To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
To stop further erosion on Bend B on the left bank of the Phillips River. The purpose of this was twofold; prevent further destruction of the downstream spawning and rearing habitat, and to prevent further erosion on the left bank of the Phillips River at Bend B and protect the Phillips Mainline logging road from additional damage.
Michael Wright.
Wright, Michael C.. 2007. Phillips River mainline bank erosion Bend B 2006, Phillips River Watershed, Forest District. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2007MR084
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.