Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Palmerston Channel Instream deVisser, Miranda
2008
A
D
Abstract: Instream works at the Palmerston Creek Bridge crossing began on September 12, 2007 and were completed on September 25, 2007. The work was carried out as per the prescription developed for the site with the exception of a few modifications. Due to the presence of pink salmon in the Eve watershed the lowering of the bed elevation could not be completed. Activities included constructing a 120 m long armoured berm downstream of the bridge, scalping the gravel bars upstream and downstream to present water level, and creating a new channel beneath the eastern half of the bridge.
 
deVisser, Miranda, Wright, Michael C.. 2008. Palmerston Channel Instream. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2008MR263
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts