NOTE: This information is considered historical as it represents channel conditions and configuration at the time of the survey only. User must accept responsibility of ensuring that the accuracy and completeness of provided data is suitable for the needs of the project or study. It is provided "as is" without warranty of any kind, whether express or implied. Under no circumstances will the Government of British Columbia be liable to any person or business entity for any direct, indirect, special, incidental, consequential, or other damages based on any use of this information. VEDDER RIVER CROSS SECTION 12 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 13.00 1 DUMMY 2000.00 399 799 2000.00 13.00 2 PLOT REF XS12 74.04 400 800 2074.04 14.86 3 BOLT-LB 2.07 401 801 2076.11 14.91 4 EDGE-ROAD 1.41 402 802 2077.53 14.98 5 TOP-RIPRAP 0.59 403 803 2078.12 14.60 6 HWM-ON-XS 1.84 404 804 2079.96 13.66 7 . 1.55 405 805 2081.51 12.22 8 WL-LB-1111HRS 1.54 406 806 2083.05 11.21 9 . 1.03 407 807 2084.08 11.19 10 . 2.15 408 808 2086.24 11.01 11 . 3.24 409 809 2089.47 10.97 12 . 3.38 410 810 2092.85 11.05 13 . 3.04 411 811 2095.89 11.09 14 . 2.35 412 812 2098.24 11.24 15 . 1.91 413 813 2100.16 11.30 16 . 1.83 414 814 2101.99 11.39 17 . 2.40 415 815 2104.39 11.48 18 . 3.01 416 816 2107.40 11.72 19 . 5.76 417 817 2113.16 11.95 20 . 8.57 418 818 2121.74 12.08 21 . 11.85 419 819 2133.59 11.94 22 . 7.65 420 820 2141.24 11.90 23 . 5.19 421 821 2146.43 11.95 24 TOE-RIPRAP 0.76 422 822 2147.19 12.29 25 WL-RB 1.85 423 823 2149.04 13.70 26 . 2.37 424 824 2151.41 15.30 27 TOP-RIPRAP 3.58 425 825 2154.99 15.10 28 BOLT RB JOIN 398-425 N03 43 19W 2154.993 VEDDER RIVER CROSS SECTION 11-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 12.60 1 DUMMY 2000.00 399 799 2000.00 12.60 2 PLOT REF XS11-1 89.35 400 800 2089.35 14.50 3 BOLT-LB 1.92 401 801 2091.27 14.47 4 EDGE-ROAD 1.42 402 802 2092.69 14.72 5 TOP-RIPRAP 2.34 403 803 2095.03 13.61 6 . 2.04 404 804 2097.07 11.92 7 WL-LB-1130HRS 1.00 405 805 2098.06 11.14 8 . 1.57 406 806 2099.63 11.16 9 . 1.89 407 807 2101.52 11.13 10 . 2.40 408 808 2103.92 11.07 11 . 4.15 409 809 2108.07 11.05 12 . 3.04 410 810 2111.11 10.96 13 . 4.83 411 811 2115.95 11.02 14 . 4.40 412 812 2120.35 11.10 15 . 3.66 413 813 2124.01 11.28 16 . 3.88 414 814 2127.89 11.36 17 . 5.17 415 815 2133.07 11.50 18 . 9.04 416 816 2142.10 11.59 19 . 9.53 417 817 2151.64 11.63 20 . 7.05 418 818 2158.68 11.33 21 . 4.34 419 819 2163.03 11.23 22 . 1.90 420 820 2164.93 11.12 23 TOE 1.21 421 821 2166.14 11.89 24 WL-RB 2.11 422 822 2168.24 13.76 25 . 1.54 423 823 2169.79 14.81 26 TOP-RIPRAP 1.81 424 824 2171.59 14.53 27 TOE 2.46 425 825 2174.05 14.61 28 BOLT RB JOIN 398-425 N11 11 23W 2174.051 VEDDER RIVER CROSS SECTION 11-1 MARCH 1990 INPUT LISTING VEDDER RIVER CROSS SECTION 11 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 13.60 1 DUMMY 2000.00 399 799 2000.00 13.60 2 PLOT REF XS11 280.89 400 800 2280.89 14.02 3 BOLT-LB 2.23 401 801 2283.11 13.95 4 EDGE-ROAD 1.14 402 802 2284.25 13.90 5 TOP-RIPRAP 1.85 403 803 2286.10 13.04 6 . 1.57 404 804 2287.68 12.02 7 TOE-RIPRAP 1.38 405 805 2289.06 11.82 8 . 11.96 406 806 2301.02 12.11 9 . 16.14 407 807 2317.16 11.95 10 . 18.62 408 808 2335.79 11.52 11 . 2.53 409 809 2338.32 11.19 12 WL-LB-1302HRS 6.01 410 810 2344.33 10.90 13 . 6.43 411 811 2350.76 10.70 14 . 8.51 412 812 2359.26 10.59 15 . 4.34 413 813 2363.60 10.57 16 . 4.05 414 814 2367.65 10.45 17 . 2.46 415 815 2370.11 10.35 18 . 2.15 416 816 2372.26 10.32 19 . 1.87 417 817 2374.13 10.24 20 . 1.61 418 818 2375.74 10.01 21 . 2.02 419 819 2377.76 9.67 22 . 1.99 420 820 2379.75 9.63 23 . 1.34 421 821 2381.09 10.02 24 . 1.79 422 822 2382.88 10.65 25 . 0.26 423 823 2383.14 11.10 26 WL-RB 2.13 424 824 2385.27 13.02 27 . 1.62 425 825 2386.89 14.12 28 TOP-RIPRAP VEDDER RIVER CROSS SECTION 11 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.50 426 826 2390.38 14.31 29 BOLT RB JOIN 398-426 N16 34 34W 2390.384 VEDDER RIVER CROSS SECTION 10-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 12.20 1 DUMMY 2000.00 399 799 2000.00 12.20 2 PLOT REF XS10-1 88.17 400 800 2088.17 13.76 3 BOLT-LB 2.77 401 801 2090.94 13.75 4 EDGE-ROAD 1.15 402 802 2092.09 13.62 5 TOP-RIPRAP 4.34 403 803 2096.43 11.35 6 TOE-RIPRAP 3.94 404 804 2100.36 11.29 7 . 1.98 405 805 2102.34 11.89 8 . 19.60 406 806 2121.95 11.96 9 . 22.77 407 807 2144.72 11.85 10 . 21.18 408 808 2165.90 11.32 11 . 13.97 409 809 2179.87 11.21 12 . 5.65 410 810 2185.52 10.74 13 WL-LB-1328HRS 4.67 411 811 2190.18 10.33 14 . 4.61 412 812 2194.79 10.07 15 . 0.88 413 813 2195.68 10.06 16 . 1.12 414 814 2196.79 9.96 17 . 2.38 415 815 2199.17 9.85 18 . 2.02 416 816 2201.19 9.72 19 . 2.96 417 817 2204.15 9.54 20 . 2.74 418 818 2206.89 9.45 21 . 3.45 419 819 2210.34 9.45 22 . 2.13 420 820 2212.47 9.52 23 . 2.73 421 821 2215.20 9.47 24 . 2.45 422 822 2217.64 9.54 25 . 1.12 423 823 2218.76 10.19 26 . 1.05 424 824 2219.81 10.74 27 WL-RB 2.13 425 825 2221.94 12.70 28 . VEDDER RIVER CROSS SECTION 10-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.78 426 826 2223.72 13.55 29 TOP-RIPRAP 3.63 427 827 2227.35 13.60 30 BOLT RB JOIN 398-427 N30 26 42W 2227.352 VEDDER RIVER CROSS SECTION 10 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 11.80 1 DUMMY 2000.00 399 799 2000.00 11.80 2 PLOT REF XS10 61.23 400 800 2061.23 13.58 3 BOLT-LB 3.16 401 801 2064.40 13.45 4 TOP-RIPRAP 1.68 402 802 2066.08 12.46 5 . 1.47 403 803 2067.55 11.43 6 TOE-RIPRAP 5.92 404 804 2073.46 11.43 7 . 7.73 405 805 2081.19 10.82 8 . 1.53 406 806 2082.72 11.23 9 . 7.21 407 807 2089.93 11.46 10 . 18.54 408 808 2108.48 11.39 11 . 13.40 409 809 2121.87 11.34 12 . 10.52 410 810 2132.40 11.00 13 . 4.62 411 811 2137.01 10.96 14 . 3.91 412 812 2140.93 10.60 15 WL-LB-1347HRS 2.11 413 813 2143.04 9.85 16 . 1.31 414 814 2144.35 9.37 17 . 2.46 415 815 2146.81 8.94 18 . 1.66 416 816 2148.47 9.15 19 . 3.27 417 817 2151.74 9.08 20 . 3.05 418 818 2154.78 9.05 21 . 1.90 419 819 2156.68 9.02 22 . 2.53 420 820 2159.21 9.08 23 . 2.75 421 821 2161.96 9.11 24 . 2.91 422 822 2164.86 9.26 25 . 1.35 423 823 2166.21 9.82 26 . 1.12 424 824 2167.33 10.59 27 WL-RB 1.49 425 825 2168.82 11.63 28 TOP-RIPRAP VEDDER RIVER CROSS SECTION 10 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.98 426 826 2171.80 12.81 29 TOP 3.52 427 827 2175.32 12.83 30 TOE-RIPRAP 2.76 428 828 2178.08 13.65 31 TOP-RAPRAP 1.92 429 829 2180.00 13.51 32 BOLT RB JOIN 398-429 N36 00 12W 2180.003 VEDDER RIVER CROSS SECTION 9-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 11.40 1 DUMMY 2000.00 399 799 2000.00 11.40 2 PLOT REF XS9-1 45.90 400 800 2045.90 12.99 3 BOLT-LB 1.65 401 801 2047.55 12.98 4 EDGE-ROAD 1.90 402 802 2049.45 12.88 5 TOP-RIPRAP 2.78 403 803 2052.23 11.01 6 TOE-RIPRAP 7.42 404 804 2059.65 10.75 7 . 8.59 405 805 2068.24 10.97 8 . 9.63 406 806 2077.88 10.69 9 . 0.77 407 807 2078.65 10.44 10 WL-LB-1405HRS 2.31 408 808 2080.96 9.82 11 . 1.69 409 809 2082.65 9.64 12 . 0.03 410 810 2082.67 9.63 13 . 2.55 411 811 2085.23 9.61 14 . 2.75 412 812 2087.98 9.62 15 . 2.87 413 813 2090.85 9.58 16 . 3.00 414 814 2093.85 9.64 17 . 3.14 415 815 2096.99 9.64 18 . 2.17 416 816 2099.16 9.61 19 . 4.53 417 817 2103.69 9.70 20 . 3.62 418 818 2107.31 9.73 21 . 3.05 419 819 2110.36 9.78 22 . 3.52 420 820 2113.88 9.80 23 . 4.46 421 821 2118.34 9.82 24 . 3.23 422 822 2121.57 9.76 25 . 2.74 423 823 2124.31 9.79 26 . 2.98 424 824 2127.29 9.82 27 . 2.65 425 825 2129.94 10.01 28 . VEDDER RIVER CROSS SECTION 9-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.18 426 826 2133.12 10.46 29 WL-RB 2.46 427 827 2135.58 11.16 30 TOP 5.19 428 828 2140.77 10.91 31 TOE-RIPRAP 3.17 429 829 2143.94 12.94 32 TOP-RIPRAP 3.55 430 830 2147.50 12.84 33 BOLT RB JOIN 398-430 N41 17 51W 2147.495 VEDDER RIVER CROSS SECTION 9 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 10.80 1 DUMMY 2000.00 399 799 2000.00 10.80 2 PLOT REF XS9 38.60 400 800 2038.60 12.84 3 BOLT-LB 0.15 401 801 2038.75 12.84 4 EDGE-ROAD 1.87 402 802 2040.62 12.89 5 EDGE-ROAD 1.72 403 803 2042.34 12.85 6 TOP-RIPRAP 2.67 404 804 2045.01 11.09 7 TOE-RIPRAP 2.58 405 805 2047.59 10.73 8 . 5.26 406 806 2052.84 10.68 9 . 0.40 407 807 2053.24 10.28 10 WL-LB-1423HRS 1.53 408 808 2054.78 9.43 11 . 2.21 409 809 2056.99 9.28 12 . 2.86 410 810 2059.85 9.34 13 . 2.40 411 811 2062.25 9.44 14 . 2.43 412 812 2064.68 9.42 15 . 2.55 413 813 2067.23 9.53 16 . 3.20 414 814 2070.42 9.60 17 . 2.55 415 815 2072.97 9.71 18 . 2.29 416 816 2075.26 9.72 19 . 3.66 417 817 2078.92 9.81 20 . 6.73 418 818 2085.65 9.86 21 . 10.13 419 819 2095.78 9.84 22 . 9.42 420 820 2105.21 9.92 23 . 9.78 421 821 2114.98 10.06 24 . 4.51 422 822 2119.49 10.02 25 . 4.68 423 823 2124.17 10.20 26 . 3.37 424 824 2127.54 10.22 27 . 1.50 425 825 2129.04 10.33 28 WL-RB VEDDER RIVER CROSS SECTION 9 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.83 426 826 2131.87 11.01 29 . 4.86 427 827 2136.73 10.59 30 . 4.48 428 828 2141.21 9.95 31 TOE 2.77 429 829 2143.98 11.31 32 . 2.55 430 830 2146.53 11.88 33 . 4.15 431 831 2150.68 12.35 34 TOE-RIPRAP 1.40 432 832 2152.08 12.84 35 TOP-RIPRAP 2.92 433 833 2155.00 12.67 36 BOLT RB JOIN 398-433 N50 58 38W 2154.997 VEDDER RIVER CROSS SECTION 8-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 10.60 1 DUMMY 2000.00 399 799 2000.00 10.60 2 PLOT REF XS8-1 25.96 400 800 2025.96 12.60 3 BOLT-LB 1.70 401 801 2027.66 12.62 4 EDGE-ROAD 1.76 402 802 2029.42 12.39 5 TOP-RIPRAP 1.37 403 803 2030.78 11.64 6 TOE-RIPRAP 4.21 404 804 2034.99 11.77 7 . 7.00 405 805 2042.00 11.72 8 . 3.21 406 806 2045.20 11.10 9 . 2.33 407 807 2047.53 9.77 10 WL 0.86 408 808 2048.39 9.27 11 . 1.64 409 809 2050.03 9.27 12 . 1.93 410 810 2051.96 9.70 13 . 5.01 411 811 2056.98 9.78 14 WL-BAR 3.24 412 812 2060.22 10.01 15 BAR 11.91 413 813 2072.13 9.77 16 BAR 8.53 414 814 2080.66 9.47 17 WL-BAR-1443HRS 6.59 415 815 2087.24 9.17 18 . 4.56 416 816 2091.81 8.77 19 . 0.88 417 817 2092.69 8.63 20 . 2.43 418 818 2095.12 8.50 21 . 3.35 419 819 2098.47 8.25 22 . 2.32 420 820 2100.80 7.96 23 . 2.70 421 821 2103.50 7.75 24 . 1.70 422 822 2105.19 8.04 25 . 1.66 423 823 2106.86 8.82 26 . 1.94 424 824 2108.80 9.60 27 WL-RB 2.38 425 825 2111.18 11.31 28 . VEDDER RIVER CROSS SECTION 8-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.09 426 826 2113.27 12.29 29 TOP-RIPRAP 2.72 427 827 2116.00 12.18 30 BOLT RB JOIN 398-427 N71 41 36W 2115.996 VEDDER RIVER CROSS SECTION 8 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 10.60 1 DUMMY 2000.00 399 799 2000.00 10.60 2 PLOT REF XS8 149.32 400 800 2149.32 11.97 3 BOLT-LB 1.72 401 801 2151.04 12.05 4 EDGE-ROAD 2.70 402 802 2153.74 11.97 5 TOP-RIPRAP 1.65 403 803 2155.39 10.94 6 . 2.09 404 804 2157.48 9.41 7 TOE-RIPRAP 3.85 405 805 2161.33 9.36 8 WL-LB-1459HRS 4.01 406 806 2165.34 9.12 9 . 1.88 407 807 2167.22 8.22 10 . 0.68 408 808 2167.91 8.02 11 . 1.17 409 809 2169.08 7.76 12 . 1.41 410 810 2170.49 7.77 13 . 2.23 411 811 2172.72 7.98 14 . 1.25 412 812 2173.97 8.09 15 . 1.55 413 813 2175.52 8.13 16 . 2.02 414 814 2177.53 8.25 17 . 3.32 415 815 2180.86 8.38 18 . 2.84 416 816 2183.70 8.40 19 . 3.89 417 817 2187.59 8.47 20 . 4.81 418 818 2192.40 8.71 21 . 2.35 419 819 2194.75 8.82 22 . 4.40 420 820 2199.15 8.96 23 . 5.80 421 821 2204.95 9.13 24 . 6.65 422 822 2211.60 9.09 25 TOE-RIPRAP 0.86 423 823 2212.46 9.38 26 WL-RB 2.50 424 824 2214.96 11.29 27 . 1.43 425 825 2216.39 12.17 28 TOP-RIPRAP VEDDER RIVER CROSS SECTION 8 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.33 426 826 2217.73 11.94 29 EDGE-ROAD 2.27 427 827 2219.99 12.05 30 BOLT RB JOIN 398-427 N59 31 48W 2219.995 VEDDER RIVER CROSS SECTION 7 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 398 798 0.00 10.10 1 DUMMY 2000.00 399 799 2000.00 10.10 2 PLOT REF XS7 161.63 400 800 2161.63 11.73 3 BOLT-LB 1.99 401 801 2163.62 11.75 4 EDGE-ROAD 0.94 402 802 2164.56 11.68 5 TOP-RIPRAP 2.09 403 803 2166.65 10.46 6 . 1.40 404 804 2168.06 9.34 7 WL-LB-1519HRS 1.99 405 805 2170.04 7.99 8 TOE-RIPRAP 0.29 406 806 2170.34 8.08 9 . 1.79 407 807 2172.13 8.23 10 . 3.25 408 808 2175.37 8.17 11 . 2.95 409 809 2178.32 8.05 12 . 4.21 410 810 2182.53 7.96 13 . 3.12 411 811 2185.65 7.91 14 . 3.13 412 812 2188.78 7.92 15 . 4.56 413 813 2193.34 7.96 16 . 3.64 414 814 2196.98 8.16 17 . 5.31 415 815 2202.29 8.45 18 . 4.21 416 816 2206.50 8.71 19 . 3.61 417 817 2210.11 8.93 20 . 10.11 418 818 2220.22 9.34 21 WL-RB 12.13 419 819 2232.34 10.01 22 . 10.88 420 820 2243.22 10.92 23 . 11.52 421 821 2254.74 11.35 24 . 3.12 422 822 2257.86 10.90 25 . 3.28 423 823 2261.14 11.17 26 . 2.53 424 824 2263.67 11.05 27 TOP 0.20 425 825 2263.87 10.52 28 BOLT RB JOIN 398-425 N38 41 48W 2263.873 VEDDER RIVER CROSS SECTION 7 MARCH 1990 INPUT LISTING VEDDER RIVER CROSS SECTION 6 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 498 898 0.00 9.60 1 DUMMY 2000.00 499 899 2000.00 9.60 2 PLOT REF XS6 53.20 500 900 2053.20 10.37 3 BOLT LB 10.20 501 901 2063.40 10.73 4 C/L-ROAD 6.04 502 902 2069.44 10.76 5 TOP 6.84 503 903 2076.28 9.11 6 WL-BACKCHANNEL 1.83 504 904 2078.11 8.94 7 . 4.60 505 905 2082.72 9.03 8 . 1.59 506 906 2084.30 8.54 9 . 2.06 507 907 2086.36 8.41 10 . 2.85 508 908 2089.21 8.84 11 . 1.05 509 909 2090.26 9.11 12 WL-BACKCHANNEL 2.58 510 910 2092.84 9.90 13 . 7.77 511 911 2100.61 10.90 14 . 10.60 512 912 2111.20 11.16 15 . 6.28 513 913 2117.49 10.65 16 . 2.78 514 914 2120.27 9.14 17 WL-LB-1617HRS 0.45 515 915 2120.72 8.45 18 . 2.43 516 916 2123.15 7.98 19 . 1.40 517 917 2124.56 8.37 20 . 1.70 518 918 2126.25 8.57 21 . 2.64 519 919 2128.90 8.54 22 . 2.27 520 920 2131.17 8.52 23 . 2.60 521 921 2133.76 8.49 24 . 1.72 522 922 2135.49 8.48 25 . 1.71 523 923 2137.20 8.47 26 . 2.80 524 924 2140.00 8.48 27 . 2.79 525 925 2142.79 8.44 28 . VEDDER RIVER CROSS SECTION 6 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.50 526 926 2146.30 8.35 29 . 2.99 527 927 2149.28 8.18 30 . 1.48 528 928 2150.76 8.17 31 . 2.33 529 929 2153.09 8.19 32 . 4.15 530 930 2157.24 8.32 33 . 3.86 531 931 2161.10 8.32 34 . 4.71 532 932 2165.80 8.39 35 . 2.62 533 933 2168.43 8.37 36 . 3.03 534 934 2171.45 8.53 37 . 3.48 535 935 2174.93 8.70 38 . 4.86 536 936 2179.79 8.89 39 . 4.10 537 937 2183.89 9.07 40 . 3.09 538 938 2186.98 9.15 41 WL-RB 12.32 539 939 2199.30 9.24 42 . 3.04 540 940 2202.34 9.88 43 . 3.34 541 941 2205.68 10.31 44 TOP 0.30 542 942 2205.98 9.57 45 BOLT RB JOIN 498-542 N22 26 08W 2205.978 VEDDER RIVER CROSS SECTION 5 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 498 898 0.00 9.10 1 DUMMY 2000.00 499 899 2000.00 9.10 2 PLOT REF XS5 15.43 500 900 2015.43 12.45 3 C/L DYKE 2.24 501 901 2017.66 12.35 4 TOP-DYKE 1.19 502 902 2018.86 12.02 5 NEWBOLT LB(1990) 7.46 503 903 2026.31 9.61 6 TOE 23.49 504 904 2049.80 10.01 7 . 13.83 505 905 2063.63 10.38 8 . 9.46 506 906 2073.09 9.83 9 . 7.04 507 907 2080.13 9.84 10 . 2.62 508 908 2082.75 10.13 11 . 18.81 509 909 2101.57 10.47 12 . 2.85 510 910 2104.42 10.09 13 . 7.71 511 911 2112.13 10.43 14 . 7.46 512 912 2119.58 10.28 15 . 12.16 513 913 2131.74 9.74 16 . 2.38 514 914 2134.12 10.08 17 . 4.94 515 915 2139.07 10.31 18 TOP-RIPRAP 5.76 516 916 2144.83 8.96 19 WL-LB 2.36 517 917 2147.19 7.95 20 . 1.40 518 918 2148.59 7.40 21 . 3.00 519 919 2151.59 6.26 22 . 2.24 520 920 2153.83 6.54 23 . 2.04 521 921 2155.87 6.82 24 . 1.22 522 922 2157.09 7.19 25 . 1.65 523 923 2158.74 7.84 26 . 1.92 524 924 2160.66 8.10 27 . 1.46 525 925 2162.12 8.20 28 . VEDDER RIVER CROSS SECTION 5 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.47 526 926 2164.58 8.53 29 . 3.51 527 927 2168.09 8.35 30 . 4.84 528 928 2172.93 8.70 31 . 