293.39 579.12 64 WL 2.21 24342 2295.60 578.84 65 .3 1.45 24341 2297.04 578.82 66 .3 2.15 24340 2299.20 578.74 67 .4 2.76 24339 2301.96 578.70 68 .4 2.63 24338 2304.59 578.65 69 .5 2.85 24337 2307.44 578.83 70 .28 1.74 24336 2309.18 578.84 71 .3 2.69 24335 2311.86 578.62 72 .5 1.03 24334 2312.90 578.47 73 .65 1.63 24333 2314.52 578.34 74 . 0.46 24332 2314.99 578.46 75 .64 1.74 24331 2316.72 578.88 76 .2 0.12 24330 2316.85 579.12 77 WL RB 0.78 24329 2317.62 579.78 78 TOP 3.20 24328 2320.82 579.85 79 BP 3.55 24327 2324.37 580.29 80 GL BOLT RB 5.91 24326 2330.29 580.40 81 BP 7.78 24325 2338.06 580.94 82 BP 0.09 24324 2338.16 580.86 83 BP 5.40 24323 2343.56 580.44 84 BP 1.76 24322 2345.32 580.00 85 BP 1.81 24321 2347.13 579.87 86 BP 2.39 24320 2349.51 580.53 87 BP 3.83 24319 2353.34 580.84 88 BP 8.94 24318 2362.28 581.04 89 BP 3.14 24317 2365.42 580.31 90 BP 4.09 24316 2369.52 580.54 91 BP 0.03 24315 2369.54 580.55 92 BP 1.75 24314 2371.30 580.23 93 BP 6.86 24313 2378.16 580.38 94 BP 7.08 24312 2385.24 580.01 95 BP 1.49 24311 2386.73 580.44 96 BP 2.16 24310 2388.89 580.35 97 .58 2.11 24309 2391.00 579.97 98 1.05 2.73 24308 2393.72 579.84 99 1.02 3.21 24307 2396.93 579.91 100 1.02 2.95 24306 2399.88 580.15 101 .78 6.62 24305 2406.51 580.11 102 .82 4.58 24304 2411.08 580.32 103 .68 5.38 24303 2416.46 580.47 104 .46 3.23 24302 2419.69 580.28 105 .64 3.12 24301 2422.81 580.90 106 TOE-WL 2.91 24300 2425.72 582.83 107 ON-SL JOIN 406-300 NORTH 2425.724 END NAVER CREEK X/S 25 PROJ 88 RPP-11 MAY 28 1988 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 25360 0.00 590.99 1 DUMMY 2000.00 25359 2000.00 590.99 2 FLAT-BEYOND 3.84 25358 2003.84 590.24 3 TOP BANK 4.09 25357 2007.93 586.39 4 BP 4.95 25356 2012.87 583.13 5 DITCH 1.74 25355 2014.62 583.79 6 TOP 3.30 25354 2017.92 584.06 7 EDGE-PAVEMENT 9.38 25353 2027.30 584.33 8 EDGE-PAVEMENT 4.19 25352 2031.49 583.89 9 GL BOLT LB 5.69 25351 2037.18 581.20 10 TOE HWY 6.45 25350 2043.63 581.51 11 TOE 4.02 25349 2047.65 581.62 12 HWL 2.49 25348 2050.14 581.43 13 TOP 0.78 25347 2050.92 581.04 14 WL LB 0.51 25346 2051.43 580.68 15 .42 1.15 25345 2052.58 580.57 16 .5 2.29 25344 2054.87 580.53 17 .58 1.87 25343 2056.74 580.54 18 .5 1.70 25342 2058.43 580.64 19 .4 4.41 25341 2062.84 580.70 20 .35 4.54 25340 2067.38 580.73 21 .35 4.83 25339 2072.21 580.75 22 .3 4.93 25338 2077.14 580.68 23 .4 5.14 25337 2082.28 580.68 24 .38 4.57 25336 2086.85 580.73 25 .34 3.24 25335 2090.09 581.02 26 WL RB 4.43 25334 2094.53 581.51 27 TOP 12.18 25333 2106.70 581.68 28 BP 18.72 25332 2125.43 581.62 29 BP 15.34 25331 2140.77 581.46 30 TOP-BAR 10.30 25330 2151.07 581.16 31 BP 4.56 25329 2155.62 581.40 32 BP 11.19 25328 2166.81 581.27 33 BP 10.63 25327 2177.44 581.33 34 BP 10.19 25326 2187.63 581.37 35 BP 9.76 25325 2197.38 581.36 36 BP 7.93 25324 2205.31 581.26 37 BP 10.95 25323 2216.26 581.25 38 BP 12.78 25322 2229.05 580.99 39 TOP-CHANNEL 1.09 25321 2230.14 580.67 40 TOE.25 1.33 25320 2231.47 580.62 41 TOE.3 2.09 25319 2233.56 581.55 42 TOP-CH 11.35 25318 2244.91 581.52 43 GL BOLT RB 3.38 25317 2248.29 581.56 44 TOP 6.64 25316 2254.93 581.31 45 BP 7.08 25315 2262.01 580.99 46 SW 2.07 25314 2264.08 581.39 47 BP 7.23 25313 2271.31 581.33 48 BP 9.74 25312 2281.05 581.35 49 BP 8.34 25311 2289.39 581.07 50 BP 9.16 25310 2298.55 581.43 51 TOP 2.27 25309 2300.82 581.10 52 TOE 11.92 25308 2312.74 581.36 53 TOP 3.96 25307 2316.71 581.08 54 WL 1.96 25306 2318.67 580.76 55 .36 1.56 25305 2320.23 580.54 56 .57 1.86 25304 2322.09 580.65 57 .48 1.66 25303 2323.75 580.61 58 .52 1.46 25302 2325.21 580.69 59 .45 1.61 25301 2326.82 581.07 60 WL-POND 4.54 25300 2331.36 582.79 61 ON-SL-TO-BENCH JOIN 360-300 NORTH 2331.361