Pre-code culvert replacement DWB Forestry Services Ltd.
2005
A
D
Abstract: Specific objectives of this project include: 1. Hydrological assessment to determine structure size and configuration to accommodate Q100 flows and fish passage guidelines; Q100 flow calculations; General arrangement and configuration of the crossing structure. 2. Road Layout and Design and Site Plan; Site plan and design signed by a professional engineer. 3. Fisheries Habitat Assessment and Consultation; DFO/MoE approvals of the road layout and site plan designs; DFO/MoE approvals of any instream works associated for the construction planning and implementation of the associated construction works. Prepared by: DWB Forestry Services Ltd.
 
DWB Forestry Services Ltd.. 2005. Pre-code culvert replacement. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2005MR178
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA)