To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Variable density spacing was carried out within the RRZ's along portions of these S2 creeks in order to speed up riparian old growth/large stem development. This would be achieved by manipulating density and tree species diversity both vertical and horizontal, creating improved riparian habitat for a variety of species, windfirm the trees, create larger future stem diameters, predispose stems for larger future coarse woody debris, provide for increased future instream complexity, increase or maintain shrub and herb layers for wildlife forage, overland flow filtering and nesting habitat.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.