THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. TELKWA RIVER X/S 1 PROJ#76FDC18 JULY 19 1979 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 71141 0.00 507.23 1 DUMMY 2000.00 71140 2000.00 507.23 2 RR GRADE 9.99 71139 2009.99 508.39 3 ON SLOPE 6.20 71138 2016.18 507.29 4 TOE SLOPE 1.50 71137 2017.69 506.68 5 REBAR LB 1.10 71136 2018.79 506.32 6 . 1.00 71135 2019.78 506.46 7 TOE ABUT 0.20 71134 2019.99 506.96 8 TOP ABUT 0.60 71133 2020.59 506.94 9 TOP 0.14 71132 2020.73 505.32 10 TOE ABUT 1.42 71131 2022.15 505.04 11 TOP 0.26 71130 2022.41 504.15 12 RIPRAP/ABUT 1.97 71129 2024.38 503.44 13 RIPRAP 2.21 71128 2026.59 502.73 14 WL LB 0.78 71127 2027.38 502.56 15 . 0.66 71126 2028.04 502.14 16 . 1.28 71125 2029.32 502.12 17 . 2.50 71124 2031.82 502.18 18 . 5.00 71123 2036.82 501.91 19 . 5.00 71122 2041.82 501.72 20 . 5.00 71121 2046.82 501.88 21 . 5.00 71120 2051.82 501.60 22 . 5.00 71119 2056.82 501.60 23 . 5.00 71118 2061.82 501.88 24 . 5.00 71117 2066.82 502.03 25 . 5.00 71116 2071.82 502.03 26 . 5.00 71115 2076.82 501.66 27 . 5.00 71114 2081.82 502.09 28 . 2.50 71113 2084.32 502.18 29 . 1.43 71112 2085.75 502.51 30 . 1.07 71111 2086.82 502.79 31 WL RB 0.58 71110 2087.41 503.17 32 . 1.52 71109 2088.93 503.71 33 RIPRAP 0.01 71108 2088.94 503.89 34 TOP 0.15 71107 2089.09 503.91 35 TOE 0.10 71106 2089.19 505.33 36 TOP SUPPORT BLK 1.50 71105 2090.69 505.38 37 TOE ABUT 0.10 71104 2090.78 507.22 38 TOP 0.80 71103 2091.58 507.22 39 TOP ABUT 0.10 71102 2091.68 506.80 40 . 2.20 71101 2093.88 506.80 41 REBAR RB 47.08 71100 2140.96 507.39 42 AT RR FLAT BEYON END TELKWA RIVER X/S 2 PROJ#76FDC18 APRIL 9 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 72143 0.00 514.27 1 DUMMY 2000.00 72142 2000.00 514.27 2 TOP FLAT BEYOND 9.66 72141 2009.66 507.91 3 TOE BANK 41.01 72140 2050.68 507.96 4 . 27.21 72139 2077.88 507.89 5 . 21.77 72138 2099.66 507.46 6 TOP 21.97 72137 2121.62 506.04 7 . 19.00 72136 2140.63 506.10 8 . 2.49 72135 2143.11 504.55 9 TOP BANK 3.50 72134 2146.61 503.81 10 WL LB 2.80 72133 2149.41 503.72 11 0.10D 2.20 72132 2151.62 503.24 12 0.50D 4.00 72131 2155.62 502.98 13 0.57D 2.80 72130 2158.42 503.02 14 0.55D 3.20 72129 2161.62 503.31 15 0.26D 2.80 72128 2164.41 503.39 16 . 3.40 72127 2167.81 503.82 17 . 7.21 72126 2175.02 504.27 18 . 11.10 72125 2186.11 504.85 19 . 12.70 72124 2198.81 504.82 20 TOP 2.02 72123 2200.83 504.19 21 . 3.79 72122 2204.62 503.65 22 . 1.51 72121 2206.13 503.13 23 . 3.40 72120 2209.54 502.73 24 0.1D 1.60 72119 2211.14 502.76 25 0.07D 1.50 72118 2212.63 502.78 26 0.14D 2.50 72117 2215.13 502.86 27 0.1D 1.50 72116 2216.63 503.09 28 . 3.50 72115 2220.13 503.74 29 . 8.30 72114 2228.42 503.72 30 . 12.19 72113 2240.62 503.88 31 . 7.70 72112 2248.31 503.95 32 . 1.80 72111 2250.11 504.52 33 . 4.60 72110 2254.71 504.79 34 REBAR RB 3.90 72109 2258.61 504.72 35 . 2.20 72108 2260.81 504.36 36 . 2.60 72107 2263.41 504.68 37 . 13.80 72106 2277.21 504.69 38 . 3.40 72105 2280.61 504.31 39 . 2.50 72104 2283.11 504.67 40 . 15.60 72103 2298.71 504.24 41 . 13.90 72102 2312.61 505.19 42 . 14.00 72101 2326.61 505.15 43 SPIKE 6.20 72100 2332.81 504.77 44 . 2.10 72099 2334.91 504.23 45 TOE 3.17 72098 2338.08 504.26 46 TOE BORROW PIT 3.18 72097 2341.26 505.84 47 ON SLOPE 9.61 72096 2350.87 509.70 48 SPIKE TOP DYKE 8.62 72095 2359.49 505.13 49 TOE DYKE 11.88 72094 2371.37 505.07 50 . 20.17 72093 2391.54 505.19 51 . 15.06 72092 2406.59 505.04 52 . 21.68 72091 2428.27 505.01 53 TOE 6.84 72090 2435.11 508.01 54 TOP BANK 56.03 72089 2491.14 507.74 55 TOE ROAD 4.72 72088 2495.86 508.65 56 TOP EDGE ROAD 8.01 72087 2503.87 508.73 57 TOP EDGE ROAD END TELKWA RIVER X/S 3 PROJ#76FDC18 APRIL 9 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 73152 0.00 518.92 1 DUMMY 2000.00 73151 2000.00 518.92 2 TOP BANK FLAT 9.67 73150 2009.67 514.04 3 ON SLOPE 8.09 73149 2017.76 510.49 4 TOE BANK 34.48 73148 2052.24 510.75 5 . 43.49 73147 2095.73 510.12 6 . 33.98 73146 2129.71 509.70 7 . 9.20 73145 2138.90 508.83 8 . 44.10 73144 2183.00 508.50 9 . 25.60 73143 2208.60 508.63 10 . 7.30 73142 2215.90 508.12 11 . 33.10 73141 2249.00 508.83 12 . 15.70 73140 2264.70 508.19 13 SPIKE 24.39 73139 2289.09 508.39 14 TOP 4.00 73138 2293.09 507.32 15 TOE 23.00 73137 2316.09 507.53 16 . 9.80 73136 2325.89 506.62 17 WL LB 6.10 73135 2331.99 505.98 18 . 5.30 73134 2337.29 505.90 19 D-1.0 7.90 73133 2345.19 506.60 20 . 15.40 73132 2360.59 507.31 21 . 12.70 73131 2373.29 507.38 22 . 13.80 73130 2387.09 508.02 23 . 5.10 73129 2392.19 507.14 24 C/L CHANNEL 4.40 73128 2396.59 507.02 25 TOE 1.20 73127 2397.79 507.77 26 TOP BANK 1.80 73126 2399.59 507.77 27 SPIKE 32.71 73125 2432.29 507.61 28 . 25.10 73124 2457.39 507.35 29 . 26.84 73123 2484.23 507.01 30 . 21.85 73122 2506.08 506.34 31 . 16.39 73121 2522.47 506.87 32 . 27.16 73120 2549.62 506.80 33 TOP 4.92 73119 2554.54 506.11 34 . 10.75 73118 2565.29 505.57 35 . 4.62 73117 2569.91 505.33 36 WL 5.17 73116 2575.08 505.56 37 0.8W 17.29 73115 2592.37 506.27 38 TOE BANK 1.78 73114 2594.14 506.99 39 NATURAL BOUNDARY 2.64 73113 2596.78 508.89 40 . 0.50 73112 2597.28 509.80 41 TOP BANK 2.30 73111 2599.58 509.70 42 REBAR RB 3.90 73110 2603.48 509.83 43 . 19.30 73109 2622.78 509.68 44 . 51.19 73108 2673.97 509.57 45 TOP DITCH 1.70 73107 2675.67 508.97 46 TOE DITCH 1.60 73106 2677.27 509.70 47 EDGE ROAD 8.80 73105 2686.07 509.69 48 EDGE ROAD 2.40 73104 2688.47 508.94 49 TOE DITCH 1.31 73103 2689.78 509.77 50 TOP DITCH 21.00 73102 2710.78 509.11 51 TOE 5.10 73101 2715.88 510.47 52 TOP 9.88 73100 2725.75 511.56 53 . END TELKWA RIVER X/S 4 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 74129 0.00 509.14 1 DUMMY 2000.00 74128 2000.00 509.14 2 FLAT TO POWER LN 7.50 74127 2007.50 509.33 3 TOP LB 2.51 74126 2010.01 508.21 4 WL LB 23.91 74125 2033.92 508.27 5 . 2.11 74124 2036.02 508.11 6 D-0.30 0.99 74123 2037.01 508.00 7 D-0.25 4.49 74122 2041.50 508.27 8 . 10.52 74121 2052.02 508.67 9 . 7.00 74120 2059.02 508.75 10 . 10.00 74119 2069.01 508.73 11 . 9.10 74118 2078.11 508.26 12 D-0.11W 6.41 74117 2084.53 508.00 13 D-0.20W 3.10 74116 2087.62 507.43 14 D-0.14W 3.39 74115 2091.02 507.62 15 D-0.40W 3.50 74114 2094.51 507.64 16 D-0.45W 3.50 74113 2098.01 507.81 17 D-0.26W 6.00 74112 2104.01 508.14 18 . 6.00 74111 2110.01 508.97 19 . 9.00 74110 2119.00 508.94 20 TOE 1.50 74109 2120.50 509.63 21 TOP 8.58 74108 2129.08 509.60 22 REBAR RB 7.50 74107 2136.58 509.48 23 . 29.90 74106 2166.48 509.69 24 . 23.00 74105 2189.48 508.96 25 TOP 2.49 74104 2191.97 507.81 26 TOP 13.01 74103 2204.98 507.99 27 TOE BACKCHANNEL 2.00 74102 2206.98 508.55 28 TOE 36.00 74101 2242.98 510.18 29 TOP 11.97 74100 2254.95 511.91 30 . END TELKWA RIVER X/S 5 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 75131 0.00 516.22 1 DUMMY 2000.00 75130 2000.00 516.22 2 RISING BEYOND 8.11 75129 2008.11 515.88 3 TOP 0.50 75128 2008.60 514.00 4 ON SLOPE 6.46 75127 2015.06 509.45 5 WL LB 1.07 75126 2016.13 508.54 6 D-0.75W 2.49 75125 2018.63 508.76 7 D-0.68W 4.91 75124 2023.54 509.07 8 D-0.4W 9.15 75123 2032.69 509.31 9 D-0.25W 9.80 75122 2042.48 509.52 10 WL RB 3.31 75121 2045.79 509.93 11 . 5.99 75120 2051.78 510.10 12 . 9.00 75119 2060.78 510.17 13 . 4.40 75118 2065.18 510.65 14 . 6.70 75117 2071.88 511.14 15 BOLT RB 6.10 75116 2077.98 510.68 16 . 14.00 75115 2091.98 511.10 17 . 18.00 75114 2109.98 510.85 18 . 5.50 75113 2115.48 510.11 19 . 7.40 75112 2122.87 510.80 20 . 6.10 75111 2128.97 510.61 21 . 19.81 75110 2148.78 510.69 22 . 6.20 75109 2154.98 509.40 23 TOE 2.00 75108 2156.98 509.67 24 TOE 3.50 75107 2160.48 510.67 25 . 20.50 75106 2180.98 510.44 26 TOP 3.00 75105 2183.98 507.89 27 . 4.00 75104 2187.98 507.99 28 TOE 8.00 75103 2195.98 509.34 29 . 8.00 75102 2203.98 509.74 30 . 15.00 75101 2218.98 510.14 31 . 8.50 75100 2227.48 510.80 32 . 55.00 75099 2282.48 510.80 33 3.00 75098 2285.48 512.80 34 TOP FLAT BEYOND END TELKWA RIVER X/S 6 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 76142 0.00 516.53 1 DUMMY 2000.00 76141 2000.00 516.53 2 . 7.00 76140 2007.00 515.39 3 TOE 20.87 76139 2027.86 514.13 4 . 15.89 76138 2043.75 514.29 5 . 4.20 76137 2047.95 512.26 6 . 3.00 76136 2050.95 513.18 7 . 19.50 76135 2070.45 513.49 8 . 18.00 76134 2088.45 513.08 9 . 5.90 76133 2094.35 511.72 10 . 12.10 76132 2106.45 512.56 11 . 7.20 76131 2113.65 512.84 12 . 12.30 76130 2125.95 513.18 13 SPIKE 10.30 76129 2136.25 513.22 14 TOP 2.50 76128 2138.75 511.99 15 TOE 5.52 76127 2144.27 512.13 16 . 4.52 76126 2148.79 511.45 17 . 3.50 76125 2152.29 511.37 18 . 5.99 76124 2158.28 511.03 19 D-0.20W 1.80 76123 2160.08 511.02 20 D-0.2W 4.21 76122 2164.29 510.80 21 D-0.48M 5.99 76121 2170.28 511.22 22 WL RB 3.01 76120 2173.29 512.12 23 . 12.29 76119 2185.58 512.55 24 . 29.70 76118 2215.28 512.77 25 . 30.23 76117 2245.51 512.87 26 . 20.82 76116 2266.33 512.46 27 . 2.51 76115 2268.85 512.00 28 . 6.58 76114 2275.43 511.74 29 . 8.49 76113 2283.92 511.88 30 . 1.90 76112 2285.81 512.55 31 . 4.99 76111 2290.81 512.17 32 . 7.01 76110 2297.82 511.95 33 . 4.83 76109 2302.65 514.41 34 TOP 3.70 76108 2306.35 514.40 35 BOLT RB 1.40 76107 2307.75 514.82 36 TOP 3.00 76106 2310.75 513.63 37 TOE DYKE 17.50 76105 2328.25 513.63 38 . 18.70 76104 2346.95 513.51 39 TOP 2.90 76103 2349.85 512.79 40 TOE 2.50 76102 2352.35 513.42 41 . 2.10 76101 2354.45 514.69 42 TOP 4.60 76100 2359.05 514.51 43 FLAT BEYOND END TELKWA RIVER X/S 7 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 77148 0.00 519.38 1 DUMMY 2000.00 77147 2000.00 519.38 2 ON SLOPE 8.05 77146 2008.05 514.35 3 TOE 5.50 77145 2013.55 514.75 4 . 14.50 77144 2028.05 514.71 5 . 12.50 77143 2040.55 514.73 6 . 3.50 77142 2044.06 513.60 7 . 8.20 77141 2052.26 513.62 8 . 4.30 77140 2056.56 514.06 9 . 13.50 77139 2070.06 514.39 10 . 12.00 77138 2082.05 513.79 11 . 15.70 77137 2097.75 514.26 12 . 9.60 77136 2107.35 514.30 13 . 7.70 77135 2115.05 514.33 14 SPIKE 3.00 77134 2118.05 514.64 15 . 1.50 77133 2119.55 513.89 16 . 9.20 77132 2128.76 514.31 17 . 2.31 77131 2131.07 513.74 18 . 16.70 77130 2147.77 514.02 19 . 12.30 77129 2160.07 514.07 20 . 19.00 77128 2179.07 514.18 21 . 3.02 77127 2182.08 513.55 22 . 13.83 77126 2195.91 513.10 23 . 11.15 77125 2207.06 512.95 24 . 6.36 77124 2213.42 512.14 25 . 4.05 77123 2217.46 512.12 26 . 6.60 77122 2224.07 512.66 27 . 8.51 77121 2232.58 512.45 28 . 5.50 77120 2238.07 512.64 29 . 4.39 77119 2242.47 512.81 30 . 7.10 77118 2249.57 512.63 31 . 2.45 77117 2252.02 512.77 32 . 3.03 77116 2255.05 514.37 33 TOP 8.00 77115 2263.05 514.20 34 . 8.00 77114 2271.05 514.02 35 TOP 1.56 77113 2272.61 513.04 36 TOE 5.37 77112 2277.98 512.93 37 TOE DIKE 1.89 77111 2279.87 513.84 38 . 3.58 77110 2283.46 515.18 39 EDGE DIKE 1.69 77109 2285.15 515.24 40 REBAR C/L DIKE 1.80 77108 2286.95 515.14 41 EDGE DIKE (TOP) 4.10 77107 2291.05 515.06 42 . 6.80 77106 2297.85 514.87 43 . 19.40 77105 2317.25 514.87 44 . 20.80 77104 2338.05 514.02 45 . 0.98 77103 2339.02 514.57 46 . 2.51 77102 2341.54 514.72 47 . 2.51 77101 2344.05 515.58 48 . 3.00 77100 2347.05 515.78 49 TOP SLOW RISE END TELKWA RIVER X/S 8 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 78122 0.00 523.24 1 DUMMY 2000.00 78121 2000.00 523.24 2 . 8.49 78120 2008.49 522.88 3 TOP 0.93 78119 2009.42 519.16 4 ON SLOPE 6.27 78118 2015.69 514.88 5 WL LB TOE 3.00 78117 2018.68 514.02 6 D-0.82 5.00 78116 2023.68 514.22 7 D-0.69 6.30 78115 2029.98 514.38 8 D-0.48 5.70 78114 2035.67 514.59 9 D-0.25 2.00 78113 2037.67 514.83 10 . 9.02 78112 2046.68 515.68 11 . 11.48 78111 2058.16 515.54 12 . 32.70 78110 2090.86 515.78 13 . 3.50 78109 2094.36 515.76 14 . 