To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Integrated Woods Services Ltd. was commissioned by Weyerhaeuser Company Limited to complete a channel assessment on Whipsaw Creek watershed. The watershed, located south-west of Princeton, was previously divided into 3 sub-basins. The sub-basins include Whipsaw Creek Headwaters (sub-basin #109), Whipsaw Residual (sub-basin #107), and Lamont Creek (sub-basin #108) for a total area of 185.9 km2. These same sub-basins have been re-used as the foundation for the Reconnaissance Channel Assessment. The intent of the assessment is to review the current channel conditions and compare them to 2 previous assessments completed in 1999 by Henderson Consulting (Overview Hydrologic Assessment for the Whipsaw Creek Watershed: including Sub-basins # 107 and 109; and Overview Hydrologic Assessment of the Lamont Sub-basin (#108), prepared for Weyerhaeuser Canada LTD. by Henderson Environmental Consulting, March 1999.) The objectives of the Reconnaissance Channel Assessment were to: 1) Field assess the current stream channel conditions, 2) Assess the sensitivity of the stream channels to impacts from land-use activities, 3) Identify sediment sources within the sub-basins coupled to the streams, 4) Expand on previous assessments, 5) Determine the effects of the current harvesting.
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:
Scientific Name:
ISBN:
English Name:
Other Identifier:
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.