Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Deactivation of the M7 road system, Loup Creek drainage, South Island forest district: project completion abstract Weston, Scott
2004
A
D
Abstract: The M7 road system was constructed +30 years ago using bulldozer construction, as was common during that era. There had been road prism failures in several places along the road system. Prior to this project there was high potential for additional failures in the road prism and downslope. This project involved completing deactivation of a portion of the road system. This work was a continuation of work started in 2003 but suspended due to snowfall. The work was done to improve the road prism and downslope stability, and to return subsurface and surface runoff to pre-road conditions.
 
Weston, Scott. 2004. Deactivation of the M7 road system, Loup Creek drainage, South Island forest district: project completion abstract. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2004MR068
 
Topic: FLNRORD Research Program
Keywords: Sustainable, forest, management, Forest, Investment, Account, (FIA), Road, Construction, British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts