THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. SALMON RIVER (PRINCE GEORGE) XS1 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 157 257 0.00 578.86 1 DUMMY 1979 5000.00 156 256 5000.00 578.86 2 END XS-1 14.50 155 255 5014.50 578.90 3 TOP 2.70 154 254 5017.19 578.05 4 BP 3.40 153 253 5020.59 577.87 5 REBAR L/B 2.30 152 252 5022.89 577.52 6 TOP 0.92 151 251 5023.81 576.88 7 W/L LB 1700 12.20 150 250 5036.01 575.22 8 D-1.65W 17.50 149 249 5053.52 574.86 9 D-2.0 W 17.41 148 248 5070.92 575.27 10 D-1.60W 18.01 147 247 5088.93 575.92 11 D-0.95W 28.00 146 246 5116.93 576.19 12 D-0.9 W 1.10 145 245 5118.04 575.69 13 D-1.2 W 4.80 144 244 5122.83 575.32 14 LOG JAM/MAIN CH 4.09 143 243 5126.93 575.41 15 4.32 142 242 5131.25 575.87 16 6.70 141 241 5137.94 575.24 17 6.09 140 240 5144.03 575.81 18 3.89 139 239 5147.92 575.98 19 1.20 138 238 5149.12 576.64 20 0.10 137 237 5149.23 576.84 21 3.40 136 236 5152.63 577.05 22 0.91 135 235 5153.54 576.73 23 2.42 134 234 5155.95 576.58 24 3.02 133 233 5158.97 576.30 25 5.80 132 232 5164.76 576.56 26 5.88 131 231 5170.64 575.78 27 4.10 130 230 5174.74 575.59 28 LOG JAM TOE 1.0W SALMON RIVER (PRINCE GEORGE) XS1 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.70 129 229 5176.44 576.56 29 W/L 1.10 128 228 5177.54 577.27 30 TOP 8.80 127 227 5186.34 577.36 31 TOP 1.54 126 226 5187.88 576.90 32 TOE 1.11 125 225 5188.99 576.73 33 TOP 0.20 124 224 5189.19 576.57 34 W/L 1.88 123 223 5191.07 575.10 35 TOE 1.5W 5.90 122 222 5196.97 574.00 36 C/L 2.5W 5.60 121 221 5202.57 575.63 37 TOE .95W 1.12 120 220 5203.69 576.57 38 W/L 0.40 119 219 5204.10 577.35 39 TOP NHW 13.50 118 218 5217.60 577.20 40 TOE 2.30 117 217 5219.89 578.01 41 TOP 2.30 116 216 5222.19 578.38 42 GL REBAR R/B 3.00 115 215 5225.19 578.62 43 TOP 5.30 114 214 5230.49 578.39 44 8.89 113 213 5239.38 578.12 45 16.59 112 212 5255.97 577.86 46 GRD 9.91 111 211 5265.88 577.93 47 TOP 5.09 110 210 5270.97 577.19 48 TOE 9.00 109 209 5279.97 577.13 49 TOP 1.50 108 208 5281.48 576.57 50 W/L 0.61 107 207 5282.08 576.23 51 TOE -0.35W 1.39 106 206 5283.47 575.76 52 C/L CHAN -0.80W 1.70 105 205 5285.18 575.93 53 TOE -.66W 0.40 104 204 5285.58 576.56 54 W/L 4.41 103 203 5289.98 576.76 55 1.61 102 202 5291.59 577.15 56 SALMON RIVER (PRINCE GEORGE) XS1 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.90 101 201 5295.49 577.42 57 TOE 2.80 100 200 5298.29 578.29 58 TOP FLAT200M/RIS JOIN 157-100 S27 39 00W 5298.292 SALMON RIVER (PRINCE GEORGE) XS2 79FDC5 JULY 13 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 205 405 0.00 584.17 1 DUMMY 1979 5000.00 204 404 5000.00 584.17 2 TOP SHELF FLAT B 5.21 203 403 5005.21 581.03 3 1.90 202 402 5007.12 580.62 4 ON SLOPE 6.09 201 401 5013.20 578.99 5 TOE 3.90 200 400 5017.11 579.00 6 14.00 199 399 5031.10 579.23 7 9.00 198 398 5040.10 579.11 8 19.10 197 397 5059.20 578.92 9 15.20 196 396 5074.40 579.20 10 11.00 195 395 5085.40 579.27 11 SPIKE 7.30 194 394 5092.70 578.83 12 TOP 1.00 193 393 5093.70 578.19 13 0.40 192 392 5094.10 577.39 14 W/L TOE BANK 1.30 191 391 5095.40 576.94 15 0.45W 1.90 190 390 5097.30 576.99 16 0.4W 2.00 189 389 5099.30 576.51 17 0.9W 1.00 188 388 5100.30 576.59 18 0.8W 3.80 187 387 5104.10 577.36 19 W/L BK CHANNEL 6.60 186 386 5110.70 577.61 20 7.10 185 385 5117.80 577.30 21 SWAMP 2.20 184 384 5120.00 577.67 22 GRD 9.30 183 383 5129.30 577.98 23 GRD 1.00 182 382 5130.30 578.52 24 GRD 4.00 181 381 5134.30 578.74 25 GRD 11.20 180 380 5145.50 578.31 26 TOP CHANNEL 3.00 179 379 5148.50 577.65 27 C/L 3.50 178 378 5152.00 578.38 28 TOP CHANNEL SALMON RIVER (PRINCE GEORGE) XS2 79FDC5 JULY 13 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8.30 177 377 5160.30 578.50 29 3.40 176 376 5163.70 578.24 30 TOP 3.40 175 375 5167.10 577.61 31 C/L CHANNEL 4.00 174 374 5171.10 578.39 32 5.40 173 373 5176.50 578.58 33 SPIKE 0.40 172 372 5176.90 578.55 34 TOP EDGE CHANNEL 8.10 171 371 5185.00 577.72 35 TOP 3.20 170 370 5188.20 577.61 36 TOE 2.70 169 369 5190.90 578.43 37 TOP DRY CHANNEL 6.90 168 368 5197.80 578.43 38 GRD 4.50 167 367 5202.30 578.02 39 GRD 2.90 166 366 5205.20 578.40 40 GRD 13.00 165 365 5218.20 578.10 41 GRD 8.60 164 364 5226.80 578.48 42 GRD 4.80 163 363 5231.60 578.02 43 GRD 18.70 162 362 5250.30 578.35 44 TOP 9.90 161 361 5260.20 577.64 45 TOE 2.10 160 360 5262.30 577.68 46 TOP DRY CHANNEL 23.90 159 359 5286.20 578.46 47 9.50 158 358 5295.70 578.48 48 SPIKE 23.99 157 357 5319.69 578.36 49 GRD 6.60 156 356 5326.28 578.07 50 GRD 17.80 155 355 5344.08 577.98 51 GRD 11.00 154 354 5355.08 578.13 52 GRD 9.00 153 353 5364.08 578.08 53 TOP 3.20 152 352 5367.29 577.03 54 TOE 2.90 151 351 5370.19 577.32 55 4.20 150 350 5374.39 577.13 56 C/L DRY CHANNEL SALMON RIVER (PRINCE GEORGE) XS2 79FDC5 JULY 13 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.10 149 349 5376.49 577.49 57 TOP 10.00 148 348 5386.49 577.37 58 TOP 5.10 147 347 5391.58 577.12 59 C/L DRY CHANNEL 7.40 146 346 5398.98 577.49 60 15.50 145 345 5414.48 577.56 61 22.00 144 344 5436.48 577.61 62 TOP 3.10 143 343 5439.58 577.19 63 C/L 2.40 142 342 5441.98 577.78 64 TOP 4.50 141 341 5446.48 577.62 65 10.20 140 340 5456.68 577.80 66 GL REBAR L/B 2.99 139 339 5459.67 577.76 67 TOP 1.20 138 338 5460.88 577.48 68 BP 0.80 137 337 5461.68 576.91 69 W/L L/B 0.98 136 336 5462.66 576.17 70 TOE 0.72W 2.99 135 335 5465.65 575.67 71 2.02 134 334 5467.67 575.87 72 2.00 133 333 5469.67 576.19 73 2.99 132 332 5472.66 576.46 74 BP 0.44W 3.79 131 331 5476.45 576.55 75 6.40 130 330 5482.86 576.47 76 7.79 129 329 5490.65 576.20 77 7.07 128 328 5497.72 576.02 78 3.46 127 327 5501.18 576.02 79 2.20 126 326 5503.38 576.05 80 TOE 0.85W 0.30 125 325 5503.68 576.91 81 W/L R/B BAR 1.80 124 324 5505.48 577.42 82 BP 1.20 123 323 5506.68 577.60 83 79 HI WATER 1.00 122 322 5507.68 577.78 84 TOP SALMON RIVER (PRINCE GEORGE) XS2 79FDC5 JULY 13 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 14.00 121 321 5521.68 577.85 85 2.00 120 320 5523.68 577.65 86 1.00 119 319 5524.68 577.37 87 3.20 118 318 5527.88 576.63 88 TOE D=0.26M 1.80 117 317 5529.68 576.66 89 TOE D=0.23M 2.00 116 316 5531.68 576.89 90 W/L 3.00 115 315 5534.68 577.09 91 6.00 114 314 5540.68 577.12 92 5.00 113 313 5545.68 576.90 93 W/L R/B ON BAR 9.00 112 312 5554.68 576.33 94 BP D=0.59M 2.00 111 311 5556.68 575.91 95 D=1.00M 7.00 110 310 5563.68 575.58 96 D=1.31M 8.00 109 309 5571.68 575.35 97 D=1.65M 7.00 108 308 5578.67 574.29 98 4.01 107 307 5582.68 573.89 99 4.00 106 306 5586.68 576.09 100 TOE D=0.8M 0.50 105 305 5587.18 576.91 101 W/L R/B 1.49 104 304 5588.68 578.05 102 NAT BDY 0.99 103 303 5589.67 578.46 103 TOE 0.95 102 302 5590.62 580.63 104 TOP 2.31 101 301 5592.93 580.98 105 REBAR R/B 6.65 100 300 5599.59 581.17 106 GRD LVL FLAT BYD JOIN 205-195 S74 39 00W 5085.401 JOIN 195-100 S06 39 00W 514.185 SALMON RIVER (PRINCE GEORGE) XS3 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 201 401 0.00 583.02 1 DUMMY 1979 5000.00 200 400 5000.00 583.02 2 ON SLOPE END 3 1.40 199 399 5001.40 582.06 3 TOE STEEP SLOPE 3.00 198 398 5004.40 581.30 4 0.60 197 397 5005.00 581.00 5 TOE 2.20 196 396 5007.20 580.65 6 1.20 195 395 5008.40 580.40 7 TOE D0.05 7.80 194 394 5016.20 580.45 8 WL STANDING 12.10 193 393 5028.30 581.09 9 3.40 192 392 5031.70 581.49 10 TOP EDGE BAR 8.30 191 391 5040.00 581.65 11 TOP DRY CHAN. 0.70 190 390 5040.70 581.25 12 TOE DRY CHAN. 6.60 189 389 5047.30 581.24 13 [ DRY CHAN. 8.70 188 388 5056.00 581.37 14 TOE DRY CHAN. 1.80 187 387 5057.80 582.23 15 TOP DRY CHAN. 8.70 186 386 5066.50 582.40 16 GRND. 18.50 185 385 5085.00 581.92 17 TOE 1.60 184 384 5086.60 582.76 18 TOP 5.00 183 383 5091.60 582.74 19 GRND. 15.30 182 382 5106.90 582.28 20 TOP 2.40 181 381 5109.30 580.82 21 [ 3.60 180 380 5112.90 581.95 22 TOP 25.50 179 379 5138.40 582.38 23 GRND. 23.20 178 378 5161.60 582.17 24 SPIKE 15.00 177 377 5176.60 582.08 25 GRND 26.80 176 376 5203.40 581.87 26 GRND. 10.70 175 375 5214.10 582.22 27 GRND. 39.20 174 374 5253.30 582.17 28 GRND. SALMON RIVER (PRINCE GEORGE) XS3 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 39.30 173 373 5292.59 582.15 29 GRND. 33.70 172 372 5326.30 582.29 30 GRND. 29.70 171 371 5356.00 582.24 31 BRK. 17.61 170 370 5373.61 581.94 32 BRK. 11.40 169 369 5385.00 581.15 33 BRK. 4.90 168 368 5389.90 581.04 34 TOP 1.00 167 367 5390.90 580.20 35 TOE 2.20 166 366 5393.10 580.45 36 TOE 1.50 165 365 5394.59 581.57 37 TOP 8.60 164 364 5403.19 581.53 38 SPIKE 2.00 163 363 5405.19 581.44 39 TOP BANK 1.90 162 362 5407.09 580.86 40 BREAK 2.40 161 361 5409.49 580.68 41 TOP 0.60 160 360 5410.09 580.24 42 TOE 2.30 159 359 5412.40 579.99 43 CENTRE LINE D.15 1.50 158 358 5413.90 580.14 44 TOE 2.60 157 357 5416.49 581.15 45 TOP 3.90 156 356 5420.39 581.05 46 TOP 1.20 155 355 5421.59 580.60 47 TOE 2.60 154 354 5424.19 580.75 48 TOE 1.70 153 353 5425.90 581.63 49 BREAK 5.00 152 352 5430.89 580.47 50 BREAK 4.40 151 351 5435.29 581.28 51 TOP 1.20 150 350 5436.49 580.82 52 TOE 6.00 149 349 5442.49 580.96 53 TOE 0.90 148 348 5443.39 581.46 54 TOP 6.20 147 347 5449.59 581.32 55 TOP 0.70 146 346 5450.29 580.39 56 TOE SALMON RIVER (PRINCE GEORGE) XS3 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.30 145 345 5453.60 580.55 57 CENTRE 3.40 144 344 5456.99 580.75 58 TOE 1.80 143 343 5458.79 581.58 59 TOP DRY CHAN. 1.90 142 342 5460.69 581.29 60 LOG JAM 11.90 141 341 5472.59 581.65 61 LOG JAM 14.01 140 340 5486.60 581.04 62 LOG JAM 7.90 139 339 5494.50 581.35 63 LOG JAM 9.80 138 338 5504.31 581.51 64 LOG JAM 14.90 137 337 5519.21 580.75 65 LOG JAM 10.19 136 336 5529.40 581.06 66 LOG JAM 12.80 135 335 5542.20 581.68 67 BREAK 19.60 134 334 5561.79 582.20 68 GL BOLT L/B 3.50 133 333 5565.29 582.20 69 TOP 1.80 132 332 5567.09 580.70 70 NAT BNDY 1.27 131 331 5568.36 579.99 71 TOE 7.13 130 330 5575.49 579.99 72 6.90 129 329 5582.39 580.74 73 TOP 26.69 128 328 5609.08 581.12 74 7.69 127 327 5616.77 580.84 75 5.10 126 326 5621.87 581.22 76 9.00 125 325 5630.87 581.20 77 5.92 124 324 5636.78 581.63 78 TOP 1.00 123 323 5637.78 580.62 79 TOE 23.60 122 322 5661.38 581.23 80 15.50 121 321 5676.88 581.28 81 TOP BAR 3.39 120 320 5680.27 579.73 82 W/L LB 1313 2.09 119 319 5682.37 578.96 83 -0.80 0.80 118 318 5683.16 578.85 84 -0.95 SALMON RIVER (PRINCE GEORGE) XS3 79FDC5 JULY 12 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.00 117 317 5686.16 578.30 85 -1.20 1.60 116 316 5687.76 578.17 86 -1.3 5.71 115 315 5693.47 579.08 87 -0.75W 0.70 114 314 5694.17 579.09 88 -0.65W 2.50 113 313 5696.67 579.44 89 -0.3W 2.41 112 312 5699.08 579.73 90 W/L RB MCHAN1303 18.30 111 311 5717.38 580.54 91 TOP BAR 8.09 110 310 5725.47 580.04 92 3.72 109 309 5729.19 580.12 93 2.80 108 308 5731.99 580.95 94 3.40 107 307 5735.39 581.14 95 1.30 106 306 5736.69 581.69 96 16.90 105 305 5753.59 581.13 97 2.60 104 304 5756.19 581.41 98 TOE 3.29 103 303 5759.48 583.13 99 NAT BNDY 1.08 102 302 5760.56 584.23 100 TOP BANK 2.50 101 301 5763.06 584.44 101 REBAR RB 9.29 100 300 5772.34 583.83 102 FLAT 30M RISE BY JOIN 201-100 S20 39 00W 5772.343 SALMON RIVER (PRINCE GEORGE) XS4 79FDC5 JULY 11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 151 251 0.00 590.59 1 DUMMY 1979 5000.00 150 250 5000.00 590.59 2 REBAR L/B 4.00 149 249 5004.00 590.43 3 2.11 148 248 5006.11 589.57 4 TOP