Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Harris Creek side-channel construction 2006-07 Pacheedaht First Nation
2007
A
D
Abstract: This is a cooperative project between DFO, MoTH and Teal Cedar. The project is to develop a relic side channel, tributary to Harris Creek, into overwintering habitat for juvenile salmonids based on site design work completed by DFO. Work planned for this year includes: Access development - funded by MoTH, RP to be assumed by Teal) and Excavation of channels and ponds - funded through Teal's FIA program. Previous work funded at this site under Teal's FIA program includes a detailed channel alignment survey, completed in fiscal 2003/2004 under PP# 6208012, and test pitting done in 2004/2005 under PP#6363005. Pacheedaht First Nation, Teal Jones Forest Ltd., Ministry of Transport and DFO.
 
Pacheedaht First Nation, Teal Jones Forest Ltd.; British Columbia Ministry of Transportation; Canada Department of Fisheries and Oceans. 2007. Harris Creek side-channel construction 2006-07. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2007MR100
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Channels, (Hydraulic, engineering)
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts