THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. X/S 1 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 345.70 0 DUMMY 2000.00 9400 2000.00 345.70 1 ON SLOPE 11.28 9401 2011.28 343.20 2 TOE BANK 8.23 9402 2019.51 342.99 3 . 32.92 9403 2052.43 342.38 4 . 53.64 9404 2106.07 342.04 5 . 20.42 9405 2126.49 341.46 6 GL AT NT1L 11.58 9406 2138.07 341.25 7 WL AUG.6-71 7.27 9407 2145.34 340.64 8 . 1.93 9408 2147.27 340.58 9 . 11.43 9409 2158.70 339.39 10 . 22.08 9410 2180.78 337.93 11 . 12.86 9411 2193.64 337.59 12 . 9.09 9412 2202.73 337.68 13 . 5.72 9413 2208.46 337.59 14 . 7.49 9414 2215.95 337.99 15 . 10.76 9415 2226.71 337.93 16 . 21.79 9416 2248.49 337.96 17 . 21.00 9417 2269.50 337.93 18 . 22.75 9418 2292.25 337.96 19 . 23.80 9419 2316.05 337.96 20 . 22.57 9420 2338.63 337.84 21 . 25.79 9421 2364.42 337.53 22 . 20.84 9422 2385.26 337.35 23 . 15.56 9423 2400.82 336.56 24 . 10.91 9424 2411.73 338.51 25 . 15.60 9425 2427.32 341.25 26 WL RB 3.96 9426 2431.29 342.20 27 HWM 2.44 9427 2433.72 342.84 28 . JOIN 9400-9427 S 50d57'49" W 433.72 END X/S 2 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 342.03 0 DUMMY 2000.00 9430 2000.00 342.03 1 TOP BANK 1.52 9431 2001.52 340.64 2 TOE BANK 16.76 9432 2018.29 340.83 3 . 17.37 9433 2035.66 341.13 4 1.00 30.48 9434 2066.14 341.43 5 WL BAR 31.40 9435 2097.54 341.60 6 BAR 21.95 9436 2119.49 341.52 7 GL AT NT2R 14.02 9437 2133.51 341.37 8 WL AUG.6-71 17.98 9438 2151.49 340.97 9 1.33 53.95 9439 2205.44 341.17 10 0.70 8.58 9440 2214.02 340.82 11 . 2.32 9441 2216.34 340.67 12 . 4.70 9442 2221.04 340.51 13 . 7.42 9443 2228.46 340.27 14 . 9.55 9444 2238.01 340.36 15 . 23.41 9445 2261.42 340.36 16 . 31.34 9446 2292.76 339.57 17 . 23.34 9447 2316.10 338.50 18 . 16.55 9448 2332.65 338.01 19 . 25.08 9449 2357.73 337.40 20 . 7.89 9450 2365.62 336.89 21 . 16.33 9451 2381.95 336.86 22 . 15.34 9452 2397.29 336.67 23 . 10.45 9453 2407.74 336.43 24 . 8.93 9454 2416.66 335.88 25 . 5.49 9455 2422.15 336.15 26 . 7.42 9456 2429.58 335.85 27 . 5.38 9457 2434.96 335.97 28 . 11.24 9458 2446.20 339.08 29 . 1.99 9459 2448.19 339.77 30 5.00 2.13 9460 2450.33 340.66 31 2.10 0.61 9461 2450.94 341.28 32 WL AUG.7-71 1.22 9462 2452.16 341.86 33 GL AT 2R 5.49 9463 2457.64 345.62 34 TOP BANK JOIN 9430-9463 S 68d37'28" W 457.64 END X/S 3 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 342.54 0 DUMMY 2000.00 9470 2000.00 342.54 1 IN BUSH 3.05 9471 2003.05 342.48 2 IN BUSH 4.57 9472 2007.62 342.52 3 IN BUSH 4.57 9473 2012.19 342.50 4 IN BUSH 4.57 9474 2016.76 342.28 5 GL AT NT3L 5.79 9475 2022.56 341.36 6 WL AUG.7-71 2.59 9476 2025.15 340.84 7 1.70 2.59 9477 2027.74 340.23 8 2.70 11.60 9478 2039.34 340.26 9 . 13.13 9479 2052.47 340.20 10 . 6.15 9480 2058.62 339.86 11 . 7.83 9481 2066.45 339.65 12 . 11.87 9482 2078.32 340.20 13 . 31.93 9483 2110.25 340.35 14 . 22.16 9484 2132.41 339.16 15 . 9.91 9485 2142.32 339.29 16 . 6.96 9486 2149.27 339.35 17 . 14.60 9487 2163.88 338.77 18 . 15.49 9488 2179.37 338.52 19 . 35.28 9489 2214.64 337.85 20 . 33.82 9490 2248.46 337.00 21 . 32.99 9491 2281.45 336.42 22 . 12.20 9492 2293.65 336.33 23 . 12.60 9493 2306.25 337.15 24 . 20.28 9494 2326.53 339.96 25 . 8.85 9495 2335.38 340.53 26 2.70 3.54 9496 2338.92 341.36 27 WL AUG.7-71 1.34 9497 2340.26 341.88 28 GL AT NT3R 4.57 9498 2344.83 343.39 29 TOE BANK 3.35 9499 2348.18 345.51 30 TOP BANK JOIN 9470-9499 S 66d33'31" W 348.18 END X/S 4 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 345.72 0 DUMMY 2000.00 11731 2000.00 345.72 1 REF 2000 SURVEY 42.99 9500 2042.99 344.75 2 TOP BANK 0.91 9501 2043.90 343.35 3 TOE 7.62 9502 2051.53 341.89 4 GL AT NT4L 7.01 9503 2058.54 341.41 5 WL AUG.7-71 1.83 9504 2060.36 340.93 6 1.55 3.35 9505 2063.72 339.93 7 4.82 3.16 9506 2066.88 339.40 8 . 12.13 9507 2079.01 337.29 9 . 5.52 9508 2084.53 337.14 10 . 13.68 9509 2098.20 337.14 11 . 14.70 9510 2112.90 336.23 12 . 26.60 9511 2139.50 336.59 13 . 19.69 9512 2159.19 336.90 14 . 10.19 9513 2169.39 336.90 15 . 16.35 9514 2185.74 336.90 16 . 6.85 9515 2192.59 337.08 17 . 20.10 9516 2212.69 338.12 18 . 5.67 9517 2218.36 338.42 19 . 10.07 9518 2228.43 340.25 20 . 4.04 9519 2232.47 340.50 21 . 21.26 9520 2253.73 341.10 22 . 18.90 9521 2272.64 341.04 23 . 17.69 9522 2290.33 340.95 24 . 18.46 9523 2308.78 340.86 25 . 20.50 9524 2329.28 340.77 26 . 14.60 9525 2343.88 340.80 27 . 13.04 9526 2356.92 340.86 28 . 8.56 9527 2365.48 340.46 29 . 3.23 9528 2368.71 341.41 30 WL AUG.7-71 1.22 9529 2369.93 341.95 31 GL AT NT 4R 10.97 9530 2380.90 341.96 32 TOP BANK 2.13 9531 2383.04 341.01 33 TOE 1.42 3.66 9532 2386.69 340.63 34 2.60 2.74 9533 2389.44 340.86 35 TOE 1.90 3.35 9534 2392.79 341.83 36 TOP 20.42 X/S 4 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 9535 2413.21 343.17 37 TOE JOIN 11731-9535 N 89d54'44" W 413.21 END X/S 5 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 347.60 0 DUMMY 2000.00 11848 2000.00 347.60 1 REF 2000 SURVEY 82.88 9540 2082.88 345.41 2 TOP BK RIP RPAP 7.62 9541 2090.50 343.45 3 GL AT NT5L 1.22 9542 2091.72 341.49 4 WL AUG.7-71 2.44 9543 2094.16 339.44 5 6.70 8.20 9544 2102.36 338.19 6 . 1.58 9545 2103.93 337.77 7 . 4.21 9546 2108.14 338.10 8 . 7.30 9547 2115.44 338.10 9 . 26.99 9548 2142.42 338.41 10 . 28.65 9549 2171.08 338.62 11 . 8.55 9550 2179.63 338.01 12 . 9.09 9551 2188.72 338.19 13 . 16.89 9552 2205.61 338.16 14 . 29.05 9553 2234.67 338.86 15 . 44.78 9554 2279.44 340.14 16 . 39.42 9555 2318.86 340.24 17 . 34.53 9556 2353.39 340.45 18 . 10.40 9557 2363.79 340.72 19 . 10.05 9558 2373.84 340.57 20 . 10.74 9559 2384.58 340.69 21 . 12.26 9560 2396.83 340.78 22 . 22.38 9561 2419.21 340.57 23 . 33.18 9562 2452.39 340.66 24 . 20.51 9563 2472.91 341.00 25 . 2.48 9564 2475.39 341.15 26 1.10 2.59 9565 2477.98 341.49 27 WL AUG.7-71 1.98 9566 2479.96 341.87 28 GL AT NT5R 4.57 9567 2484.53 342.62 29 TOE 4.88 9568 2489.41 345.54 30 TOP BANK JOIN 11848-9568 S 74d32'37" W 489.41 END X/S 6 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 343.42 0 DUMMY 2000.00 9570 2000.00 343.42 1 IN FIELD 12.19 9571 2012.19 342.11 2 GL AT NT6L 1.58 9572 2013.78 341.54 3 WL AUG.7-71 2.07 9573 2015.85 341.00 4 1.75 11.08 9574 2026.93 340.68 5 . 18.50 9575 2045.43 337.15 6 . 18.87 9576 2064.30 337.09 7 . 4.96 9577 2069.27 337.33 8 . 21.64 9578 2090.90 338.06 9 . 26.79 9579 2117.70 338.92 10 . 26.87 9580 2144.57 339.22 11 . 24.36 9581 2168.93 338.73 12 . 26.11 9582 2195.04 338.86 13 . 9.40 9583 2204.44 338.55 14 . 19.07 9584 2223.51 339.16 15 . 10.76 9585 2234.27 338.61 16 . 9.69 9586 2243.96 338.86 17 . 16.42 9587 2260.38 338.95 18 . 6.26 9588 2266.64 338.73 19 . 8.33 9589 2274.97 338.34 20 . 6.91 9590 2281.88 338.31 21 . 5.31 9591 2287.18 340.07 22 . 5.78 9592 2292.97 340.44 23 . 2.51 9593 2295.48 341.54 24 WL AUG.7-71 2.01 9594 2297.49 342.87 25 GL AT NT6R 4.27 9595 2301.76 345.56 26 TOP BANK JOIN 9570-9595 S 78d11'28" W 301.76 END X/S 7 NORTH THOMPSON RIVER AT KAMLOOPS PROJ.# 71-23 AUG. 6, 1971 POINT DISTANCE CHAINAGE ELEVATION NO. REMARKS 0.00 352.05 0 DUMMY 2000.00 14200 2000.00 352.05 1 REF 2000 SURVEY 120.14 9600 2120.14 342.92 2 . 4.88 9601 2125.02 342.87 3 GL AT NT7L TPOPB 1.68 9602 2126.70 341.56 4 WL AUG.7-71 1.98 9603 2128.68 340.00 5 5.10 4.31 9604 2132.99 338.97 6 . 9.60 9605 2142.58 338.42 7 . 17.53 9606 2160.11 337.75 8 . 13.56 9607 2173.67 338.18 9 . 15.64 9608 2189.31 338.24 10 . 15.07 9609 2204.38 338.30 11 . 18.44 9610 2222.82 338.66 12 . 9.40 9611 2232.22 338.63 13 . 14.99 9612 2247.21 338.79 14 . 13.11 9613 2260.32 338.69 15 . 15.06 9614 2275.38 338.60 16 . 20.78 9615 2296.15 338.57 17 . 15.87 9616 2312.02 338.48 18 . 14.14 9617 2326.16 338.27 19 . 17.81 9618 2343.97 338.27 20 . 12.89 9619 2356.85 338.36 21 . 12.89 9620 2369.75 338.02 22 . 4.85 9621 2374.60 337.87 23 . 9.20 9622 2383.80 338.60 24 . 8.20 9623 2392.00 340.46 25 3.60 1.52 9624 2393.53 341.56 26 WL AUG.7-71 1.52 9625 2395.05 342.42 27 GL AT NT7R 1.52 9626 2396.57 343.76 28 TOP BANK 7.47 9627 2404.04 344.34 29 . JOIN 14200-9627 S 76d29'53" W 404.04 END