3.70 78108 2098.06 515.11 15 . 10.10 78107 2108.16 515.52 16 . 15.60 78106 2123.76 515.60 17 . 4.40 78105 2128.16 516.37 18 . 3.40 78104 2131.56 516.41 19 REBAR RB 31.30 78103 2162.86 516.57 20 . 22.80 78102 2185.66 515.71 21 . 10.49 78101 2196.15 516.63 22 . 28.51 78100 2224.66 516.16 23 . 178.00 78099 2402.66 516.16 24 TOE 3.00 78098 2405.66 518.16 25 TOP FLAT BEYOND END TELKWA RIVER X/S 9 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 79142 0.00 528.76 1 DUMMY 2000.00 79141 2000.00 528.76 2 . 7.56 79140 2007.56 528.31 3 TOP 12.50 79139 2020.06 518.56 4 TOE 23.00 79138 2043.06 518.18 5 . 8.00 79137 2051.06 519.01 6 . 8.00 79136 2059.06 518.38 7 . 13.50 79135 2072.56 518.92 8 . 13.50 79134 2086.06 519.05 9 . 2.80 79133 2088.86 518.20 10 . 8.90 79132 2097.76 517.65 11 . 8.00 79131 2105.76 517.68 12 . 5.40 79130 2111.16 518.38 13 . 8.90 79129 2120.07 518.33 14 . 16.20 79128 2136.26 518.28 15 . 4.80 79127 2141.06 518.89 16 SPIKE 4.70 79126 2145.76 518.96 17 . 5.10 79125 2150.86 517.92 18 TOE 16.10 79124 2166.96 518.09 19 TOP 1.55 79123 2168.51 517.06 20 TOE 14.62 79122 2183.13 516.85 21 . 3.98 79121 2187.11 516.28 22 . 6.21 79120 2193.31 517.22 23 . 20.52 79119 2213.83 517.48 24 . 15.67 79118 2229.50 517.21 25 . 9.31 79117 2238.82 516.85 26 . 9.20 79116 2248.02 516.52 27 . 6.25 79115 2254.27 516.53 28 D-0.40 9.14 79114 2263.41 516.39 29 D-0.50 6.15 79113 2269.56 516.34 30 D-0.55W 3.71 79112 2273.26 516.91 31 WL RB 2.20 79111 2275.46 517.57 32 . 5.70 79110 2281.16 519.35 33 REBAR RB 4.10 79109 2285.26 519.32 34 TOP 34.50 79108 2319.75 519.47 35 . 8.50 79107 2328.25 518.21 36 . 26.50 79106 2354.75 517.76 37 . 13.71 79105 2368.46 518.24 38 . 19.80 79104 2388.26 518.14 39 . 2.00 79103 2390.26 519.13 40 . 14.00 79102 2404.26 519.58 41 . 41.50 79101 2445.76 519.83 42 TOP 2.00 79100 2447.76 518.69 43 TOE SLOWLY DROP END TELKWA RIVER X/S 10 PROJ#76FDC18 APRIL 10 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 80127 0.00 524.34 1 DUMMY 2000.00 80126 2000.00 524.34 2 TOP FLAT BEYOND 13.09 80125 2013.09 520.32 3 TOE 20.49 80124 2033.59 520.71 4 . 9.41 80123 2042.99 520.20 5 NATURAL BOUNDARY 2.74 80122 2045.73 518.94 6 . 3.18 80121 2048.91 518.41 7 . 2.84 80120 2051.75 516.62 8 D-1.85 8.69 80119 2060.45 517.05 9 D-1.41 5.47 80118 2065.91 517.84 10 D-0.63 5.40 80117 2071.31 517.96 11 . 7.59 80116 2078.90 518.36 12 . 4.00 80115 2082.90 518.40 13 . 6.51 80114 2089.41 518.54 14 . 4.51 80113 2093.91 518.31 15 . 3.99 80112 2097.90 518.94 16 . 12.00 80111 2109.90 519.74 17 . 13.98 80110 2123.89 519.84 18 TOE 2.30 80109 2126.19 520.64 19 TOP BANK 7.80 80108 2133.99 520.79 20 REBAR RB 16.40 80107 2150.38 520.51 21 TOE 9.59 80106 2159.98 521.37 22 TOP 20.09 80105 2180.07 521.62 23 . 46.29 80104 2226.36 521.53 24 . 48.59 80103 2274.95 521.58 25 . 39.71 80102 2314.66 521.55 26 . 12.20 80101 2326.86 521.58 27 TOE 4.18 80100 2331.04 523.42 28 SLOW RISE BEYOND END