WING WALL 1.03 147 247 5007.14 589.43 5 TOP WING WALL 0.18 146 246 5007.32 586.92 6 TOE WING WALL 1.43 145 245 5008.75 584.38 7 BREAK 2.50 144 244 5011.26 582.90 8 W/L L/B 1421HRS. 2.27 143 243 5013.53 581.80 9 1.10D TOE 6.19 142 242 5019.72 581.12 10 1.70D 1.74 141 241 5021.45 581.68 11 1.20D 1.48 140 240 5022.93 582.88 12 W/L 0.03 139 239 5022.96 583.39 13 TOP CRIB 1.96 138 238 5024.92 583.66 14 TOE PILLAR 3.66 137 237 5028.58 582.93 15 TOE PILLAR 0.12 136 236 5028.69 582.84 16 BREAK 0.60 135 235 5029.30 582.80 17 W/L 0.73 134 234 5030.03 581.20 18 1.67D TOE CRIB 0.93 133 233 5030.95 581.42 19 1.45D 2.50 132 232 5033.46 582.23 20 0.70D 2.79 131 231 5036.24 582.93 21 W/L 1.21 130 230 5037.45 582.95 22 BAR 1.62 129 229 5039.07 582.94 23 W/L MAIN CHAN L 0.97 128 228 5040.05 582.61 24 0.35D 2.23 127 227 5042.28 582.03 25 0.90D 1.82 126 226 5044.10 581.75 26 1.30D 0.56 125 225 5044.66 581.94 27 1.00D 2.99 124 224 5047.65 582.26 28 0.75D SALMON RIVER (PRINCE GEORGE) XS4 79FDC5 JULY 11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.22 123 223 5053.87 582.21 29 0.70D 7.70 122 222 5061.57 582.41 30 0.60D 10.39 121 221 5071.96 582.27 31 0.75D 2.47 120 220 5074.43 582.60 32 0.45D 4.29 119 219 5078.72 583.10 33 W/L MAIN CHAN.R. 3.72 118 218 5082.44 583.31 34 BAR 3.79 117 217 5086.23 582.99 35 TOE CONC. PILLAR 3.38 116 216 5089.61 582.97 36 W/L 0.28 115 215 5089.89 582.83 37 TOE PILLAR 1.78 114 214 5091.67 582.65 38 TOE PILLAR CRIB 0.75 113 213 5092.43 582.44 39 0.45D 2.24 112 212 5094.66 582.00 40 TOE 0.84D 1.62 111 211 5096.28 582.95 41 WATER LEV. R/B 1.20 110 210 5097.48 583.30 42 TOE BANK 0.34 109 209 5097.82 583.93 43 BREAK 1.34 108 208 5099.16 584.52 44 NAT. BDY. 2.42 107 207 5101.58 586.29 45 TOP 1.68 106 206 5103.26 586.29 46 BREAK 1.98 105 205 5105.24 587.02 47 BREAK 2.18 104 204 5107.42 587.15 48 TOE WING WALL 0.29 103 203 5107.71 589.46 49 DITTO 0.70 102 202 5108.40 589.24 50 EDGE WING WALL 4.20 101 201 5112.60 589.56 51 BREAK 3.30 100 200 5115.90 590.43 52 GL BOLT R/B JOIN 151-100 S19 39 00W 5115.900 SALMON RIVER (PRINCE GEORGE) XS5 79FDC5 JULY 11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 145 245 0.00 590.27 1 DUMMY 1979 5000.00 144 244 5000.00 590.27 2 REBAR L/B 1.90 143 243 5001.90 589.39 3 BREAK 2.80 142 242 5004.70 589.71 4 TOP WING WALL 1.11 141 241 5005.81 589.84 5 TOP WING WALL 0.63 140 240 5006.44 585.97 6 TOE WING WALL 1.29 139 239 5007.73 584.86 7 BREAK 1.21 138 238 5008.94 583.91 8 BREAK 2.07 137 237 5011.01 582.90 9 W/L R/B 1505 HR 0.62 136 236 5011.63 582.23 10 0.65D 1.48 135 235 5013.12 581.32 11 1.60D 3.42 134 234 5016.54 580.69 12 2.20D 3.56 133 233 5020.09 580.92 13 2.00D 1.02 132 232 5021.12 582.97 14 W/L 1500 HR 0.20 131 231 5021.32 583.18 15 1.68 130 230 5023.00 582.97 16 TOE PILLAR 3.96 129 229 5026.95 582.71 17 TOE PILLAR 1.88 128 228 5028.84 583.34 18 TOP CRIB 0.11 127 227 5028.95 582.94 19 W/L 0.08 126 226 5029.03 580.84 20 2.10D TOE PILLAR 1.20 125 225 5030.23 581.21 21 1.70D 1.65 124 224 5031.88 581.93 22 1.00D 3.05 123 223 5034.93 582.92 23 W/L BAR 1452 0.87 122 222 5035.80 583.09 24 BAR 4.09 121 221 5039.89 583.36 25 BAR 2.08 120 220 5041.98 583.04 26 W/L BAR 1450 2.61 119 219 5044.59 582.59 27 0.50D 4.10 118 218 5048.69 582.07 28 0.95D SALMON RIVER (PRINCE GEORGE) XS5 79FDC5 JULY 11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.19 117 217 5053.88 582.08 29 0.95D 5.39 116 216 5059.27 582.49 30 0.50D 11.69 115 215 5070.96 582.63 31 0.45D 7.47 114 214 5078.42 582.17 32 0.90D 5.68 113 213 5084.10 582.28 33 0.90D TOE PILLAR 1.53 112 212 5085.64 580.54 34 2.20D 3.28 111 211 5088.92 581.36 35 1.70D TOE PILLAR 4.04 110 210 5092.97 582.28 36 0.85D 3.10 109 209 5096.07 583.10 37 W/L R/B 1440 HR 2.38 108 208 5098.44 584.69 38 NAT.BDY 2.44 107 207 5100.89 586.58 39 TOP BANK 2.56 106 206 5103.45 586.68 40 BREAK 1.26 105 205 5104.71 587.51 41 BREAK 1.09 104 204 5105.80 587.77 42 TOE WING 0.60 103 203 5106.40 589.72 43 EDGE WING 0.30 102 202 5106.70 589.41 44 EDGE WING 2.70 101 201 5109.40 589.32 45 BRK. 3.50 100 200 5112.90 590.02 46 GL BOLT R/B JOIN 145-100 S20 39 00W 5112.899 SALMON RIVER (PRINCE GEORGE) XS6 79FDC5 JULY 11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 99 199 0.00 585.30 1 DUMMY 1979 5000.00 100 200 5000.00 585.30 2 GL BOLT L/B 10.04 101 201 5010.04 585.19 3 EDGE BAR 11.94 102 202 5021.97 584.95 4 EDGE BAR 2.49 103 203 5024.47 584.31 5 TOE 17.78 104 204 5042.25 584.10 6 TOE 2.21 105 205 5044.46 584.58 7 TOP 16.93 106 206 5061.39 584.63 8 BREAK 11.01 107 207 5072.39 583.88 9 BREAK 3.79 108 208 5076.19 583.32 10 W/L L/B 1542 11.89 109 209 5088.08 582.98 11 D0.4 4.30 110 210 5092.37 582.73 12 D0.6 3.60 111 211 5095.97 582.61 13 D0.7 1.98 112 212 5097.95 582.59 14 D0.8 4.10 113 213 5102.05 582.72 15 D0.6 4.19 114 214 5106.25 582.91 16 D0.4 9.00 115 215 5115.25 582.77 17 D0.57 0.91 116 216 5116.16 583.02 18 D0.27 1.31 117 217 5117.46 583.07 19 D0.26 TOE 0.21 118 218 5117.67 583.30 20 W/L R/B 1557 3.62 119 219 5121.29 584.99 21 NAT. BDY. 1.00 120 220 5122.29 587.19 22 BREAK 2.08 121 221 5124.37 588.00 23 TOP 5.57 122 222 5129.94 588.02 24 BOLT R/B JOIN 99-122 S02 20 00E 5129.938 SALMON RIVER (PRINCE GEORGE) XS7 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 154 254 0.00 597.07 1 DUMMY 1979 5000.00 153 253 5000.00 597.07 2 FLAT BEYOND 19.96 152 252 5019.96 596.15 3 TOP BANK 7.24 151 251 5027.20 591.68 4 ON SLOPE 9.41 150 250 5036.62 587.53 5 BP 4.00 149 249 5040.62 586.46 6 TOE SLOPE 2.00 148 248 5042.62 586.22 7 TOP 2.00 147 247 5044.62 585.59 8 W/L DITCH 1.00 146 246 5045.62 585.23 9 1.00 145 245 5046.62 585.24 10 6.00 144 244 5052.62 585.10 11 TOE 0.46 W 4.00 143 243 5056.62 584.76 12 8.00 142 242 5064.62 585.60 13 W/L DITCH 2.00 141 241 5066.62 587.16 14 TOP 24.00 140 240 5090.62 586.69 15 39.00 139 239 5129.62 587.22 16 38.70 138 238 5168.32 587.31 17 49.30 137 237 5217.62 587.22 18 35.00 136 236 5252.62 587.64 19 GL REBAR LB 6.00 135 235 5258.61 587.64 20 TOP BANK 1.39 134 234 5260.01 586.17 21 NAT BOUNDRY 2.42 133 233 5262.43 584.79 22 W/L TOE 4.06 132 232 5266.49 584.10 23 0.76 W 14.20 131 231 5280.69 584.81 24 W/L 22.88 130 230 5303.57 584.66 25 12.02 129 229 5315.59 584.99 26 TOE 4.49 128 228 5320.08 585.74 27 TOP 22.48 127 227 5342.57 586.12 28 TOP SALMON RIVER (PRINCE GEORGE) XS7 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.01 126 226 5343.58 585.89 29 0.98 125 225 5344.56 584.52 30 W/L L/B 3.98 124 224 5348.54 583.56 31 1.99 123 223 5350.53 582.84 32 8.01 122 222 5358.54 583.02 33 3.41 121 221 5361.94 583.39 34 5.62 120 220 5367.57 584.34 35 2.51 119 219 5370.08 584.53 36 W/L R/B 16:30 2.50 118 218 5372.58 584.62 37 2.33 117 217 5374.91 585.18 38 6.20 116 216 5381.10 584.98 39 4.01 115 215 5385.11 585.71 40 21.50 114 214 5406.61 585.77 41 9.00 113 213 5415.61 585.46 42 12.80 112 212 5428.41 586.09 43 SPIKE RB 47.00 111 211 5475.41 585.68 44 17.00 110 210 5492.41 585.85 45 37.00 109 209 5529.41 585.20 46 50.10 108 208 5579.50 585.32 47 TOP 2.91 107 207 5582.41 584.52 48 6.50 106 206 5588.91 585.02 49 22.50 105 205 5611.41 585.10 50 TOE 2.00 104 204 5613.41 585.41 51 NAT BOUNDRY 9.72 103 203 5623.12 589.87 52 BP 0.62 102 202 5623.74 591.53 53 TOP BANK 3.51 101 201 5627.25 591.46 54 REBAR R/B 15.01 100 200 5642.26 591.52 55 SLIGHT RISE JOIN 154-136 S17 20 00E 5252.616 JOIN 136-100 S30 20 00E 389.640 SALMON RIVER (PRINCE GEORGE) XS8 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 195 295 0.00 594.98 1 DUMMY 1979 5000.00 194 294 5000.00 594.98 2 STEEP BEYOND 4.98 193 293 5004.98 593.40 3 ON SLOPE 4.98 192 292 5009.96 591.55 4 TOE HILL 15.99 191 291 5025.95 592.21 5 13.99 190 290 5039.94 591.36 6 TOP 4.00 189 289 5043.93 590.04 7 EDGE SWAMP 23.00 188 288 5066.93 590.05 8 EDGE SWAMP 25.20 187 287 5092.13 590.09 9 EDGE SWAMP 22.80 186 286 5114.93 590.92 10 21.24 185 285 5136.17 590.82 11 28.48 184 284 5164.65 591.10 12 23.28 183 283 5187.93 590.74 13 SPIKE 9.01 182 282 5196.94 590.90 14 TOP 1.99 181 281 5198.93 590.36 15 BP 6.00 180 280 5204.93 589.88 16 C/L DRY CHAN 2.00 179 279 5206.94 590.79 17 TOE DRY CHAN 36.99 178 278 5243.93 591.19 18 10.00 177 277 5253.93 590.88 19 TOP 3.90 176 276 5257.83 590.01 20 TOE 7.10 175 275 5264.93 590.11 21 TOE 5.00 174 274 5269.94 591.01 22 TOP 22.50 173 273 5292.44 591.09 23 37.50 172 272 5329.94 590.82 24 TOP 4.00 171 271 5333.94 590.21 25 3.50 170 270 5337.43 590.85 26 TOP 29.50 169 269 5366.93 590.60 27 SPIKE 30.50 168 268 5397.43 590.74 28 TOP SALMON RIVER (PRINCE GEORGE) XS8 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.50 167 267 5402.93 589.64 29 TOE CHAN 2.00 166 266 5404.93 590.38 30 C/L CHAN 4.00 165 265 5408.93 590.95 31 TOP 18.50 164 264 5427.44 590.82 32 37.50 163 263 5464.93 590.93 33 TOP DRY CHAN 1.00 162 262 5465.93 589.62 34 TOE CHAN 3.00 161 261 5468.93 589.24 35 C/L CHAN 3.00 160 260 5471.93 589.48 36 TOE CHAN 2.22 159 259 5474.15 590.96 37 TOP DRY CHAN 21.29 158 258 5495.44 590.58 38 32.49 157 257 5527.93 590.94 39 17.00 156 256 5544.93 590.82 40 GL REBAR L/B 3.50 155 255 5548.43 590.69 41 TOP BANK 0.79 154 254 5549.22 589.18 42 NAT BOUNDRY 2.30 153 253 5551.51 588.20 43 W/L TOE 4.28 152 252 5555.79 588.08 44 C/L 0.19 W 4.57 151 251 5560.36 588.26 45 W/L 4.78 150 250 5565.14 588.06 46 TOE 0.10 W 3.94 149 249 5569.08 589.32 47 TOP 22.78 148 248 5591.86 588.58 48 W/L L/B 13.59 147 247 5605.45 587.66 49 9.98 146 246 5615.42 587.18 50 6.90 145 245 5622.33 587.10 51 4.38 144 244 5626.71 587.70 52 TOE 0.87 W 1.70 143 243 5628.41 588.56 53 W/L R/B 13:30 0.79 142 242 5629.20 589.40 54 TOP 17.81 141 241 5647.01 589.44 55 27.11 140 240 5674.12 589.42 56 TOP SALMON RIVER (PRINCE GEORGE) XS8 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.29 139 239 5677.41 588.77 57 BP 2.82 138 238 5680.23 588.72 58 TOE 0.35 W 2.70 137 237 5682.93 588.71 59 TOE 0.20 136 236 5683.12 589.47 60 TOP 25.80 135 235 5708.92 589.34 61 21.50 134 234 5730.42 589.37 62 3.50 133 233 5733.93 588.84 63 17.00 132 232 5750.93 588.49 64 SPIKE ON BAR 15.40 131 231 5766.33 589.17 65 NAT BOUNDRY 4.60 130 230 5770.92 588.39 66 TOP 1.00 129 229 5771.92 587.76 67 2.00 128 228 5773.93 588.37 68 2.10 127 227 5776.02 588.39 69 BP 1.80 126 226 5777.82 589.32 70 TOP 21.10 125 225 5798.92 589.30 71 5.48 124 224 5804.40 588.78 72 TOP 2.10 123 223 5806.50 588.26 73 C/L DITCH 2.40 122 222 5808.91 589.20 74 TOP 19.00 121 221 5827.91 589.23 75 TOE DRY CHAN 21.51 120 220 5849.42 588.83 76 C/L DRY CHAN 7.89 119 219 5857.31 587.88 77 TOE 21.10 118 218 5878.41 588.94 78 TOP 19.49 117 217 5897.91 588.84 79 TOP 3.01 116 216 5900.92 588.35 80 19.19 115 215 5920.11 589.00 81 30.81 114 214 5950.92 588.45 82 TOE 0.98 113 213 5951.90 589.40 83 NAT BOUNDRY 0.51 112 212 5952.41 589.93 84 TOP SALMON RIVER (PRINCE GEORGE) XS8 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.30 111 211 5952.71 590.05 85 REBAR R/B 0.60 110 210 5953.31 590.05 86 TOP 0.90 109 209 5954.21 588.99 87 TOE 12.99 108 208 5967.20 588.63 88 BP 1.50 107 207 5968.70 589.24 89 6.80 106 206 5975.50 589.46 90 TOP 2.00 105 205 5977.49 588.46 91 TOE 2.50 104 204 5979.99 588.73 92 TOE 1.50 103 203 5981.49 589.26 93 TOP 6.19 102 202 5987.69 588.97 94 BP 8.50 101 201 5996.19 589.50 95 TOE BANK 3.93 100 200 6000.12 592.36 96 ON SLOPE RISE B JOIN 195-100 S05 20 00E 6000.118 SALMON RIVER (PRINCE GEORGE) XS9 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 191 291 0.00 600.54 1 DUMMY 1979 5000.00 190 290 5000.00 600.54 2 SLOW RISE BEYOND 15.10 189 289 5015.10 599.14 3 BP 9.49 188 288 5024.60 599.73 4 17.30 187 287 5041.90 599.89 5 36.69 186 286 5078.60 599.75 6 SPIKE C/L RD 25.17 185 285 5103.76 598.81 7 9.74 184 284 5113.50 597.59 8 TOP 5.65 183 283 5119.15 595.45 9 ON SLOPE 5.24 182 282 5124.39 593.92 10 TOE 7.70 181 281 5132.09 593.48 11 W/L SWAMP 9.50 180 280 5141.58 592.83 12 3.80 179 279 5145.39 593.46 13 W/L 2.20 178 278 5147.58 593.42 14 W/L 4.50 177 277 5152.08 592.49 15 3.90 176 276 5155.98 593.22 16 BP 0.23 W 3.30 175 275 5159.28 593.08 17 0.32 W 4.00 174 274 5163.28 593.42 18 W/L 5.30 173 273 5168.58 593.42 19 W/L 6.00 172 272 5174.58 592.72 20 0.72 W 3.40 171 271 5177.99 593.15 21 0.25 W 7.21 170 270 5185.20 593.43 22 W/L SWAMP 5.41 169 269 5190.60 593.68 23 16.40 168 268 5207.01 593.59 24 16.64 167 267 5223.64 594.05 25 8.98 166 266 5232.62 593.53 26 BP 6.88 165 265 5239.50 594.06 27 28.09 164 264 5267.58 593.78 28 SPIKE SALMON RIVER (PRINCE GEORGE) XS9 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 52.01 163 263 5319.59 593.78 29 49.48 162 262 5369.07 593.51 30 14.02 161 261 5383.09 593.15 31 35.28 160 260 5418.36 593.03 32 26.20 159 259 5444.56 593.84 33 17.60 158 258 5462.16 593.33 34 14.30 157 257 5476.46 593.13 35 17.10 156 256 5493.56 592.70 36 SPIKE EDGE RD 26.49 155 255 5520.05 592.68 37 C/L RD 21.31 154 254 5541.35 592.80 38 9.09 153 253 5550.45 593.36 39 3.10 152 252 5553.55 593.18 40 6.60 151 251 5560.15 592.40 41 2.30 150 250 5562.45 591.94 42 1.60 149 249 5564.05 591.09 43 W/L TOE POND 3.90 148 248 5567.95 590.81 44 TOE 0.40 W 1.30 147 247 5569.25 591.07 45 W/L POND 10.10 146 246 5579.35 592.76 46 TOP 6.20 145 245 5585.55 592.74 47 5.81 144 244 5591.36 592.15 48 6.80 143 243 5598.16 592.28 49 C/L RD 15.09 142 242 5613.25 592.75 50 TOP 4.30 141 241 5617.55 591.89 51 EDGE RD 16.01 140 240 5633.56 591.94 52 EDGE RD 3.29 139 239 5636.85 592.65 53 13.20 138 238 5650.05 592.86 54 14.30 137 237 5664.35 592.64 55 GL REBAR L/B 24.00 136 236 5688.34 592.56 56 BP SALMON RIVER (PRINCE GEORGE) XS9 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.00 135 235 5691.34 593.04 57 TOP 0.50 134 234 5691.85 592.22 58 NAT BOUNDRY 1.66 133 233 5693.51 591.23 59 BP TRASH LINE 2.12 132 232 5695.63 590.65 60 W/L L/B 2.68 131 231 5698.32 590.29 61 6.69 130 230 5705.01 590.09 62 5.13 129 229 5710.14 590.19 63 12.40 128 228 5722.54 590.02 64 6.00 127 227 5728.54 590.07 65 TOE 0.62 W 2.80 126 226 5731.34 590.68 66 W/L R/B 3.16 125 225 5734.50 591.43 67 TOP 8.44 124 224 5742.93 591.26 68 18.71 123 223 5761.64 591.89 69 18.19 122 222 5779.83 592.02 70 TOP 3.51 121 221 5783.34 590.88 71 TOE 2.39 120 220 5785.74 591.24 72 19.61 119 219 5805.35 591.18 73 2.49 118 218 5807.84 590.26 74 W/L 2.91 117 217 5810.74 590.01 75 5.60 116 216 5816.34 589.95 76 4.00 115 215 5820.34 589.45 77 2.20 114 214 5822.54 589.16 78 TOE 1.1 W 2.30 113 213 5824.83 589.95 79 1.50 112 212 5826.34 590.23 80 W/L 0.60 111 211 5826.94 590.51 81 2.90 110 210 5829.84 592.18 82 APP HIGH WATER 1.70 109 209 5831.54 592.75 83 ON SLOPE 3.14 108 208 5834.69 597.47 84 TOP BANK SALMON RIVER (PRINCE GEORGE) XS9 79FDC5 JULY 18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.44 107 207 5840.12 598.50 85 BP 3.99 106 206 5844.12 598.64 86 REBAR R/B 21.01 105 205 5865.12 598.92 87 19.98 104 204 5885.10 599.59 88 14.95 103 203 5900.05 599.56 89 29.97 102 202 5930.02 600.54 90 BP 22.01 101 201 5952.03 600.72 91 TOE 11.74 100 200 5963.77 604.34 92 ON SLOPE JOIN 191-100 S07 39 00W 5963.774 SALMON RIVER (PRINCE GEORGE) XS10 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 99 299 0.00 600.18 1 DUMMY 1979 5000.00 100 300 5000.00 600.18 2 FLAT BEYOND 2.86 101 301 5002.86 600.10 3 TOP 6.30 102 302 5009.16 595.92 4 ON SLOPE 3.76 103 303 5012.93 594.20 5 TOE BANK 10.10 104 304 5023.02 593.93 6 3.40 105 305 5026.42 594.04 7 4.10 106 306 5030.52 594.39 8 SPIKE 4.00 107 307 5034.52 594.53 9 3.60 108 308 5038.12 594.06 10 W/L SWAMP 8.00 109 309 5046.13 593.86 11 C/L 0.16 W 3.01 110 310 5049.13 594.04 12 W/L SWAMP 6.99 111 311 5056.12 594.56 13 34.80 112 312 5090.93 594.60 14 33.21 113 313 5124.14 594.59 15 TOP OLD CHAN 1.82 114 314 5125.96 593.66 16 TOE OLD CHAN 1.88 115 315 5127.83 593.71 17 TOE OLD CHAN 1.33 116 316 5129.16 594.64 18 TOP OLD CHAN 22.75 117 317 5151.91 594.56 19 3.20 118 318 5155.11 595.27 20 10.45 119 319 5165.56 595.23 21 22.56 120 320 5188.12 595.69 22 7.89 121 321 5196.01 595.21 23 TOE 2.00 122 322 5198.01 595.98 24 TOP EDGE RD 4.10 123 323 5202.11 595.94 25 REBAR L/B C/L RD 8.00 124 324 5210.11 596.02 26 TOP EDGE RD 4.00 125 325 5214.11 594.15 27 TOE 26.00 126 326 5240.11 594.75 28 BP SALMON RIVER (PRINCE GEORGE) XS10 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.50 127 327 5240.61 594.97 29 BP 27.50 128 328 5268.11 594.86 30 10.00 129 329 5278.11 595.12 31 1.00 130 330 5279.11 594.78 32 BP 8.00 131 331 5287.11 595.16 33 TOP 1.00 132 332 5288.11 594.77 34 NAT BOUNDRY 2.01 133 333 5290.11 593.31 35 TOE 6.99 134 334 5297.11 592.91 36 7.00 135 335 5304.11 593.81 37 20.00 136 336 5324.11 594.10 38 18.00 137 337 5342.11 594.24 39 TOP 4.01 138 338 5346.11 593.55 40 BP 10.01 139 339 5356.13 592.90 41 W/L L/B 10:00 AM 6.22 140 340 5362.34 592.29 42 0.68 W 5.42 141 341 5367.76 591.85 43 1.47 W 5.17 142 342 5372.93 591.85 44 1.45 W 14.69 143 343 5387.62 592.46 45 0.45 W 3.51 144 344 5391.13 592.88 46 W/L R/B 2.19 145 345 5393.32 593.51 47 TOP 17.80 146 346 5411.12 593.51 48 