Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Pachena Tributary D1 culvert replacement project: project completion abstract Forest Investment Account (FIA)
2005
A
D

54K
Abstract: The primary purpose of this project was to facilitate fish passage through a poorly-performing culvert and to maintain existing culvert inlet control to preserve the wetted area for fish habitat above the road. Replacing the existing culverts with larger culverts at Tributary D1 to the Pachena River will also reduce the occurrence of flooding over the Bamfield Access Road by increasing the flow capacity across the road, further preserving fish habitat. [Jeff Sandford].
 
Forest Investment Account (FIA). 2005. Pachena Tributary D1 culvert replacement project: project completion abstract. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2005MR218
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA)
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts