Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Post-deactivation monitoring of roads in the Boughey Bay area/TFL Forest Limited Roberts, Brian
2005
A
D
Abstract: Madrone Environmental Services Ltd. (Madrone) has completed a second, low-intensity post-works inspection of 22.9 km of road deactivation in the Boughey Bay area, TSA 37. The deactivation works had been completed in October 2003. Routine Effectiveness Evaluations (REEs) were completed by Michael Cullen Geotechnical the following November (2003) and by Madrone in September 2004. This 2005 post-works inspection is a follow-up to the 2003 and 2004 REEs. The majority of the assessed deactivation is successfully achieving the objectives of preventing mass wasting, limiting sedimentation into creeks, and re-establishing natural drainage networks.
 
Roberts, Brian. 2005. Post-deactivation monitoring of roads in the Boughey Bay area/TFL Forest Limited. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2005MR194
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA)
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts