Permanent deactivation including heavy pull-back, removal of culverts, and cross-ditching. The purpose of this project was to mitigate the hazard of landslides or significant erosion occurring from old logging roads listed above. These roads are located on steep terrain above Great Central Lake. Road fill failures along any section of these roads could produce sediment that could impact the fish habitat in Great Central Lake. The road conditions were visually evaluated and associated hazards at specific locations along each road were identified. From this evaluation a road deactivation prescription was prepared to mitigate the identified hazards. It was not within the project scope to assess the open slope conditions beyond the road right of way. The project is not located within a community watershed.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.