Culvert Removal Bridge Installation Double Lake Integrated ProAction Corp. (IPAC)
2007
A
D
Abstract: The objective of this project is to remove two culverts on Road 20 FSR and replace with two bridges. These sites are located approximately 8.5 and 10 km on Road 20, TFL18 Timothy E. Hansler.
 
Integrated ProAction Corp. (IPAC), Canadian Forest Products Ltd.; Hansler, Timothy E.. 2007. Culvert Removal Bridge Installation Double Lake. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2007MR065
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Bridges, British, Columbia, Design, Construction