TOP 4.00 147 347 5415.11 592.77 49 W/L 2.01 148 348 5417.13 592.21 50 TOE 0.55 W 12.00 149 349 5429.13 592.75 51 W/L 14.20 150 350 5443.33 593.86 52 35.79 151 351 5479.12 593.98 53 TOE 4.99 152 352 5484.11 594.64 54 TRASH LINE 4.80 153 353 5488.91 595.69 55 TOP 2.90 154 354 5491.81 594.35 56 TOE SALMON RIVER (PRINCE GEORGE) XS10 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.20 155 355 5494.01 595.13 57 TOP 14.10 156 356 5508.11 594.92 58 GL REBAR R/B 28.30 157 357 5536.41 594.79 59 BP 12.30 158 358 5548.71 594.79 60 TOP 1.89 159 359 5550.60 594.05 61 TOE 4.01 160 360 5554.61 593.76 62 TOE 2.30 161 361 5556.91 594.60 63 TOP 6.20 162 362 5563.10 594.87 64 BP 2.60 163 363 5565.71 595.35 65 26.70 164 364 5592.41 595.56 66 24.49 165 365 5616.90 595.40 67 SPIKE 24.30 166 366 5641.20 595.34 68 3.70 167 367 5644.90 594.68 69 BP 4.30 168 368 5649.20 594.34 70 1.80 169 369 5651.00 593.63 71 TOE OLD CHAN 4.20 170 370 5655.20 593.60 72 TOE OLD CHAN 2.10 171 371 5657.30 594.91 73 TOP 26.58 172 372 5683.88 595.62 74 13.00 173 373 5696.88 595.80 75 1 5.80 174 374 5702.68 595.47 76 TOP OLD CHAN 1.20 175 375 5703.88 594.99 77 TOE OLD CHAN 4.01 176 376 5707.89 594.73 78 TOE OLD CHAN 1.01 177 377 5708.90 595.19 79 TOP OLD CHAN 6.79 178 378 5715.68 595.82 80 TOP 9.22 179 379 5724.90 593.93 81 TOE DRY CHAN 15.00 180 380 5739.90 594.52 82 C/L DRY CHAN 17.00 181 381 5756.90 593.52 83 TOE DRY CHAN 12.99 182 382 5769.90 595.91 84 TOP SALMON RIVER (PRINCE GEORGE) XS10 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 24.90 183 383 5794.79 596.22 85 12.09 184 384 5806.88 597.01 86 10.01 185 385 5816.89 596.77 87 SPIKE 16.29 186 386 5833.18 595.32 88 2.77 187 387 5835.95 595.60 89 BP 5.13 188 388 5841.08 596.86 90 TOP 30.79 189 389 5871.87 596.86 91 8.52 190 390 5880.39 596.36 92 9.50 191 391 5889.89 597.42 93 7.00 192 392 5896.89 597.40 94 TOP 3.00 193 393 5899.88 596.21 95 C/L OLD CHAN 4.50 194 394 5904.38 597.28 96 TOP 19.29 195 395 5923.68 597.79 97 SPIKE 28.50 196 396 5952.17 597.59 98 31.70 197 397 5983.88 597.51 99 26.60 198 398 6010.48 597.31 100 TOE RD 1.19 199 399 6011.67 597.85 101 TOP EDGE RD 6.01 200 400 6017.68 597.93 102 TOE EDGE RD 2.99 201 401 6020.67 599.21 103 ON SLOPE STEEP B JOIN 99-201 S36 39 00W 6020.672 SALMON RIVER (PRINCE GEORGE) XS11 79FDC5 JULY17 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 162 262 0.00 600.81 1 DUMMY 1979 5000.00 161 261 5000.00 600.81 2 TOP FLAT BEY.END 6.30 160 260 5006.30 599.78 3 TOE 3.50 159 259 5009.80 600.43 4 BRK 8.50 158 258 5018.30 600.60 5 14.90 157 257 5033.20 600.53 6 12.50 156 256 5045.70 600.44 7 TOP 3.30 155 255 5049.00 599.74 8 3.10 154 254 5052.10 600.24 9 TOP 3.90 153 253 5056.00 600.51 10 11.30 152 252 5067.29 600.21 11 8.30 151 251 5075.59 600.32 12 REBAR LB 3.30 150 250 5078.89 599.98 13 3.61 149 249 5082.50 600.23 14 9.80 148 248 5092.30 600.06 15 FENCELINE 19.59 147 247 5111.89 599.12 16 8.50 146 246 5120.38 598.94 17 3.50 145 245 5123.88 598.91 18 SPIKE 9.60 144 244 5133.48 599.00 19 21.80 143 243 5155.28 599.31 20 15.70 142 242 5170.98 599.51 21 TOP BANK 1.80 141 241 5172.78 598.56 22 TOE BANK 3.10 140 240 5175.89 598.07 23 2.20 139 239 5178.09 598.38 24 GRD 10.80 138 238 5188.89 598.07 25 C/L 4.90 137 237 5193.79 598.46 26 TOE 1.50 136 236 5195.28 598.73 27 TOP CHANNEL 5.40 135 235 5200.68 599.01 28 SALMON RIVER (PRINCE GEORGE) XS11 79FDC5 JULY17 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15.50 134 234 5216.18 598.88 29 6.20 133 233 5222.38 599.24 30 4.10 132 232 5226.48 599.09 31 C/L 2.90 131 231 5229.38 599.33 32 TOE CHANNEL 14.00 130 230 5243.38 599.35 33 19.10 129 229 5262.48 599.09 34 TOP 0.90 128 228 5263.38 598.69 35 TOE 4.90 127 227 5268.28 598.46 36 C/L DRY CHANNEL 7.80 126 226 5276.08 598.81 37 6.60 125 225 5282.68 599.17 38 GL SPIKE ON BAR 4.49 124 224 5287.17 598.98 39 6.29 123 223 5293.46 598.29 40 TRASH LINE 5.68 122 222 5299.14 597.93 41 13.76 121 221 5312.89 598.05 42 GRAVEL BAR 11.45 120 220 5324.34 597.49 43 W/L LB 9.47 119 219 5333.81 596.96 44 D 0.50 3.99 118 218 5337.80 596.88 45 D 0.70 4.49 117 217 5342.29 596.61 46 D 0.88 2.80 116 216 5345.09 596.72 47 D 0.75 4.30 115 215 5349.39 596.58 48 D 0.90 3.90 114 214 5353.28 596.18 49 D 1.30 8.30 113 213 5361.58 596.16 50 D 1.30 3.35 112 212 5364.93 596.40 51 D 1.08 3.40 111 211 5368.33 597.32 52 W/L R/B 1355 1.34 110 210 5369.67 598.61 53 WAT. BDY. 0.91 109 209 5370.58 599.99 54 TOP 2.30 108 208 5372.88 599.08 55 BOLT R/B 16.09 107 207 5388.97 599.92 56 BREAK SALMON RIVER (PRINCE GEORGE) XS11 79FDC5 JULY17 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9.00 106 206 5397.97 599.74 57 BREAK 14.50 105 205 5412.47 600.01 58 BREAK 8.99 104 204 5421.46 599.64 59 W/L 8.00 103 203 5429.46 599.60 60 TOE & W/L BK.C 5.63 102 202 5435.09 602.66 61 BRK 2.06 101 201 5437.16 603.38 62 TOP 10.40 100 200 5447.56 603.48 63 FLAT BEY. JOIN 162-151 S32 39 00W 5075.595 JOIN 151-100 S42 39 00W 371.960 SALMON RIVER (PRINCE GEORGE) XS12 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 99 199 0.00 602.80 1 DUMMY 1979 5000.00 100 200 5000.00 602.80 2 FLD GRADUAL RISE 15.80 101 201 5015.80 603.31 3 15.20 102 202 5031.00 603.61 4 E.FLD 5.80 103 203 5036.80 602.19 5 TOE 5.90 104 204 5042.70 602.04 6 2.00 105 205 5044.70 600.69 7 W/L 1.90 106 206 5046.60 600.19 8 3.40 107 207 5050.00 600.69 9 0.6W 3.00 108 208 5053.00 601.89 10 TOP 4.00 109 209 5057.00 601.52 11 4.10 110 210 5061.10 602.17 12 16.90 111 211 5078.00 602.23 13 26.00 112 212 5104.00 602.19 14 20.20 113 213 5124.20 601.76 15 15.60 114 214 5139.80 602.24 16 11.60 115 215 5151.40 602.26 17 5.30 116 216 5156.70 601.75 18 12.40 117 217 5169.10 602.00 19 15.60 118 218 5184.70 601.91 20 6.10 119 219 5190.80 602.09 21 13.40 120 220 5204.20 602.03 22 2.60 121 221 5206.80 602.30 23 TOE E.TREES 2.60 122 222 5209.40 603.04 24 TOP BK 2.00 123 223 5211.40 602.44 25 GL REBAR L/B 1.20 124 224 5212.60 602.19 26 TOE BK 3.80 125 225 5216.40 602.08 27 VEG LN 5.00 126 226 5221.40 601.76 28 BP SALMON RIVER (PRINCE GEORGE) XS12 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.00 127 227 5231.40 600.87 29 BP 12.40 128 228 5243.80 601.22 30 BP BAR 3.70 129 229 5247.50 600.84 31 W/L L/B 3.70 130 230 5251.20 600.45 32 9.22 131 231 5260.42 600.72 33 0.1W 12.38 132 232 5272.80 600.59 34 0.25W 6.59 133 233 5279.39 600.56 35 0.2 W 7.33 134 234 5286.72 599.95 36 0.7 W 6.78 135 235 5293.50 599.64 37 1.0 W 3.81 136 236 5297.31 600.59 38 W/L BAR 1.71 137 237 5299.02 600.64 39 TOP BAR 0.79 138 238 5299.81 600.61 40 W/L BAR 4.60 139 239 5304.41 600.07 41 0.5W 6.25 140 240 5310.66 600.54 42 W/L R/B 2.73 141 241 5313.40 603.23 43 TOP 2.59 142 242 5315.99 603.30 44 REBAR R/B 7.40 143 243 5323.39 603.46 45 TOP 1.80 144 244 5325.19 602.24 46 TOE 2.10 145 245 5327.29 602.29 47 TOE 1.30 146 246 5328.59 603.15 48 TOP 12.70 147 247 5341.29 602.41 49 TOP 2.80 148 248 5344.09 602.10 50 3.50 149 249 5347.59 602.08 51 TOE 2.00 150 250 5349.59 603.31 52 TOP 11.40 151 251 5360.99 603.34 53 3.20 152 252 5364.19 602.98 54 8.80 153 253 5372.99 603.00 55 TOE BK 6.02 154 254 5379.01 605.61 56 TOP SALMON RIVER (PRINCE GEORGE) XS12 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13.58 155 255 5392.59 605.78 57 18.60 156 256 5411.19 605.76 58 31.49 157 257 5442.68 606.01 59 13.09 158 258 5455.77 606.34 60 9.81 159 259 5465.57 606.27 61 25.67 160 260 5491.24 606.09 62 JOIN 99-160 S42 39 00W 5491.242 SALMON RIVER (PRINCE GEORGE) XS13 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 99 199 0.00 608.63 1 DUMMY 1979 5000.00 100 200 5000.00 608.63 2 C/L RD 4.40 101 201 5004.40 608.47 3 1.00 102 202 5005.40 608.28 4 GL REBAR L/B 3.50 103 203 5008.90 607.69 5 3.80 104 204 5012.69 607.47 6 TOP BK 0.70 105 205 5013.39 606.61 7 NAT BDY 3.53 106 206 5016.92 604.96 8 W/L L/B 3.84 107 207 5020.77 604.09 9 0.84W 1.20 108 208 5021.97 604.33 10 0.58W 2.90 109 209 5024.87 603.29 11 1.5 W 8.03 110 210 5032.90 603.78 12 1.21 W 5.85 111 211 5038.75 604.41 13 0.56 W 8.71 112 212 5047.46 604.92 14 W/L R/B 10.83 113 213 5058.29 605.20 15 BP 16.35 114 214 5074.65 605.31 16 8.20 115 215 5082.84 605.00 17 TRASH LN TOE 4.78 116 216 5087.62 604.92 18 6.51 117 217 5094.13 606.20 19 REBAR 10.40 118 218 5104.53 606.05 20 18.30 119 219 5122.83 605.10 21 TOP 3.30 120 220 5126.13 605.32 22 TOE 8.30 121 221 5134.43 605.81 23 11.40 122 222 5145.82 605.95 24 5.50 123 223 5151.32 605.49 25 3.80 124 224 5155.13 606.13 26 TOP 1.70 125 225 5156.83 605.21 27 TOE 2.80 126 226 5159.63 605.20 28 TOE SALMON RIVER (PRINCE GEORGE) XS13 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.89 127 227 5161.52 605.82 29 TOP 14.20 128 228 5175.73 605.75 30 9.60 129 229 5185.32 606.04 31 10.00 130 230 5195.33 605.90 32 TOP 1.30 131 231 5196.63 605.36 33 TOE 5.30 132 232 5201.93 605.13 34 TOE 4.40 133 233 5206.33 605.83 35 4.30 134 234 5210.63 605.35 36 2.90 135 235 5213.53 606.60 37 TOP 10.20 136 236 5223.73 606.53 38 11.40 137 237 5235.13 606.10 39 18.40 138 238 5253.53 606.30 40 11.40 139 239 5264.93 605.48 41 4.60 140 240 5269.53 606.10 42 13.40 141 241 5282.93 607.28 43 8.80 142 242 5291.72 607.14 44 SPIKE 13.60 143 243 5305.32 607.14 45 23.10 144 244 5328.42 606.97 46 4.90 145 245 5333.32 606.89 47 11.70 146 246 5345.02 606.98 48 4.70 147 247 5349.72 607.64 49 12.40 148 248 5362.12 607.53 50 8.20 149 249 5370.32 607.49 51 TOE BK 2.99 150 250 5373.32 608.86 52 TOP BK 8.50 151 251 5381.81 608.70 53 SPIKE 12.00 152 252 5393.81 609.33 54 14.60 153 253 5408.41 608.81 55 9.00 154 254 5417.41 608.82 56 SALMON RIVER (PRINCE GEORGE) XS13 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.40 155 255 5422.81 609.03 57 11.90 156 256 5434.71 608.44 58 11.80 157 257 5446.51 608.34 59 11.00 158 258 5457.51 608.10 60 8.60 159 259 5466.10 607.29 61 7.00 160 260 5473.10 607.78 62 5.21 161 261 5478.31 609.33 63 6.70 162 262 5485.01 609.41 64 6.30 163 263 5491.31 609.62 65 5.69 164 264 5497.00 609.55 66 SLOW RISE BYD JOIN 99-164 S38 39 00W 5497.001 SALMON RIVER (PRINCE GEORGE) XS14 79FDC5 JULY11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 132 232 0.00 612.72 1 DUMMY 1979 5000.00 131 231 5000.00 612.72 2 GRND HWY. FILL E 30.00 130 230 5030.00 612.82 3 BOLT L/B 1.10 129 229 5031.10 612.74 4 GRND. 0.50 128 228 5031.60 613.09 5 TOP ABT. 0.32 127 227 5031.92 613.09 6 TOP ABT. 0.06 126 226 5031.98 610.91 7 TOE ABT. 1.15 125 225 5033.13 610.91 8 TOP SEAT 0.14 124 224 5033.27 607.81 9 TOP SLIP 0.51 123 223 5033.79 607.34 10 TOE SEAT 1.27 122 222 5035.06 607.32 11 TOP CRIB 0.28 121 221 5035.34 606.90 12 W/L L/B 1653 0.14 120 220 5035.49 606.43 13 D0.5 TOE CRIB 1.58 119 219 5037.06 606.54 14 D0.3 6.90 118 218 5043.97 606.87 15 D0.1 5.25 117 217 5049.22 606.76 16 D0.2 8.50 116 216 5057.72 606.38 17 D0.60 7.39 115 215 5065.11 606.08 18 D0.90 3.97 114 214 5069.08 605.47 19 D1.30 1.86 113 213 5070.93 605.98 20 D0.10 0.94 112 212 5071.88 606.22 21 D0.70 3.21 111 211 5075.09 606.27 22 D0.65 5.65 110 210 5080.73 606.51 23 TOE D0.55 0.81 109 209 5081.54 606.90 24 W/L R/B 1640 HR 1.70 108 208 5083.24 607.73 25 NAT. BDY. 3.46 107 207 5086.70 608.40 26 TOE SEAT 0.10 106 206 5086.80 610.90 27 TOP SEAT 1.00 105 205 5087.80 610.98 28 TOE WALL SALMON RIVER (PRINCE GEORGE) XS14 79FDC5 JULY11 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.00 104 204 5087.80 613.10 29 TOP ABT.BASE 0.40 103 203 5088.20 613.09 30 TOP ABT.BASE 0.10 102 202 5088.30 612.81 31 TOE ABT.BASE 1.30 101 201 5089.60 612.81 32 GL BOLT R/B 38.50 100 200 5128.10 613.34 33 FLAT BEYOND HWY. JOIN 132-100 S54 39 00W 5128.099 SALMON RIVER (PRINCE GEORGE) XS15 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 131 231 0.00 608.07 1 DUMMY 1979 5000.00 130 230 5000.00 608.07 2 REBAR L/B 1.65 129 229 5001.65 607.93 3 1.40 128 228 5003.05 607.34 4 0.56 127 227 5003.61 606.96 5 8.22 126 226 5011.84 606.71 6 8.59 125 225 5020.43 607.39 7 4.10 124 224 5024.53 608.19 8 5.28 123 223 5029.80 608.67 9 9.00 122 222 5038.80 608.83 10 TOP 1.68 121 221 5040.48 609.12 11 11.93 120 220 5052.41 609.01 12 3.23 119 219 5055.64 608.65 13 1.90 118 218 5057.55 607.64 14 NATURAL BDY 0.97 117 217 5058.52 607.17 15 W/L LB 2.77 116 216 5061.29 606.76 16 0.4 2.50 115 215 5063.79 606.84 17 D-0.3 4.11 114 214 5067.90 607.14 18 W/L BAR 1.79 113 213 5069.69 607.29 19 BAR 3.57 112 212 5073.26 607.10 20 BAR 10.52 111 211 5083.78 607.49 21 W/L BAR 10.07 110 210 5093.86 607.16 22 0.4 5.61 109 209 5099.47 606.97 23 0.6 8.78 108 208 5108.25 606.79 24 D-0.8 3.45 107 207 5111.70 607.55 25 W/L 1.10 106 206 5112.80 608.12 26 NATURAL BDY 2.81 105 205 5115.61 610.04 27 1.50 104 204 5117.11 610.35 28 TOP BANK SALMON RIVER (PRINCE GEORGE) XS15 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.60 103 203 5121.71 610.64 29 7.60 102 202 5129.31 610.65 30 TOE 2.00 101 201 5131.31 611.72 31 TOP EDGE RD 1.30 100 200 5132.61 611.72 32 REBAR RB JOIN 131-100 S49 39 00W 5132.607 SALMON RIVER (PRINCE GEORGE) XS16 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 99 299 0.00 614.93 1 DUMMY 1979 5000.00 100 300 5000.00 614.93 2 C/L PG 9.50 101 301 5009.50 615.24 3 REBAR L/B 1.60 102 302 5011.09 614.94 4 TOP HWY BK 5.85 103 303 5016.95 612.54 5 TOE 13.32 104 304 5030.27 612.42 6 TOP R. BK 5.06 105 305 5035.33 609.28 7 W/L L/B 0.96 106 306 5036.28 608.98 8 TOE 9.60 107 307 5045.89 609.28 9 W/L BAR 8.19 108 308 5054.07 609.37 10 TOP BAR 7.30 109 309 5061.37 609.20 11 W/L BAR 14.05 110 310 5075.42 608.88 12 0.2M W 7.26 111 311 5082.68 608.22 13 0.9M W 7.27 112 312 5089.95 607.82 14 TOE 1.2M W 1.47 113 313 5091.42 609.06 15 W/L R/B TOE 1.60 114 314 5093.02 610.62 16 TOP NAT BDY 3.33 115 315 5096.35 610.81 17 REBAR R/B 11.50 116 316 5107.85 610.89 18 13.00 117 317 5120.85 610.56 19 0.70 118 318 5121.54 610.37 20 4.00 119 319 5125.54 610.48 21 10.40 120 320 5135.94 609.99 22 10.90 121 321 5146.84 610.44 23 5.30 122 322 5152.14 610.41 24 3.49 123 323 5155.63 610.00 25 TOP 1.20 124 324 5156.83 609.41 26 0.40 125 325 5157.22 609.27 27 W/L CH. 0.20 126 326 5157.42 608.76 28 0.5 W SALMON RIVER (PRINCE GEORGE) XS16 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.00 127 327 5160.42 608.73 29 0.62W 2.19 128 328 5162.61 609.07 30 0.26W 1.80 129 329 5164.41 609.35 31 W/L CH 2.01 130 330 5166.42 609.66 32 TOP 4.60 131 331 5171.02 610.38 33 14.12 132 332 5185.15 610.42 34 8.60 133 333 5193.74 610.18 35 11.30 134 334 5205.05 610.38 36 TOP 2.70 135 335 5207.74 609.11 37 TOE 0.60 136 336 5208.34 609.07 38 W/L 1.30 137 337 5209.64 608.67 39 0.05W 1.60 138 338 5211.24 609.09 40 1.80 139 339 5213.05 610.45 41 TOP 4.60 140 340 5217.65 610.12 42 10.70 141 341 5228.35 610.37 43 5.00 142 342 5233.35 610.09 44 SPIKE 3.09 143 343 5236.44 610.51 45 3.29 144 344 5239.73 610.52 46 3.39 145 345 5243.12 609.91 47 1.10 146 346 5244.22 610.30 48 5.39 147 347 5249.61 609.17 49 TOP 1.39 148 348 5251.00 609.68 50 TOE 1.10 149 349 5252.10 609.66 51 1.91 150 350 5254.01 609.91 52 TOE 1.63 151 351 5255.64 610.77 53 TOP 6.41 152 352 5262.05 610.70 54 1.80 153 353 5263.84 610.35 55 6.50 154 354 5270.34 610.92 56 SALMON RIVER (PRINCE GEORGE) XS16 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.30 155 355 5280.64 610.99 57 4.20 156 356 5284.84 610.44 58 1.80 157 357 5286.64 610.82 59 10.90 158 358 5297.54 610.94 60 TOP 9.10 159 359 5306.64 610.36 61 4.10 160 360 5310.74 610.18 62 TOE 6.70 161 361 5317.44 611.21 63 TOP 6.30 162 362 5323.74 611.27 64 2.20 163 363 5325.94 610.78 65 4.80 164 364 5330.74 611.41 66 2.70 165 365 5333.44 610.85 67 13.29 166 366 5346.74 611.13 68 13.50 167 367 5360.23 611.26 69 8.60 168 368 5368.84 610.72 70 10.80 169 369 5379.63 611.35 71 5.30 170 370 5384.93 610.47 72 0.10 171 371 5385.03 610.25 73 W/L 2.30 172 372 5387.34 609.10 74 9.90 173 373 5397.24 610.13 75 10.58 174 374 5407.82 611.92 76 5.30 175 375 5413.12 610.99 77 7.21 176 376 5420.32 609.31 78 6.10 177 377 5426.42 610.82 79 6.90 178 378 5433.32 610.85 80 5.00 179 379 5438.32 610.01 81 5.60 180 380 5443.92 610.91 82 6.80 181 381 5450.72 610.65 83 4.40 182 382 5455.12 611.29 84 SALMON RIVER (PRINCE GEORGE) XS16 79FDC5 JULY18 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.30 183 383 5460.42 612.29 85 TOP 5.29 184 384 5465.71 612.05 86 SPIKE 20.70 185 385 5486.41 612.45 87 6.90 186 386 5493.31 612.14 88 TOP 2.80 187 387 5496.11 611.03 89 TOE 6.00 188 388 5502.11 611.12 90 2.30 189 389 5504.41 611.10 91 TOE 3.00 190 390 5507.41 611.98 92 TOP 13.00 191 391 5520.41 612.15 93 15.80 192 392 5536.21 611.78 94 13.40 193 393 5549.61 612.14 95 2.70 194 394 5552.31 611.60 96 10.80 195 395 5563.11 612.10 97 5.70 196 396 5568.81 611.24 98 5.10 197 397 5573.91 612.33 99 15.90 198 398 5589.81 611.91 100 20.60 199 399 5610.41 612.14 101 10.00 200 400 5620.41 611.90 102 8.90 201 401 5629.31 611.07 103 TOE 7.59 202 402 5636.90 614.17 104 1.50 203 403 5638.40 614.80 105 TOP FLT BYD JOIN 99-142 N38 21 00W 5233.346 JOIN 142-184 N52 21 00W 232.369 JOIN 184-203 N69 21 00W 172.684