5.05 529 929 2177.98 8.30 32 . 1.81 530 930 2179.79 8.05 33 . 2.82 531 931 2182.61 7.68 34 . 2.73 532 932 2185.33 7.55 35 . 3.78 533 933 2189.11 7.75 36 . 1.81 534 934 2190.93 8.07 37 . 2.85 535 935 2193.77 8.49 38 . 2.86 536 936 2196.63 8.82 39 . 2.14 537 937 2198.77 8.98 40 WL-RB-1714 10.47 538 938 2209.25 9.70 41 . 7.31 539 939 2216.56 10.00 42 . 3.37 540 940 2219.93 10.13 43 TOP 0.04 541 941 2219.96 9.74 44 FED. PIN RB JOIN 498-541 N16 31 59W 2219.963 VEDDER RIVER CROSS SECTION 4 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 457 857 0.00 8.90 1 DUMMY 2000.00 456 856 2000.00 8.90 2 PLOT REF XS4 0.90 455 855 2000.90 9.35 3 . 1.65 454 854 2002.55 8.97 4 FENCELINE 1.89 453 853 2004.44 9.22 5 . 2.33 452 852 2006.77 9.02 6 FLOOD-AREA 3.31 451 851 2010.09 9.60 7 . 3.21 450 850 2013.29 9.69 8 TOE 0.30 449 849 2013.59 10.17 9 BOLT LB 2.60 448 848 2016.20 9.95 10 . 2.68 447 847 2018.87 10.15 11 . 0.98 446 846 2019.85 9.88 12 . 1.72 445 845 2021.57 9.85 13 . 1.01 444 844 2022.58 9.27 14 . 1.25 443 843 2023.83 8.98 15 . 2.67 442 842 2026.50 9.37 16 . 0.58 441 841 2027.08 8.85 17 WL-LB 1.00 440 840 2028.08 7.45 18 . 0.86 439 839 2028.94 7.37 19 . 1.58 438 838 2030.52 7.59 20 . 1.35 437 837 2031.87 7.42 21 . 1.82 436 836 2033.70 7.65 22 . 2.71 435 835 2036.41 7.62 23 . 3.43 434 834 2039.84 7.72 24 . 2.84 433 833 2042.68 7.80 25 . 3.09 432 832 2045.77 7.83 26 . 4.06 431 831 2049.83 7.82 27 . 3.58 430 830 2053.41 7.85 28 . VEDDER RIVER CROSS SECTION 4 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.65 429 829 2057.06 7.91 29 . 3.18 428 828 2060.24 7.88 30 . 2.92 427 827 2063.16 7.85 31 . 3.83 426 826 2067.00 7.85 32 . 1.95 425 825 2068.95 7.95 33 . 2.74 424 824 2071.69 8.06 34 . 1.70 423 823 2073.39 8.17 35 . 1.86 422 822 2075.25 8.20 36 . 1.61 421 821 2076.86 8.16 37 . 1.31 420 820 2078.16 8.04 38 . 1.88 419 819 2080.04 7.99 39 . 1.39 418 818 2081.44 8.04 40 . 0.90 417 817 2082.34 8.48 41 . 1.19 416 816 2083.53 8.53 42 . 1.21 415 815 2084.73 8.17 43 . 1.40 414 814 2086.14 8.85 44 WL-RB-0856HRS 2.85 413 813 2088.99 9.66 45 . 3.09 412 812 2092.08 9.90 46 . 6.09 411 811 2098.17 9.93 47 . 5.47 410 810 2103.63 9.80 48 . 7.69 409 809 2111.33 9.80 49 . 5.83 408 808 2117.16 9.52 50 . 5.67 407 807 2122.83 8.95 51 . 3.64 406 806 2126.47 8.86 52 . 4.42 405 805 2130.88 8.92 53 . 2.52 404 804 2133.40 9.08 54 . 3.12 403 803 2136.52 9.40 55 TOE 1.40 402 802 2137.92 10.16 56 . VEDDER RIVER CROSS SECTION 4 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.36 401 801 2139.28 10.41 57 TOP 1.27 400 800 2140.54 10.37 58 BOLT-RB JOIN 457-400 N10 08 58W 2140.543 VEDDER RIVER CROSS SECTION 3-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 456 856 0.00 9.20 1 DUMMY 2000.00 455 855 2000.00 9.20 2 PLOT REF XS3-1 5.03 454 854 2005.03 9.55 3 . 1.16 453 853 2006.19 9.63 4 TOP 0.10 452 852 2006.29 9.41 5 REBAR LB 0.10 451 851 2006.39 9.63 6 TOP 1.91 450 850 2008.30 9.67 7 TOP 1.95 449 849 2010.25 9.10 8 . 1.50 448 848 2011.75 8.12 9 WL-BACKCHANNEL 1.36 447 847 2013.11 7.84 10 . 2.12 446 846 2015.23 7.85 11 . 3.34 445 845 2018.57 7.91 12 . 4.04 444 844 2022.61 7.73 13 . 2.68 443 843 2025.30 7.81 14 . 1.62 442 842 2026.91 8.11 15 WL-BACKCHANNEL 0.27 441 841 2027.18 8.71 16 TOP-BACKCHANNEL 8.57 440 840 2035.75 9.00 17 . 14.39 439 839 2050.14 9.33 18 . 8.78 438 838 2058.92 9.17 19 . 2.77 437 837 2061.70 8.62 20 . 2.07 436 836 2063.76 8.52 21 WL-LB-0951HRS 1.81 435 835 2065.57 8.08 22 . 3.70 434 834 2069.27 8.00 23 . 4.24 433 833 2073.51 7.95 24 . 4.96 432 832 2078.47 7.93 25 . 5.47 431 831 2083.94 7.89 26 . 5.28 430 830 2089.22 7.90 27 . 5.05 429 829 2094.27 7.82 28 . VEDDER RIVER CROSS SECTION 3-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.85 428 828 2098.12 7.80 29 . 4.38 427 827 2102.50 7.79 30 . 4.41 426 826 2106.91 7.88 31 . 3.26 425 825 2110.17 7.87 32 . 3.50 424 824 2113.67 7.86 33 . 2.78 423 823 2116.45 7.91 34 . 2.69 422 822 2119.13 7.85 35 . 6.19 421 821 2125.32 8.01 36 . 7.46 420 820 2132.79 8.30 37 . 7.79 419 819 2140.58 8.50 38 TOP-RAPIDS-WL-RB 12.79 418 818 2153.37 7.93 39 TOE-RAPPIDS 5.82 417 817 2159.19 8.04 40 . 2.91 416 816 2162.10 7.64 41 . 1.75 415 815 2163.85 8.25 42 . 11.92 414 814 2175.77 9.26 43 . 2.01 413 813 2177.78 8.99 44 . 8.08 412 812 2185.85 9.03 45 . 4.00 411 811 2189.85 8.55 46 . 3.91 410 810 2193.76 9.69 47 . 1.85 409 809 2195.61 9.45 48 . 2.60 408 808 2198.20 9.79 49 G/L-AT-BOLT RB 2.51 407 807 2200.72 9.70 50 . 1.06 406 806 2201.78 9.36 51 . 4.25 405 805 2206.03 9.52 52 . 1.50 404 804 2207.53 9.10 53 . 2.52 403 803 2210.06 9.18 54 . 4.55 402 802 2214.61 9.06 55 TOE 0.96 401 801 2215.57 9.53 56 EDGE-ROAD VEDDER RIVER CROSS SECTION 3-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.34 400 800 2217.90 9.59 57 C/L-ROAD JOIN 456-400 N00 44 16W 2217.901 VEDDER RIVER CROSS SECTION 3 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 450 850 0.00 8.70 1 DUMMY 2000.00 449 849 2000.00 8.70 2 PLOT REF XS3 2.00 448 848 2002.00 9.19 3 G/L BOLT LB 1.71 447 847 2003.71 9.27 4 . 0.21 446 846 2003.93 9.26 5 C/L-ROAD 1.53 445 845 2005.46 9.00 6 C/L-ROAD 4.67 444 844 2010.13 9.02 7 . 2.12 443 843 2012.25 7.34 8 . 2.13 442 842 2014.37 7.69 9 . 1.29 441 841 2015.66 8.24 10 . 5.81 440 840 2021.47 8.08 11 . 10.35 439 839 2031.82 8.23 12 . 5.11 438 838 2036.93 7.72 13 . 2.42 437 837 2039.34 7.74 14 WL BACKCHANNEL 2.07 436 836 2041.42 8.41 15 . 4.09 435 835 2045.51 9.00 16 . 9.13 434 834 2054.63 9.25 17 . 6.77 433 833 2061.41 8.98 18 . 5.86 432 832 2067.27 8.14 19 . 4.83 431 831 2072.09 8.10 20 . 5.45 430 830 2077.55 8.67 21 . 12.26 429 829 2089.80 8.44 22 . 1.59 428 828 2091.39 8.85 23 . 8.25 427 827 2099.65 8.84 24 . 3.09 426 826 2102.74 8.61 25 . 2.09 425 825 2104.83 8.23 26 . 7.97 424 824 2112.80 8.04 27 . 7.63 423 823 2120.43 7.93 28 . VEDDER RIVER CROSS SECTION 3 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.93 422 822 2128.37 8.01 29 . 2.18 421 821 2130.55 8.28 30 . 8.93 420 820 2139.48 8.18 31 . 2.26 419 819 2141.74 7.97 32 WL-1031 1.90 418 818 2143.64 7.41 33 . 2.46 417 817 2146.11 7.18 34 . 3.43 416 816 2149.54 7.14 35 . 4.18 415 815 2153.71 7.24 36 . 5.67 414 814 2159.39 7.21 37 . 5.40 413 813 2164.79 7.31 38 . 5.03 412 812 2169.81 7.25 39 . 1.25 411 811 2171.06 6.82 40 . 1.46 410 810 2172.53 6.66 41 . 2.39 409 809 2174.92 6.70 42 . 2.71 408 808 2177.63 6.82 43 . 3.31 407 807 2180.94 6.49 44 . 1.60 406 806 2182.55 6.38 45 . 2.27 405 805 2184.82 6.14 46 1.80 DP 2.07 404 804 2186.89 6.84 47 . 0.41 403 803 2187.30 7.91 48 WL 2.49 402 802 2189.79 7.87 49 . 1.16 401 801 2190.95 9.01 50 . 5.51 400 800 2196.46 9.12 51 BOLT RB JOIN 450-400 N15 25 39W 2196.461 VEDDER RIVER CROSS SECTION 2-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 537 937 0.00 9.40 1 DUMMY 2000.00 536 936 2000.00 9.40 2 PLOT REF XS2-1 199.89 535 935 2199.89 8.57 3 BOLT LB 5.49 534 934 2205.38 8.43 4 TOP 2.30 533 933 2207.68 7.10 5 WL-BACKCHANNEL 1.58 532 932 2209.26 6.26 6 TOE-RIPRAP 1.52 531 931 2210.79 6.29 7 . 1.35 530 930 2212.14 6.41 8 . 1.40 529 929 2213.54 6.99 9 WL 7.24 528 928 2220.78 7.00 10 . 4.60 527 927 2225.38 7.10 11 . 2.53 526 926 2227.91 7.86 12 . 9.76 525 925 2237.67 8.00 13 . 12.57 524 924 2250.25 7.99 14 . 2.31 523 923 2252.55 8.47 15 . 20.29 522 922 2272.84 8.50 16 . 15.17 521 921 2288.01 8.33 17 . 4.96 520 920 2292.97 8.15 18 . 2.59 519 919 2295.56 8.36 19 . 11.05 518 918 2306.61 8.47 20 . 1.67 517 917 2308.28 7.89 21 . 2.30 516 916 2310.58 7.65 22 WL-LB 3.20 515 915 2313.77 7.48 23 . 1.75 514 914 2315.53 6.87 24 . 3.39 513 913 2318.91 6.52 25 . 3.63 512 912 2322.54 6.50 26 . 3.29 511 911 2325.83 6.41 27 . 2.26 510 910 2328.08 6.32 28 . VEDDER RIVER CROSS SECTION 2-1 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.14 509 909 2331.23 6.17 29 . 2.88 508 908 2334.10 6.09 30 . 3.97 507 907 2338.07 5.89 31 . 3.26 506 906 2341.33 5.78 32 . 2.10 505 905 2343.43 5.73 33 . 1.65 504 904 2345.08 6.46 34 . 1.17 503 903 2346.25 7.63 35 WL-RB-1102HRS 0.91 502 902 2347.16 8.70 36 . 2.16 501 901 2349.32 9.44 37 TOP-RIPRAP 4.65 500 900 2353.97 9.64 38 BENT-BOLT-RB JOIN 537-500 N13 18 51W 2353.970 VEDDER RIVER CROSS SECTION 2 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 531 931 0.00 7.80 1 DUMMY 2000.00 530 930 2000.00 7.80 2 PLOT REF XS2 50.66 529 929 2050.66 8.38 3 BOLT LB 2.37 528 928 2053.02 8.48 4 TOP 0.78 527 927 2053.80 7.99 5 WL 0.94 526 926 2054.74 7.05 6 . 1.39 525 925 2056.13 6.58 7 . 5.14 524 924 2061.27 6.58 8 . 4.69 523 923 2065.96 6.49 9 . 7.39 522 922 2073.35 6.62 10 . 1.30 521 921 2074.65 7.04 11 WL-BACKCHANNEL 1.76 520 920 2076.41 7.50 12 . 13.02 519 919 2089.43 7.90 13 . 18.54 518 918 2107.97 8.05 14 . 4.61 517 917 2112.59 7.67 15 . 17.56 516 916 2130.15 7.39 16 . 11.99 515 915 2142.14 7.18 17 WL-LB 5.24 514 914 2147.38 6.82 18 . 2.16 513 913 2149.54 6.54 19 . 1.56 512 912 2151.10 6.21 20 . 2.26 511 911 2153.36 5.84 21 . 1.86 510 910 2155.21 5.97 22 . 4.32 509 909 2159.53 6.21 23 . 2.86 508 908 2162.39 6.47 24 . 3.44 507 907 2165.82 6.79 25 . 4.11 506 906 2169.93 7.06 26 . 7.94 505 905 2177.88 7.12 27 . 7.05 504 904 2184.93 7.17 28 . VEDDER RIVER CROSS SECTION 2 MARCH 1990 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.53 503 903 2190.46 7.28 29 . 1.19 502 902 2191.65 7.55 30 WL-RB-1123HRS 3.07 501 901 2194.72 8.93 31 TOP-RIPRAP 3.81 500 900 2198.53 9.08 32 BOLT RB JOIN 531-500 N22 55 23W 2198.530