Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Oktwanch River site 3 2003 maintenance works as-built inspection report Goold, Des
2003
A
D
Abstract: In the summer of 2003, Western Forest Products Ltd. completed prescribed maintenance work on the Groundwater Channel and Backwater Channel at Site 3 of the Oktwanch River in order to address a sudden reduction to base flows entering the system. The work involved the following: removing riffles and lowering the invert of channels, to reconnect reaches that had become isolated from one another due to the reduction in base flows; and excavating refuge ponds to improve the survivability of fish survival during extended periods of dry weather.
 
Goold, Des. 2003. Oktwanch River site 3 2003 maintenance works as-built inspection report. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2003MR120
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Watershed, Management, British, Columbia, Riparian, Areas
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts