Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Fish Passage Culvert Installations-Sicily & Kitty Ann Arden, Shane
2007
A
D
Abstract: Site 9 - Road 20 - The objective at this site is to remove the existing culvert, which is a partial barrier to fish, and to replace it with a bridge, which will restore fish passage. Approximately 5,000 meters of habitat will be gained. Site 11 - Road 232 - At this site, the object is to remove the existing culvert, which is a full barrier to fish, and to replace it with a bridge which will provide for the passage of fish. Approximately 2,300 meters of habitat will be gained.
 
Arden, Shane. 2007. Fish Passage Culvert Installations-Sicily & Kitty Ann. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2007MR467
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts