The project involved permanent deactivation of 3.5 km of road. The road is located above Beaver Inlet in TFL 47. The objectives of the work were to reduce the potential for soil erosion, sedimentation of fish streams, mass wasting, and to help restore hill slope hydrology. Values at risk included fish habitat and forest resources. The deactivated road crossed moderate to steep gradient slopes. Surficial materials consisted of a veneer to blanket of colluvial soil over bedrock. Pockets of a silty sand morainal soil were also present. The road was constructed with a bulldozer in the early 70?s. On steeper slopes 3/4 or full bench construction methods were used; all of the excavated material was sidecast or pushed into draws. Tension cracks and slumping were common along the edge of the road fill slopes. Several landslides had previously initiated from the road prism.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.