THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. NECHAKO RIVER X/S 0 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1282 0.00 639.02 1 DUMMY 2000.00 1281 2000.00 639.02 2 TOE RISING BEYND 48.76 1280 2048.76 638.31 3 TOP 21.33 1279 2070.10 637.43 4 FLAT 53.34 1278 2123.44 637.03 5 . 50.29 1277 2173.73 637.03 6 . 51.21 1276 2224.94 636.55 7 . 60.35 1275 2285.29 636.49 8 . 58.22 1274 2343.50 637.48 9 . 37.50 1273 2381.01 636.66 10 . 71.32 1272 2452.32 637.09 11 . 25.00 1271 2477.32 637.42 12 POINT IN FIELD 39.01 1270 2516.33 637.36 13 FIELD 10.97 1269 2527.30 637.70 14 REBAR LB 1.22 1268 2528.52 637.73 15 TOP 1.23 1267 2529.75 636.55 16 . 0.64 1266 2530.38 635.61 17 . 2.47 1265 2532.85 634.75 18 H/W 0.65 1264 2533.50 633.81 19 . 1.53 1263 2535.03 633.07 20 W/L LB 3.03 1262 2538.06 632.05 21 . 3.05 1261 2541.11 631.05 22 . 3.05 1260 2544.16 630.55 23 . 3.05 1259 2547.21 630.45 24 . 3.05 1258 2550.25 630.55 25 . 3.05 1257 2553.30 630.55 26 . 3.05 1256 2556.35 630.55 27 . 3.05 1255 2559.40 630.55 28 . 3.05 1254 2562.45 630.65 29 . 3.05 1253 2565.49 630.75 30 . 3.05 1252 2568.54 630.85 31 . 3.05 1251 2571.59 630.75 32 . 3.05 1250 2574.64 630.75 33 . 3.05 1249 2577.69 630.75 34 . 3.05 1248 2580.73 630.65 35 . 3.05 1247 2583.78 630.65 36 . 3.05 1246 2586.83 630.65 37 . 3.05 1245 2589.88 631.15 38 . 3.05 1244 2592.93 631.45 39 . 3.05 1243 2595.97 631.65 40 . 3.05 1242 2599.02 631.55 41 . 3.05 1241 2602.07 631.35 42 . 3.05 1240 2605.12 631.25 43 . 3.05 1239 2608.17 631.35 44 . 3.05 1238 2611.21 631.45 45 . 3.05 1237 2614.26 631.45 46 . 3.05 1236 2617.31 631.65 47 . 3.05 1235 2620.36 631.75 48 . 3.05 1234 2623.41 631.95 49 . 3.05 1233 2626.45 631.85 50 . 3.05 1232 2629.50 631.55 51 . 3.05 1231 2632.55 631.85 52 . 3.05 1230 2635.60 631.95 53 . 3.05 1229 2638.65 632.15 54 . 3.05 1228 2641.69 632.25 55 . 3.05 1227 2644.74 632.15 56 . 3.05 1226 2647.79 632.35 57 . 3.05 1225 2650.84 632.18 58 . 3.05 1224 2653.89 632.32 59 . 3.05 1223 2656.93 632.35 60 . 3.05 1222 2659.98 632.42 61 . 3.05 1221 2663.03 632.47 62 . 3.05 1220 2666.08 632.41 63 . 3.05 1219 2669.13 632.21 64 . 3.05 1218 2672.17 631.95 65 . 3.05 1217 2675.22 632.45 66 . 3.05 1216 2678.27 631.45 67 . 3.05 1215 2681.32 631.95 68 . 3.05 1214 2684.37 631.65 69 . 3.05 1213 2687.41 631.15 70 . 3.05 1212 2690.46 630.87 71 . 3.05 1211 2693.51 631.30 72 . 3.05 1210 2696.56 631.80 73 . 3.05 1209 2699.61 633.15 74 W/L RB 4.55 1208 2704.16 634.27 75 . 5.82 1207 2709.97 635.53 76 . 5.04 1206 2715.01 636.07 77 TOP 4.96 1205 2719.97 635.74 78 TOE 5.47 1204 2725.45 638.44 79 BOLT RB 3.63 1203 2729.07 639.34 80 TOP R/W 3.35 1202 2732.42 639.46 81 TOP R/W 7.32 1201 2739.74 638.04 82 TOE 2.44 1200 2742.18 637.97 83 RISE BEYOND END NECHAKO RIVER X/S 1 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1099 0.00 639.49 1 DUMMY 2000.00 1100 2000.00 639.49 2 RISING BEYOND 5.73 1101 2005.73 638.87 3 . 4.02 1102 2009.75 638.63 4 TOP 2.71 1103 2012.46 637.42 5 TOE 4.45 1104 2016.90 637.20 6 . 8.10 1105 2025.00 636.37 7 . 9.38 1106 2034.39 636.10 8 BOLT LB 7.94 1107 2042.32 635.12 9 TOP 2.15 1108 2044.47 634.35 10 . 0.91 1109 2045.38 634.01 11 HIGH WATER MARK 1.77 1110 2047.15 633.34 12 W/L LB 3.05 1111 2050.20 633.25 13 . 3.05 1112 2053.24 631.49 14 . 3.05 1113 2056.29 631.04 15 . 3.05 1114 2059.34 629.94 16 . 3.05 1115 2062.39 629.34 17 . 3.05 1116 2065.44 628.84 18 . 3.05 1117 2068.48 628.34 19 . 3.05 1118 2071.53 627.94 20 . 3.05 1119 2074.58 627.64 21 . 3.05 1120 2077.63 627.34 22 . 3.05 1121 2080.68 627.14 23 . 3.05 1122 2083.72 627.54 24 . 3.05 1123 2086.77 627.54 25 . 3.05 1124 2089.82 627.44 26 . 4.88 1125 2094.70 627.44 27 . 1.22 1126 2095.92 627.34 28 . 3.05 1127 2098.96 627.34 29 . 3.05 1128 2102.01 627.54 30 . 3.05 1129 2105.06 628.14 31 . 3.05 1130 2108.11 628.74 32 . 3.05 1131 2111.16 629.24 33 . 3.05 1132 2114.20 629.14 34 . 3.05 1133 2117.25 629.34 35 . 3.05 1134 2120.30 629.64 36 . 3.05 1135 2123.35 630.14 37 . 3.05 1136 2126.40 630.54 38 . 3.05 1137 2129.44 630.94 39 . 3.05 1138 2132.49 631.04 40 . 3.05 1139 2135.54 631.04 41 . 3.05 1140 2138.59 631.14 42 . 3.05 1141 2141.64 631.24 43 . 3.05 1142 2144.68 631.74 44 . 3.05 1143 2147.73 632.14 45 . 3.05 1144 2150.78 632.24 46 . 3.05 1145 2153.83 632.14 47 . 3.05 1146 2156.88 632.19 48 . 3.05 1147 2159.92 632.47 49 . 3.05 1148 2162.97 633.24 50 . 3.41 1149 2166.38 633.36 51 W/L RB 4.87 1150 2171.26 634.41 52 TOE 0.00 1151 2171.26 635.14 53 HIGH WATER MARK 1.84 1152 2173.10 636.56 54 . 2.41 1153 2175.50 638.02 55 . 1.53 1154 2177.03 638.49 56 TOP BANK 3.05 1155 2180.08 638.58 57 REBAR XS-1 RB 7.01 1156 2187.08 637.86 58 NG 5.80 1157 2192.88 637.97 59 NG 4.57 1158 2197.45 638.23 60 . 7.01 1159 2204.46 638.23 61 EDGE BUSH 7.93 1160 2212.39 638.19 62 FIELD FLAT BEYON END NECHAKO RIVER X/S 2 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2169 0.00 637.32 1 DUMMY 2000.00 2168 2000.00 637.32 2 FIELD FLAT BEYON 15.24 2167 2015.24 637.19 3 TOP FL 12.22 2166 2027.46 636.37 4 C/L OLD CHANNEL 3.65 2165 2031.11 636.72 5 TOE 2.43 2164 2033.54 637.27 6 TOP 14.66 2163 2048.19 637.12 7 . 7.32 2162 2055.51 636.48 8 FLAT 10.99 2161 2066.50 636.13 9 . 9.13 2160 2075.63 636.66 10 FLAT 6.70 2159 2082.33 637.13 11 TOP 7.45 2158 2089.78 636.89 12 REBAR LB 2.94 2157 2092.72 636.23 13 TOE 3.65 2156 2096.37 636.11 14 TOP BANK 3.39 2155 2099.76 635.29 15 H/W 2.44 2154 2102.20 634.93 16 TOE 16.25 2153 2118.44 634.48 17 . 13.85 2152 2132.29 633.38 18 W/L LB 4.84 2151 2137.13 632.94 19 . 3.05 2150 2140.18 632.78 20 . 3.05 2149 2143.23 632.75 21 . 3.05 2148 2146.28 632.60 22 . 3.05 2147 2149.32 632.40 23 . 3.05 2146 2152.37 632.40 24 . 3.05 2145 2155.42 632.30 25 . 3.05 2144 2158.47 632.10 26 . 3.05 2143 2161.52 632.30 27 . 3.05 2142 2164.56 632.10 28 . 3.05 2141 2167.61 632.10 29 . 3.05 2140 2170.66 632.10 30 . 3.05 2139 2173.71 632.00 31 . 3.05 2138 2176.76 631.70 32 . 3.05 2137 2179.80 632.10 33 . 3.05 2136 2182.85 632.00 34 . 3.05 2135 2185.90 631.90 35 . 3.05 2134 2188.95 631.90 36 . 3.05 2133 2192.00 631.90 37 . 3.05 2132 2195.04 631.70 38 . 3.05 2131 2198.09 631.60 39 . 3.05 2130 2201.14 631.40 40 . 3.05 2129 2204.19 631.40 41 . 3.05 2128 2207.24 631.30 42 . 3.05 2127 2210.28 631.30 43 . 3.05 2126 2213.33 631.10 44 . 3.05 2125 2216.38 631.30 45 . 3.05 2124 2219.43 631.20 46 . 3.05 2123 2222.48 631.10 47 . 3.05 2122 2225.52 631.10 48 . 3.05 2121 2228.57 631.00 49 . 3.05 2120 2231.62 630.90 50 . 3.05 2119 2234.67 630.80 51 . 3.05 2118 2237.72 630.80 52 . 3.05 2117 2240.76 630.70 53 . 3.05 2116 2243.81 630.70 54 . 3.05 2115 2246.86 630.60 55 . 3.05 2114 2249.91 630.50 56 . 3.05 2113 2252.96 630.90 57 . 3.05 2112 2256.00 631.00 58 . 3.05 2111 2259.05 631.30 59 . 3.05 2110 2262.10 631.60 60 . 3.05 2109 2265.15 632.00 61 . 3.05 2108 2268.20 632.38 62 . 3.05 2107 2271.24 632.49 63 . 3.05 2106 2274.29 632.70 64 . 3.05 2105 2277.34 633.30 65 W/L RB 6.47 2104 2283.81 636.48 66 . 4.52 2103 2288.33 640.26 67 TOP STEEP BANK 1.25 2102 2289.58 640.19 68 BOLT RB 18.86 2101 2308.44 640.19 69 . 15.86 2100 2324.29 641.68 70 EDGE BUSH FLAT END NECHAKO RIVER X/S 3 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3160 0.00 637.18 1 DUMMY 2000.00 3159 2000.00 637.18 2 BUSHLINE 7.93 3158 2007.93 637.09 3 FLAT 9.14 3157 2017.07 636.97 4 FLAT 12.19 3156 2029.26 637.29 5 FLAT 8.54 3155 2037.80 637.08 6 FLAT 8.53 3154 2046.33 637.25 7 TOP 2.75 3153 2049.08 636.72 8 TOE 11.90 3152 2060.98 636.98 9 . 5.18 3151 2066.15 636.91 10 . 8.26 3150 2074.41 636.35 11 REBAR LB 2.44 3149 2076.85 635.66 12 HWM 2.77 3148 2079.62 634.95 13 TOE 7.65 3147 2087.28 634.45 14 . 5.82 3146 2093.10 634.00 15 . 1.57 3145 2094.67 633.38 16 W/L LB 5.79 3144 2100.46 632.59 17 . 3.05 3143 2103.51 632.34 18 . 3.05 3142 2106.56 631.84 19 . 3.05 3141 2109.60 631.44 20 . 3.05 3140 2112.65 631.34 21 . 3.05 3139 2115.70 631.34 22 . 3.05 3138 2118.75 631.14 23 . 3.05 3137 2121.80 631.04 24 . 3.05 3136 2124.84 631.04 25 . 3.05 3135 2127.89 631.04 26 . 3.05 3134 2130.94 630.84 27 . 3.05 3133 2133.99 630.64 28 . 3.05 3132 2137.04 630.44 29 . 3.05 3131 2140.08 630.74 30 . 3.05 3130 2143.13 630.74 31 . 3.05 3129 2146.18 630.54 32 . 3.05 3128 2149.23 630.54 33 . 3.05 3127 2152.28 630.64 34 . 3.05 3126 2155.32 630.54 35 . 3.05 3125 2158.37 630.34 36 . 3.05 3124 2161.42 630.04 37 . 3.05 3123 2164.47 630.24 38 . 3.05 3122 2167.52 630.04 39 . 3.05 3121 2170.56 630.04 40 . 3.05 3120 2173.61 629.74 41 . 3.05 3119 2176.66 629.44 42 . 3.05 3118 2179.71 629.34 43 . 3.05 3117 2182.76 629.24 44 . 3.05 3116 2185.80 629.14 45 . 3.05 3115 2188.85 629.24 46 . 3.05 3114 2191.90 629.74 47 . 3.05 3113 2194.95 630.44 48 . 3.05 3112 2198.00 630.99 49 . 3.05 3111 2201.04 631.44 50 . 3.05 3110 2204.09 632.58 51 . 3.05 3109 2207.14 633.24 52 W/L RB 4.22 3108 2211.36 634.91 53 . 3.84 3107 2215.20 638.03 54 TOP 1.85 3106 2217.04 638.49 55 SPIKE RB 5.45 3105 2222.49 639.04 56 . 10.34 3104 2232.83 639.49 57 . 0.94 3103 2233.77 639.72 58 TOP R/W 4.57 3102 2238.34 639.58 59 TOP R/W 2.14 3101 2240.48 638.60 60 TOE 2.73 3100 2243.20 638.93 61 TOE STEEP BANK END NECHAKO RIVER X/S 4 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4153 0.00 637.38 1 DUMMY 2000.00 4152 2000.00 637.38 2 TOE 27.43 4151 2027.43 637.26 3 IN FIELD 14.63 4150 2042.07 636.87 4 FIELD FLAT 6.70 4149 2048.77 637.14 5 EDGE FIELD 7.62 4148 2056.39 637.43 6 . 6.10 4147 2062.48 637.52 7 . 6.71 4146 2069.19 638.16 8 IN TREES 4.58 4145 2073.77 638.37 9 BUSHLINE 7.93 4144 2081.70 637.90 10 FIELD 7.93 4143 2089.63 638.02 11 TOP EDGE FIELD 3.35 4142 2092.98 637.15 12 TOE 2.75 4141 2095.73 636.54 13 C/L OLD CHAN 1.83 4140 2097.56 636.83 14 TOE 1.52 4139 2099.08 637.28 15 . 1.52 4138 2100.60 637.87 16 TOP 2.13 4137 2102.74 637.86 17 . 3.98 4136 2106.72 637.61 18 NG 5.48 4135 2112.20 637.40 19 NG 2.61 4134 2114.81 637.29 20 REBAR LB 1.08 4133 2115.89 637.07 21 TOP BANK 1.22 4132 2117.11 636.11 22 . 1.31 4131 2118.42 635.29 23 TOE 1.83 4130 2120.25 635.60 24 . 2.78 4129 2123.03 634.90 25 HWM 3.51 4128 2126.54 633.39 26 W/L LB 4.09 4127 2130.63 633.04 27 . 3.05 4126 2133.68 632.25 28 . 3.05 4125 2136.73 631.54 29 . 6.10 4124 2142.82 630.64 30 . 6.10 4123 2148.92 629.84 31 . 6.10 4122 2155.02 629.54 32 . 6.10 4121 2161.11 629.14 33 . 6.10 4120 2167.21 628.74 34 . 9.14 4119 2176.35 628.44 35 . 9.14 4118 2185.50 628.64 36 . 6.10 4117 2191.59 628.84 37 . 6.10 4116 2197.69 629.14 38 . 6.10 4115 2203.78 630.14 39 . 3.05 4114 2206.83 630.74 40 . 3.05 4113 2209.88 631.04 41 . 3.05 4112 2212.93 631.03 42 . 3.05 4111 2215.98 631.94 43 . 3.05 4110 2219.02 633.34 44 W/L RB 7.15 4109 2226.18 638.31 45 TOP 8.82 4108 2235.00 639.48 46 TOP 2.77 4107 2237.77 639.57 47 SPIKE CL TRACKS 2.10 4106 2239.87 639.62 48 TOP R/R 1.52 4105 2241.39 638.97 49 TOE 1.83 4104 2243.22 638.93 50 TOE 2.13 4103 2245.35 640.68 51 . 3.78 4102 2249.13 642.40 52 . 3.73 4101 2252.86 643.44 53 . 3.21 4100 2256.07 644.92 54 ON SLOPE STEEP END NECHAKO RIVER X/S 5 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5166 0.00 637.98 1 DUMMY 2000.00 5165 2000.00 637.98 2 RISING BEYOND 12.18 5164 2012.18 637.48 3 . 9.15 5163 2021.33 637.68 4 . 9.75 5162 2031.09 637.62 5 . 7.32 5161 2038.40 637.60 6 TOP 4.25 5160 2042.65 637.17 7 TOE 3.66 5159 2046.31 636.97 8 C/L BACK CHANNEL 2.44 5158 2048.75 637.01 9 TOE 3.66 5157 2052.41 637.57 10 TOP 7.93 5156 2060.34 637.14 11 TOE DRY 3.05 5155 2063.39 637.70 12 TOP BACK CHANNEL 12.17 5154 2075.56 637.19 13 . 8.54 5153 2084.10 637.28 14 FLAT 8.54 5152 2092.63 637.67 15 . 8.53 5151 2101.16 637.44 16 . 8.23 5150 2109.39 637.34 17 . 8.11 5149 2117.50 637.55 18 REBAR LB 3.77 5148 2121.27 637.50 19 TOP BANK 3.03 5147 2124.30 635.54 20 HWM 1.23 5146 2125.53 634.53 21 TOE 4.29 5145 2129.82 633.43 22 W/L LB 4.31 5144 2134.12 632.89 23 . 3.05 5143 2137.17 632.24 24 . 6.10 5142 2143.27 631.14 25 . 3.05 5141 2146.32 630.84 26 . 3.05 5140 2149.36 630.24 27 . 3.05 5139 2152.41 630.14 28 . 6.10 5138 2158.51 630.64 29 . 3.05 5137 2161.56 630.74 30 . 3.05 5136 2164.60 630.74 31 . 6.10 5135 2170.70 631.04 32 . 6.10 5134 2176.80 631.14 33 . 3.05 5133 2179.84 630.24 34 . 9.14 5132 2188.99 630.84 35 . 3.05 5131 2192.04 630.74 36 . 3.05 5130 2195.08 630.94 37 . 6.10 5129 2201.18 630.94 38 . 3.05 5128 2204.23 631.04 39 . 3.05 5127 2207.28 631.24 40 . 3.05 5126 2210.32 631.24 41 . 3.05 5125 2213.37 631.14 42 . 6.10 5124 2219.47 631.64 43 . 3.05 5123 2222.52 631.94 44 . 3.05 5122 2225.56 631.84 45 . 3.05 5121 2228.61 632.14 46 . 3.05 5120 2231.66 631.94 47 . 3.05 5119 2234.71 632.19 48 . 3.05 5118 2237.76 632.13 49 . 3.05 5117 2240.80 632.37 50 . 3.05 5116 2243.85 632.57 51 . 3.05 5115 2246.90 632.59 52 . 6.10 5114 2253.00 632.98 53 . 6.10 5113 2259.09 633.19 54 . 3.05 5112 2262.14 633.44 55 W/L RB 8.21 5111 2270.35 633.83 56 . 11.56 5110 2281.91 634.35 57 . 8.24 5109 2290.15 634.79 58 HWM 6.37 5108 2296.52 635.20 59 . 2.16 5107 2298.68 635.62 60 BOLT RB 8.50 5106 2307.18 635.52 61 . 10.36 5105 2317.54 636.02 62 . 10.06 5104 2327.60 635.76 63 . 6.40 5103 2334.00 635.50 64 . 6.71 5102 2340.71 635.27 65 TOE 3.65 5101 2344.35 636.34 66 TOP 10.97 5100 2355.32 636.29 67 FENCE EDGE FLD END NECHAKO RIVER X/S 6 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6146 0.00 636.60 1 DUMMY 2000.00 6145 2000.00 636.60 2 EDGE GRASS FLAT 10.97 6144 2010.97 637.16 3 IN FIELD 27.43 6143 2038.41 637.07 4 . 15.55 6142 2053.95 638.11 5 TOP 8.23 6141 2062.18 637.45 6 TOE 13.41 6140 2075.59 637.41 7 . 22.83 6139 2098.42 638.34 8 REBAR LB TOP 0.95 6138 2099.37 636.51 9 HWM 1.53 6137 2100.90 635.21 10 TOE 2.48 6136 2103.38 634.12 11 . 1.84 6135 2105.22 633.43 12 W/L LB 6.50 6134 2111.72 632.70 13 . 3.05 6133 2114.76 632.10 14 . 3.05 6132 2117.81 631.80 15 . 3.05 6131 2120.86 631.80 16 . 9.14 6130 2130.00 631.10 17 . 6.10 6129 2136.10 631.00 18 . 6.10 6128 2142.20 630.90 19 . 15.24 6127 2157.44 631.00 20 . 6.10 6126 2163.53 631.00 21 . 6.10 6125 2169.63 631.50 22 . 9.14 6124 2178.77 631.80 23 . 6.10 6123 2184.87 631.90 24 . 3.05 6122 2187.92 632.00 25 . 18.29 6121 2206.20 632.60 26 . 3.05 6120 2209.25 632.67 27 . 3.05 6119 2212.30 632.82 28 . 3.05 6118 2215.35 632.96 29 . 3.05 6117 2218.40 633.03 30 . 3.05 6116 2221.44 633.11 31 . 3.05 6115 2224.49 633.18 32 . 3.05 6114 2227.54 633.15 33 . 3.05 6113 2230.59 633.14 34 . 3.05 6112 2233.64 633.30 35 . 3.05 6111 2236.68 633.18 36 . 3.05 6110 2239.73 633.23 37 . 3.05 6109 2242.78 633.39 38 . 3.05 6108 2245.83 633.45 39 . 3.05 6107 2248.88 633.50 40 W/L RB 14.97 6106 2263.85 633.75 41 . 22.12 6105 2285.97 635.15 42 . 50.39 6104 2336.35 636.25 43 TOE 3.83 6103 2340.19 637.54 44 BOLT RB TOP 3.78 6102 2343.96 636.25 45 TOE DYKE 30.00 6101 2373.96 636.44 46 . 35.04 6100 2409.00 636.32 47 FLAT BYND C/L RD END NECHAKO RIVER X/S 7 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7148 0.00 649.37 1 DUMMY 2000.00 7147 2000.00 649.37 2 STEEP SLOPE BEYO 2.78 7146 2002.78 647.96 3 REBAR LB 9.27 7145 2012.06 640.64 4 . 2.98 7144 2015.03 638.13 5 . 2.45 7143 2017.48 636.39 6 HWM 4.29 7142 2021.77 635.31 7 TOE 4.90 7141 2026.67 634.45 8 . 5.25 7140 2031.92 633.50 9 W/L LB 7.01 7139 2038.93 633.28 10 . 3.05 7138 2041.98 632.98 11 . 6.10 7137 2048.07 632.83 12 . 9.14 7136 2057.22 631.43 13 . 3.05 7135 2060.27 631.13 14 . 3.05 7134 2063.31 630.73 15 . 3.05 7133 2066.36 630.33 16 . 3.05 7132 2069.41 630.13 17 . 3.05 7131 2072.46 629.83 18 . 3.05 7130 2075.51 629.23 19 . 3.05 7129 2078.55 629.23 20 . 3.05 7128 2081.60 629.33 21 . 3.05 7127 2084.65 629.73 22 . 9.14 7126 2093.79 630.13 23 . 3.05 7125 2096.84 630.13 24 . 3.05 7124 2099.89 629.93 25 . 3.05 7123 2102.94 630.03 26 . 3.05 7122 2105.99 630.03 27 . 3.05 7121 2109.03 630.03 28 . 3.05 7120 2112.08 630.23 29 . 3.05 7119 2115.13 630.53 30 . 3.05 7118 2118.18 631.23 31 . 3.05 7117 2121.23 631.16 32 . 3.05 7116 2124.27 631.53 33 . 3.05 7115 2127.32 631.73 34 . 3.05 7114 2130.37 632.14 35 . 3.05 7113 2133.42 632.59 36 . 3.05 7112 2136.47 633.04 37 . 3.05 7111 2139.51 633.53 38 W/L RB 4.31 7110 2143.82 634.02 39 VEGETATION LINE 4.78 7109 2148.60 634.55 40 . 7.28 7108 2155.89 635.05 41 TOE HWM 2.11 7107 2157.99 636.05 42 TOP 11.91 7106 2169.90 637.19 43 BOLT RB TOE 1.79 7105 2171.69 637.79 44 TOP 0.92 7104 2172.61 637.27 45 TOE 26.52 7103 2199.13 636.55 46 TOP 5.18 7102 2204.31 635.58 47 TOE 7.62 7101 2211.93 636.01 48 . 12.80 7100 2224.73 636.12 49 FLAT BEYOND END NECHAKO RIVER X/S 8 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8160 0.00 636.69 1 DUMMY 2000.00 8159 2000.00 636.69 2 TOE FLAT BEYOND 12.19 8158 2012.19 637.71 3 TOP 18.90 8157 2031.09 637.61 4 TOP 6.10 8156 2037.19 637.00 5 TOE 7.32 8155 2044.50 637.13 6 TOE 1.83 8154 2046.33 637.61 7 TOP BANK 2.44 8153 2048.77 636.78 8 TOE 14.63 8152 2063.40 637.36 9 TOP BANK 2.44 8151 2065.84 637.01 10 TOE 7.93 8150 2073.77 636.88 11 . 15.85 8149 2089.61 636.85 12 . 17.68 8148 2107.29 637.38 13 TOP 4.88 8147 2112.17 636.54 14 TOE 12.19 8146 2124.37 636.36 15 TOE 3.65 8145 2128.02 636.70 16 TOP 9.75 8144 2137.78 636.63 17 . 8.54 8143 2146.32 636.94 18 TOP 4.27 8142 2150.58 636.31 19 TOE 9.15 8141 2159.73 635.75 20 TOE 3.05 8140 2162.78 636.39 21 TOP 8.71 8139 2171.49 636.74 22 REBAR LB TOP 3.50 8138 2174.98 635.96 23 TOE 4.90 8137 2179.88 635.24 24 HWM 4.91 8136 2184.80 634.43 25 . 8.55 8135 2193.35 633.53 26 W/L LB 7.34 8134 2200.69 633.03 27 . 3.05 8133 2203.74 632.75 28 . 6.10 8132 2209.84 632.85 29 . 12.19 8131 2222.03 632.35 30 . 12.19 8130 2234.22 632.35 31 . 6.10 8129 2240.32 632.55 32 . 9.14 8128 2249.46 632.45 33 . 9.14 8127 2258.61 632.25 34 . 3.05 8126 2261.65 632.45 35 . 3.05 8125 2264.70 632.35 36 . 3.05 8124 2267.75 632.45 37 . 3.05 8123 2270.80 632.35 38 . 6.10 8122 2276.89 631.95 39 . 9.14 8121 2286.04 631.75 40 . 9.14 8120 2295.18 631.35 41 . 3.05 8119 2298.23 631.15 42 . 3.05 8118 2301.28 630.85 43 . 1.52 8117 2302.80 630.65 44 . 1.52 8116 2304.33 630.70 45 . 3.05 8115 2307.37 630.90 46 . 3.05 8114 2310.42 631.00 47 . 3.05 8113 2313.47 631.05 48 . 3.05 8112 2316.52 630.85 49 . 3.05 8111 2319.57 631.00 50 . 3.05 8110 2322.61 631.25 51 . 3.05 8109 2325.66 631.93 52 . 3.05 8108 2328.71 632.71 53 . 3.05 8107 2331.76 633.45 54 W/L RB 3.83 8106 2335.59 634.47 55 . 5.59 8105 2341.18 635.56 56 . 3.55 8104 2344.73 638.13 57 TOP 2.77 8103 2347.50 638.14 58 BOLT RB 12.16 8102 2359.66 638.00 59 . 26.81 8101 2386.47 637.85 60 . 18.28 8100 2404.75 637.69 61 FLAT BEYOND END NECHAKO RIVER X/S 9 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9153 0.00 636.50 1 DUMMY 2000.00 9152 2000.00 636.50 2 ROLLING BEYOND 25.60 9151 2025.60 636.79 3 . 26.21 9150 2051.82 636.87 4 . 15.24 9149 2067.06 637.12 5 TOE 6.71 9148 2073.76 638.00 6 TOP 3.47 9147 2077.24 638.01 7 REBAR LB 3.84 9146 2081.08 637.62 8 TOP 0.64 9145 2081.71 635.00 9 TOE HWM 3.05 9144 2084.77 634.22 10 . 3.07 9143 2087.84 633.60 11 W/L LB 23.47 9142 2111.31 633.51 12 . 3.05 9141 2114.36 633.46 13 . 3.05 9140 2117.41 632.82 14 . 12.19 9139 2129.60 633.02 15 . 9.14 9138 2138.75 632.42 16 . 6.10 9137 2144.84 632.32 17 . 6.10 9136 2150.94 632.02 18 . 3.05 9135 2153.99 632.12 19 . 21.34 9134 2175.32 632.32 20 . 15.24 9133 2190.56 632.32 21 . 3.05 9132 2193.61 632.42 22 . 6.10 9131 2199.71 632.72 23 . 3.05 9130 2202.75 632.85 24 . 3.05 9129 2205.80 633.04 25 . 12.19 9128 2217.99 633.17 26 . 3.05 9127 2221.04 633.35 27 . 3.05 9126 2224.09 633.33 28 . 3.05 9125 2227.14 633.50 29 . 9.14 9124 2236.28 633.42 30 . 6.10 9123 2242.38 633.08 31 . 3.05 9122 2245.43 633.62 32 W/L RB 7.60 9121 2253.03 634.94 33 BOLT RB TOP 11.26 9120 2264.29 635.42 34 . 9.75 9119 2274.04 635.70 35 . 10.67 9118 2284.70 636.15 36 . 14.01 9117 2298.72 635.88 37 . 10.05 9116 2308.76 636.57 38 . 8.54 9115 2317.30 637.51 39 . 5.82 9114 2323.12 637.66 40 SPIKE RB 3.93 9113 2327.05 637.48 41 . 5.49 9112 2332.53 637.26 42 . 10.35 9111 2342.89 636.86 43 . 10.67 9110 2353.55 636.68 44 . 7.32 9109 2360.87 636.15 45 EDGE BACK CHANNE 13.11 9108 2373.98 635.46 46 DRY CHANNEL 8.54 9107 2382.52 636.27 47 TOE 3.66 9106 2386.18 637.25 48 TOP 7.92 9105 2394.10 636.99 49 . 8.23 9104 2402.33 636.58 50 . 8.84 9103 2411.17 636.52 51 TOE 1.22 9102 2412.39 637.45 52 ON SLOPE 5.79 9101 2418.18 639.08 53 TOP FLAT BEYOND END NECHAKO RIVER X/S 10 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10135 0.00 636.90 1 DUMMY 2000.00 10134 2000.00 636.90 2 SLOW RISE BEYOND 16.46 10133 2016.46 636.69 3 EDGE LAWN 3.14 10132 2019.60 636.22 4 REBAR LB 2.04 10131 2021.64 635.75 5 TOP 0.62 10130 2022.26 635.20 6 TOE 8.26 10129 2030.52 634.64 7 HWM LB 0.91 10128 2031.42 634.62 8 . 11.34 10127 2042.77 633.76 9 W/L LB 3.35 10126 2046.11 633.59 10 . 3.05 10125 2049.16 633.05 11 . 15.24 10124 2064.40 632.05 12 . 9.14 10123 2073.54 631.05 13 . 3.05 10122 2076.59 631.00 14 . 3.05 10121 2079.64 631.05 15 . 9.14 10120 2088.78 631.55 16 . 5.49 10119 2094.27 632.25 17 . 0.61 10118 2094.88 631.95 18 . 9.14 10117 2104.02 632.25 19 . 9.14 10116 2113.17 632.95 20 . 3.05 10115 2116.22 632.95 21 . 3.05 10114 2119.26 632.75 22 . 3.05 10113 2122.31 632.95 23 . 3.05 10112 2125.36 633.10 24 . 9.14 10111 2134.50 633.53 25 . 6.10 10110 2140.60 633.37 26 . 6.10 10109 2146.70 633.39 27 . 6.10 10108 2152.79 633.50 28 . 3.05 10107 2155.84 633.75 29 W/L RB 4.19 10106 2160.03 634.48 30 . 3.06 10105 2163.09 635.06 31 TOE HWM 3.04 10104 2166.13 636.76 32 TOP 1.54 10103 2167.67 636.58 33 BOLT RB 9.10 10102 2176.77 636.25 34 . 15.22 10101 2191.99 636.00 35 EDGE BUSH 3.97 10100 2195.96 636.30 36 FLAT BEYOND END NECHAKO RIVER X/S 11 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11155 0.00 645.49 1 DUMMY 2000.00 11154 2000.00 645.49 2 TOP RISING BEYON 4.15 11153 2004.15 642.53 3 TOE 2.74 11152 2006.89 642.25 4 EDGE ROAD 21.94 11151 2028.83 641.68 5 EDGE ROAD 7.07 11150 2035.90 641.55 6 REBAR LB 0.24 11149 2036.14 641.45 7 TOP 13.78 11148 2049.92 638.04 8 TOE 6.74 11147 2056.66 637.31 9 TOP 0.62 11146 2057.29 636.73 10 HWM 0.92 11145 2058.20 635.49 11 TOE ABUT 6.91 11144 2065.11 634.33 12 VEGTATION LINE 7.97 11143 2073.08 633.78 13 W/L LB 6.85 11142 2079.93 633.29 14 . 3.05 11141 2082.97 632.93 15 . 6.10 11140 2089.07 631.43 16 . 6.10 11139 2095.17 630.93 17 . 3.05 11138 2098.21 631.43 18 . 4.27 11137 2102.48 632.53 19 . 1.83 11136 2104.31 632.23 20 . 6.10 11135 2110.41 632.53 21 . 3.05 11134 2113.45 632.33 22 . 3.05 11133 2116.50 632.08 23 . 5.18 11132 2121.68 632.23 24 . 7.01 11131 2128.69 631.83 25 . 4.27 11130 2132.96 631.23 26 . 3.35 11129 2136.31 632.03 27 . 4.57 11128 2140.89 631.73 28 . 4.27 11127 2145.15 631.23 29 . 1.83 11126 2146.98 631.48 30 . 3.05 11125 2150.03 631.48 31 . 3.05 11124 2153.08 631.83 32 . 1.52 11123 2154.60 631.73 33 . 1.52 11122 2156.13 631.93 34 . 3.05 11121 2159.17 632.23 35 . 3.05 11120 2162.22 632.43 36 . 3.05 11119 2165.27 632.53 37 . 3.05 11118 2168.32 632.95 38 . 1.52 11117 2169.84 632.71 39 . 1.52 11116 2171.37 632.83 40 . 3.05 11115 2174.41 632.88 41 . 3.05 11114 2177.46 632.62 42 . 3.05 11113 2180.51 633.09 43 . 3.05 11112 2183.56 633.73 44 W/L RB 7.21 11111 2190.77 634.32 45 . 8.25 11110 2199.02 635.25 46 EDGE VEGETATION 3.84 11109 2202.86 636.24 47 HWM 0.28 11108 2203.13 636.64 48 TOP 4.20 11107 2207.33 636.61 49 TOE ABUT 1.03 11106 2208.37 640.38 50 TOP STRINGER 1.58 11105 2209.94 636.79 51 TOE + TOE ABUT 9.40 11104 2219.34 640.89 52 TOP 1.84 11103 2221.19 641.02 53 BOLT RB 6.06 11102 2227.25 641.24 54 . 27.42 11101 2254.67 640.43 55 EDGE ROAD 33.47 11100 2288.14 639.53 56 FLAT BEYOND END NECHAKO RIVER X/S 12 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 12164 0.00 643.53 1 DUMMY 2000.00 12163 2000.00 643.53 2 TOP 1.81 12162 2001.81 642.18 3 TOE 3.65 12161 2005.46 642.09 4 EDGE ROAD 26.51 12160 2031.97 641.42 5 EDGE ROAD 6.28 12159 2038.25 641.32 6 REBAR LB 1.34 12158 2039.59 641.27 7 TOP 5.22 12157 2044.82 638.79 8 . 6.43 12156 2051.25 636.37 9 TOE ABUT 0.08 12155 2051.33 640.31 10 TOP ABUT 3.02 12154 2054.35 640.27 11 TOP ABUT 0.15 12153 2054.49 636.21 12 TOE ABUT 5.67 12152 2060.16 634.34 13 HWM LB 0.25 12151 2060.41 634.38 14 . 4.58 12150 2064.99 633.77 15 W/L LB 5.09 12149 2070.08 633.25 16 . 3.05 12148 2073.13 632.90 17 . 3.05 12147 2076.18 632.50 18 . 6.10 12146 2082.27 631.50 19 . 6.10 12145 2088.37 630.95 20 . 3.05 12144 2091.42 631.00 21 . 3.05 12143 2094.46 632.15 22 . 3.05 12142 2097.51 632.80 23 . 5.79 12141 2103.30 632.10 24 . 3.35 12140 2106.66 632.20 25 . 4.88 12139 2111.53 631.80 26 . 4.27 12138 2115.80 632.00 27 . 3.05 12137 2118.85 631.90 28 . 7.62 12136 2126.47 631.95 29 . 0.91 12135 2127.38 632.80 30 . 0.15 12134 2127.53 640.03 31 TOP ABUT 1.83 12133 2129.36 640.02 32 TOP ABUT 1.07 12132 2130.43 632.25 33 . 1.83 12131 2132.26 631.50 34 . 5.79 12130 2138.05 630.90 35 . 4.27 12129 2142.32 631.70 36 . 10.06 12128 2152.38 632.35 37 . 1.22 12127 2153.60 632.35 38 . 1.83 12126 2155.42 632.70 39 . 3.05 12125 2158.47 632.95 40 . 3.05 12124 2161.52 633.28 41 . 1.83 12123 2163.35 633.70 42 . 2.74 12122 2166.09 632.70 43 . 0.15 12121 2166.24 640.08 44 TOP ABUT 0.91 12120 2167.16 640.08 45 TOP ABUT 1.07 12119 2168.23 633.70 46 . 2.44 12118 2170.66 632.86 47 . 3.05 12117 2173.71 633.10 48 . 3.05 12116 2176.76 633.70 49 W/L RB 4.62 12115 2181.38 634.17 50 . 6.81 12114 2188.19 634.98 51 . 1.42 12113 2189.61 635.52 52 HWM RB 1.20 12112 2190.81 635.65 53 EDGE OF VEG 4.52 12111 2195.34 636.45 54 . 7.46 12110 2202.79 636.54 55 TOE ABUT 0.02 12109 2202.82 640.40 56 TOP ABUT 0.88 12108 2203.70 640.40 57 TOP ABUT 1.15 12107 2204.84 636.64 58 TOE OF ABUTMENT 5.21 12106 2210.06 638.56 59 . 0.73 12105 2210.78 638.62 60 . 6.36 12104 2217.14 641.17 61 TOP 1.86 12103 2219.00 641.16 62 BOLT RB 15.81 12102 2234.81 640.90 63 ON ROAD 30.45 12101 2265.26 639.93 64 ON ROAD 37.76 12100 2303.02 639.34 65 ON ROAD END NECHAKO RIVER X/S 13 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13159 0.00 646.49 1 DUMMY 2000.00 13158 2000.00 646.49 2 TOP RISING BEYON 6.40 13157 2006.40 641.79 3 TOE 15.85 13156 2022.25 641.80 4 TOP EDGE ROAD 5.10 13155 2027.34 639.18 5 TOE 16.54 13154 2043.89 638.26 6 REBAR LB 2.32 13153 2046.20 638.32 7 TOP 1.52 13152 2047.73 637.94 8 HWM 3.06 13151 2050.79 635.18 9 TOE 1.24 13150 2052.03 634.80 10 . 1.53 13149 2053.56 634.37 11 TOE 1.86 13148 2055.42 633.76 12 W/L LB 6.09 13147 2061.51 632.82 13 . 3.05 13146 2064.56 632.29 14 . 5.18 13145 2069.74 632.04 15 . 13.11 13144 2082.85 632.59 16 . 12.19 13143 2095.04 632.59 17 . 3.05 13142 2098.09 632.39 18 . 3.05 13141 2101.13 632.29 19 . 3.05 13140 2104.18 632.39 20 . 3.05 13139 2107.23 632.69 21 . 6.10 13138 2113.33 633.09 22 . 6.10 13137 2119.42 633.09 23 . 9.14 13136 2128.57 632.99 24 . 9.14 13135 2137.71 632.49 25 . 10.06 13134 2147.77 632.84 26 . 5.18 13133 2152.95 632.99 27 . 3.05 13132 2156.00 633.12 28 . 3.05 13131 2159.05 633.19 29 . 3.05 13130 2162.09 633.37 30 . 3.05 13129 2165.14 633.49 31 . 3.05 13128 2168.19 633.79 32 W/L RB 6.71 13127 2174.90 634.97 33 TOE EDGE VEG 2.67 13126 2177.57 637.03 34 TOP HWM 1.86 13125 2179.43 637.29 35 BOLT RB 2.70 13124 2182.13 637.16 36 . 1.53 13123 2183.66 637.48 37 TOP 4.27 13122 2187.93 637.20 38 . 6.71 13121 2194.64 636.99 39 CENTRE CLEARING 10.67 13120 2205.30 636.79 40 . 7.62 13119 2212.92 636.76 41 . 10.06 13118 2222.98 636.55 42 MIDDLE CLEARING 5.18 13117 2228.16 636.03 43 TOE 3.66 13116 2231.82 636.90 44 . 11.89 13115 2243.71 637.09 45 FLAT 8.53 13114 2252.24 636.97 46 FLAT 5.18 13113 2257.42 636.66 47 TOE 4.87 13112 2262.29 636.52 48 TOE 2.44 13111 2264.74 636.86 49 TOP 10.97 13110 2275.71 636.83 50 . 7.62 13109 2283.33 636.73 51 . 9.45 13108 2292.78 637.13 52 . 13.41 13107 2306.19 637.14 53 NG 10.36 13106 2316.56 637.20 54 TOP 9.14 13105 2325.70 636.10 55 TOE 6.10 13104 2331.80 635.83 56 TOP 3.66 13103 2335.46 635.79 57 TOE 3.66 13102 2339.11 635.86 58 TOE 4.88 13101 2343.99 637.20 59 EDGE BUSH 6.10 13100 2350.09 637.11 60 IN FIELD FLAT END NECHAKO RIVER X/S 14 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 14166 0.00 638.76 1 DUMMY 2000.00 14165 2000.00 638.76 2 EDGE ROAD 17.05 14164 2017.05 636.34 3 TOE 20.21 14163 2037.26 636.56 4 REBAR LB 5.39 14162 2042.65 636.72 5 HWM 14.61 14161 2057.26 634.00 6 W/L BACK CHANNEL 3.66 14160 2060.92 633.69 7 TOE 1.2 D 13.41 14159 2074.33 633.57 8 1.9 D 3.66 14158 2077.99 633.56 9 TOE 1.5 D 8.54 14157 2086.52 634.01 10 W/L BACK CHANNEL 17.07 14156 2103.59 634.19 11 EDGE VEG 20.73 14155 2124.32 634.53 12 EDGE FIELD 40.23 14154 2164.55 635.00 13 . 40.23 14153 2204.78 634.46 14 EDGE VEG 13.12 14152 2217.90 634.04 15 W/L LB CHANNEL 9.14 14151 2227.04 633.73 16 1.9 D 8.54 14150 2235.58 633.70 17 1.3 D 10.97 14149 2246.55 633.88 18 0.6 D 13.41 14148 2259.96 634.01 19 0.2 D 14.32 14147 2274.28 633.87 20 0.6 D 13.42 14146 2287.70 634.15 21 TOP SANDBAR 13.72 14145 2301.43 633.81 22 0.9 D 5.48 14144 2306.91 634.00 23 0.2 D 12.87 14143 2319.78 633.92 24 0.5 D 5.17 14142 2324.95 633.50 25 2.0 D 4.87 14141 2329.82 633.10 26 3.3 D 8.80 14140 2338.62 633.19 27 3.0 D 7.93 14139 2346.55 633.62 28 1.4 D 8.21 14138 2354.76 634.01 29 W/L 2.43 14137 2357.19 634.49 30 EDGE VEG 1.82 14136 2359.01 634.92 31 ON ISLE TOP 6.70 14135 2365.72 635.01 32 REBAR ON ISLAND 12.20 14134 2377.91 634.91 33 . 7.92 14133 2385.84 634.13 34 TOE ON ISLAND 4.27 14132 2390.11 634.08 35 . 7.02 14131 2397.12 634.00 36 W/L LB 6.08 14130 2403.20 633.89 37 . 3.05 14129 2406.25 633.89 38 . 3.05 14128 2409.30 633.91 39 . 6.10 14127 2415.39 633.83 40 . 6.10 14126 2421.49 633.77 41 . 3.05 14125 2424.54 633.26 42 . 3.05 14124 2427.59 632.54 43 . 3.05 14123 2430.63 632.36 44 . 9.14 14122 2439.78 632.06 45 . 3.96 14121 2443.74 632.11 46 . 5.18 14120 2448.92 632.36 47 . 12.19 14119 2461.11 632.61 48 . 9.14 14118 2470.26 632.86 49 . 3.05 14117 2473.31 632.91 50 . 12.19 14116 2485.50 633.01 51 . 12.19 14115 2497.69 633.11 52 . 3.05 14114 2500.74 633.11 53 . 3.05 14113 2503.79 633.21 54 . 3.05 14112 2506.83 633.16 55 . 3.05 14111 2509.88 633.27 56 . 3.05 14110 2512.93 633.46 57 . 3.05 14109 2515.98 633.69 58 . 3.05 14108 2519.03 634.01 59 W/L RB 3.81 14107 2522.84 634.29 60 TOE 1.68 14106 2524.52 634.81 61 TOP 6.99 14105 2531.51 635.71 62 ON SLOPE EDGEVEG 5.93 14104 2537.44 636.75 63 . 1.36 14103 2538.80 637.91 64 TOP HWM 1.25 14102 2540.05 637.91 65 BOLT RB 17.94 14101 2557.99 637.58 66 . 31.09 14100 2589.08 637.71 67 FIELD FLAT BEYON END NECHAKO RIVER X/S 15 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15180 0.00 637.11 1 DUMMY 2000.00 15179 2000.00 637.11 2 REBAR LB 1% RIS 2.44 15178 2002.44 636.81 3 TOP 0.61 15177 2003.05 637.42 4 HWM 3.05 15176 2006.10 635.27 5 TOE 6.10 15175 2012.19 634.96 6 C/L DRY CHNL 0.61 15174 2012.80 635.17 7 TOE 8.53 15173 2021.34 635.37 8 TOP 4.88 15172 2026.21 634.97 9 HWM TOE 6.10 15171 2032.31 634.77 10 W/L LB BACK CHNL 1.22 15170 2033.53 634.44 11 . 3.05 15169 2036.58 634.32 12 . 3.05 15168 2039.63 634.10 13 . 3.05 15167 2042.67 633.90 14 . 3.05 15166 2045.72 633.73 15 . 3.05 15165 2048.77 633.71 16 . 3.05 15164 2051.82 633.76 17 . 3.05 15163 2054.87 633.92 18 . 6.10 15162 2060.96 634.14 19 . 6.10 15161 2067.06 634.41 20 . 6.10 15160 2073.15 634.64 21 . 3.05 15159 2076.20 634.76 22 W/L RB BACK CHNL 2.44 15158 2078.64 634.94 23 EDGE VEG HWM TOE 6.71 15157 2085.34 635.17 24 TOE 1.83 15156 2087.17 635.65 25 . 12.50 15155 2099.67 635.73 26 . 15.54 15154 2115.22 635.83 27 . 12.50 15153 2127.71 636.09 28 TOP 5.79 15152 2133.50 635.12 29 TOE 1.83 15151 2135.33 635.99 30 . 4.27 15150 2139.60 636.08 31 TOP 3.66 15149 2143.26 635.45 32 HWM TOE 2.14 15148 2145.40 635.12 33 REBAR LB ISLAND 2.15 15147 2147.55 634.75 34 EDGE VEG 15.55 15146 2163.10 634.43 35 W/L LB 13.11 15145 2176.21 634.37 36 0.5 D 4.27 15144 2180.49 634.51 37 W/L RB 7.92 15143 2188.41 634.69 38 TOP SANDBAR 14.03 15142 2202.44 634.55 39 W/L LB SANDBAR 7.98 15141 2210.42 634.38 40 . 6.10 15140 2216.51 633.99 41 . 13.11 15139 2229.62 633.94 42 . 7.01 15138 2236.63 633.59 43 . 4.27 15137 2240.90 633.79 44 . 7.62 15136 2248.52 633.39 45 . 7.62 15135 2256.14 633.79 46 . 3.05 15134 2259.18 633.84 47 . 3.05 15133 2262.23 633.74 48 . 12.19 15132 2274.42 634.04 49 . 6.10 15131 2280.52 634.01 50 . 9.14 15130 2289.66 633.97 51 . 12.19 15129 2301.86 634.19 52 . 6.10 15128 2307.95 634.17 53 . 3.05 15127 2311.00 634.24 54 . 9.14 15126 2320.14 634.24 55 . 3.05 15125 2323.19 634.04 56 . 3.05 15124 2326.24 634.09 57 . 3.05 15123 2329.29 634.01 58 . 3.05 15122 2332.34 633.99 59 . 3.05 15121 2335.38 634.01 60 . 3.05 15120 2338.43 633.87 61 . 3.05 15119 2341.48 634.14 62 . 6.10 15118 2347.58 634.09 63 . 6.10 15117 2353.67 633.84 64 . 3.05 15116 2356.72 633.89 65 . 6.10 15115 2362.82 632.79 66 . 3.05 15114 2365.86 633.20 67 . 3.05 15113 2368.91 634.59 68 W/L RB 1.12 15112 2370.03 635.69 69 HWM 0.93 15111 2370.95 636.97 70 TOP 3.98 15110 2374.93 637.14 71 BOLT RB 14.88 15109 2389.81 636.29 72 . 11.89 15108 2401.70 636.44 73 . 12.49 15107 2414.20 636.22 74 . 16.75 15106 2430.95 636.01 75 . 14.01 15105 2444.95 635.55 76 . 14.66 15104 2459.62 635.21 77 . 9.14 15103 2468.76 635.42 78 TOE 7.94 15102 2476.70 636.11 79 TOP 7.31 15101 2484.01 635.96 80 . 14.32 15100 2498.33 635.80 81 POINT END NECHAKO RIVER X/S 16 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 16165 0.00 639.10 1 DUMMY 2000.00 16164 2000.00 639.10 2 TOP ROLL BEYOND 32.30 16163 2032.30 637.67 3 TOE OF RISE 1.22 16162 2033.52 637.60 4 . 14.02 16161 2047.54 637.58 5 . 14.63 16160 2062.17 638.48 6 . 29.26 16159 2091.44 639.04 7 POINT IN FIELD 19.51 16158 2110.94 638.06 8 EDGE FIELD 0.12 16157 2111.06 638.41 9 REBAR LB 1.10 16156 2112.16 638.25 10 TOP 2.15 16155 2114.31 636.30 11 TOE HWM 1.56 16154 2115.87 635.94 12 EDGE VEG 2.45 16153 2118.31 635.42 13 W/L LB MAIN CHNL 3.07 16152 2121.38 634.93 14 1.6 D 6.71 16151 2128.09 634.83 15 2.0 D 7.62 16150 2135.71 635.21 16 0.6 D 11.58 16149 2147.29 635.44 17 W/L SANDBAR RB 3.33 16148 2150.63 635.62 18 . 12.53 16147 2163.16 635.66 19 SANDBAR 6.09 16146 2169.25 635.52 20 W/L BAR 3.74 16145 2172.99 635.45 21 . 3.05 16144 2176.03 635.32 22 . 9.14 16143 2185.18 635.14 23 . 15.24 16142 2200.42 634.40 24 . 9.14 16141 2209.56 634.25 25 . 5.18 16140 2214.74 634.10 26 . 7.01 16139 2221.75 634.40 27 . 9.14 16138 2230.90 633.85 28 . 3.05 16137 2233.95 633.80 29 . 9.14 16136 2243.09 634.15 30 . 9.14 16135 2252.23 634.55 31 . 3.05 16134 2255.28 634.77 32 . 3.05 16133 2258.33 634.91 33 . 3.05 16132 2261.38 635.02 34 . 3.05 16131 2264.43 635.08 35 . 3.05 16130 2267.47 635.08 36 . 3.05 16129 2270.52 635.26 37 . 3.05 16128 2273.57 635.50 38 W/L RB 3.95 16127 2277.52 636.06 39 EDGE VEG 7.17 16126 2284.69 636.64 40 HWM TOE 2.13 16125 2286.82 637.64 41 TOP 3.35 16124 2290.18 637.75 42 TOE 0.62 16123 2290.79 638.33 43 TOP 1.81 16122 2292.60 638.56 44 SPIKE RB MN CHN 2.98 16121 2295.59 638.50 45 TOP 4.27 16120 2299.85 637.69 46 TOP 2.44 16119 2302.29 637.16 47 C/L GULLY 6.09 16118 2308.39 637.80 48 TOE 8.54 16117 2316.92 638.60 49 TOP 6.10 16116 2323.02 637.94 50 TOE 13.41 16115 2336.43 637.33 51 TOE 9.75 16114 2346.18 637.99 52 . 1.83 16113 2348.01 637.82 53 TOP 7.93 16112 2355.94 636.08 54 TOE GULLY 17.67 16111 2373.62 638.98 55 . 8.23 16110 2381.85 638.89 56 . 41.15 16109 2423.00 639.12 57 . 22.88 16108 2445.87 638.55 58 . 22.86 16107 2468.73 638.52 59 TOE 18.59 16106 2487.32 639.06 60 . 22.55 16105 2509.87 639.21 61 . 18.29 16104 2528.15 639.42 62 NG 16.76 16103 2544.91 639.36 63 . 13.10 16102 2558.02 638.87 64 TOE TRACK 8.54 16101 2566.56 640.22 65 TOP TRACK 1.49 16100 2568.04 640.26 66 SPIKE CL TRACKS END NECHAKO RIVER X/S 17 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 17151 0.00 639.00 1 DUMMY 2000.00 17150 2000.00 639.00 2 FLAT 500F RISE 18.32 17149 2018.32 639.03 3 FIELD 21.33 17148 2039.64 639.17 4 FIELD 21.33 17147 2060.98 639.40 5 TOP EDGE FIELD 1.86 17146 2062.83 638.33 6 TOE 1.83 17145 2064.66 638.67 7 REBAR LB 2.57 17144 2067.24 637.52 8 TOE 1.21 17143 2068.44 637.14 9 VEG EDGE 3.68 17142 2072.12 636.75 10 W/L LB 3.85 17141 2075.97 636.77 11 . 3.05 17140 2079.02 636.47 12 . 3.05 17139 2082.07 636.35 13 . 3.05 17138 2085.12 636.35 14 . 3.05 17137 2088.16 636.08 15 . 8.23 17136 2096.39 635.63 16 . 7.01 17135 2103.40 635.58 17 . 12.19 17134 2115.60 635.28 18 . 9.14 17133 2124.74 635.08 19 . 18.29 17132 2143.03 635.33 20 . 12.19 17131 2155.22 635.73 21 . 9.14 17130 2164.36 636.16 22 . 3.05 17129 2167.41 636.18 23 . 3.05 17128 2170.46 636.32 24 . 3.05 17127 2173.51 636.35 25 . 6.10 17126 2179.60 636.53 26 . 3.05 17125 2182.65 636.63 27 . 6.10 17124 2188.75 636.56 28 . 3.05 17123 2191.80 636.58 29 . 3.05 17122 2194.84 636.69 30 . 18.29 17121 2213.13 636.78 31 W/L RB 15.12 17120 2228.26 637.16 32 . EXCAVATION 25.35 17119 2253.60 637.23 33 TOPEXCAVATION 7.00 17118 2260.61 636.58 34 C/L CHNL .6 3.07 17117 2263.67 636.76 35 . 4.56 17116 2268.23 637.01 36 TOE 3.30 17115 2271.53 638.25 37 HWM 2.74 17114 2274.27 638.69 38 TOP 8.91 17113 2283.18 639.18 39 TOP 3.34 17112 2286.51 638.49 40 TOE 1.83 17111 2288.35 638.53 41 TOP 1.55 17110 2289.89 637.17 42 TOE 5.49 17109 2295.38 637.31 43 TOE 3.56 17108 2298.94 639.13 44 TOP 13.60 17107 2312.55 639.66 45 TOE 4.58 17106 2317.12 641.25 46 TOP 11.69 17105 2328.82 640.29 47 TOE 16.66 17104 2345.48 640.71 48 . 25.47 17103 2370.95 640.75 49 TREELINE 17.90 17102 2388.85 642.46 50 TOE 11.60 17101 2400.45 645.56 51 TOP 1.79 17100 2402.24 645.60 52 SPIKE RB END NECHAKO RIVER X/S 18 PROJ#76FDC17 JULY 1978 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 18161 0.00 653.84 1 DUMMY 2000.00 18160 2000.00 653.84 2 TOP 7.56 18159 2007.56 648.44 3 TOE 2.32 18158 2009.88 648.03 4 REBAR LB 1.65 18157 2011.53 647.80 5 TOP 10.02 18156 2021.54 640.55 6 HWM 3.17 18155 2024.71 639.16 7 TOE 4.06 18154 2028.77 638.40 8 VEG EDGE 4.61 18153 2033.38 638.07 9 W/L LB 6.64 18152 2040.02 637.72 10 . 6.10 18151 2046.11 637.14 11 . 12.19 18150 2058.31 636.89 12 . 12.19 18149 2070.50 636.94 13 . 6.10 18148 2076.59 637.09 14 . 3.05 18147 2079.64 637.39 15 . 3.05 18146 2082.69 637.59 16 . 6.10 18145 2088.79 637.62 17 . 6.10 18144 2094.88 637.74 18 . 6.10 18143 2100.98 637.94 19 . 6.10 18142 2107.07 638.14 20 W/L 2.12 18141 2109.20 638.28 21 BAR 2.74 18140 2111.94 638.09 22 0.5W 3.68 18139 2115.62 638.33 23 SANDBAR 5.50 18138 2121.12 638.14 24 0.4 W 7.08 18137 2128.19 638.21 25 SANDBAR 4.89 18136 2133.09 638.28 26 W/L SANDBAR 7.45 18135 2140.54 638.44 27 . 6.10 18134 2146.63 638.32 28 . 6.10 18133 2152.73 638.27 29 . 3.05 18132 2155.78 638.34 30 . 3.05 18131 2158.83 638.26 31 . 6.10 18130 2164.92 638.05 32 . 3.05 18129 2167.97 637.80 33 . 3.05 18128 2171.02 637.75 34 . 6.10 18127 2177.11 637.75 35 . 6.10 18126 2183.21 637.80 36 . 3.05 18125 2186.26 637.65 37 . 10.67 18124 2196.93 637.70 38 . 8.23 18123 2205.16 637.55 39 . 8.53 18122 2213.69 637.85 40 . 6.10 18121 2219.79 637.45 41 . 3.66 18120 2223.44 637.55 42 . 7.62 18119 2231.06 637.35 43 . 10.06 18118 2241.12 637.65 44 . 6.10 18117 2247.22 638.03 45 . 6.10 18116 2253.31 638.29 46 . 3.05 18115 2256.36 638.55 47 W/L RB 1.96 18114 2258.33 638.48 48 SANDBAR 4.78 18113 2263.11 638.18 49 .7 D 4.58 18112 2267.70 638.23 50 W/L 6.30 18111 2273.99 638.84 51 VEG EDGE 3.25 18110 2277.24 639.15 52 TOE HWM 12.25 18109 2289.50 649.66 53 TOP STEEP BANK 2.47 18108 2291.96 649.67 54 BOLT RB 1.19 18107 2293.15 649.67 55 TOP 3.35 18106 2296.50 648.46 56 TOE 17.37 18105 2313.87 647.07 57 TOE 5.79 18104 2319.67 648.60 58 TOP 4.27 18103 2323.94 648.41 59 TOE 1.83 18102 2325.76 649.33 60 TOP 3.05 18101 2328.81 649.87 61 TOE RAILWAY 2.74 18100 2331.55 650.82 62 TOP RAILWAY END