To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
The project will focus on the implementation of completed prescriptions for high priority roads located on Mt. Elphinstone. The prescribed works are designed to:
1) protect the structural integrity of the existing roads;
2) establish a functioning and self maintaining drainage system through the removal of old non-functioning drainage structures (i.e. wood box culverts) and replace them with self maintaining well armored crossing and;
3) to manage water, soil erosion and control sediment through a series of cross drains and out-sloping of the roads. Planned environmental maintenance for the 2007/08 fiscal includes approximately 3485 meters of old road named Guy?s Gulch, Dude?s Bypass and Black Tower.
Marquis, David. 2008. Environmental Clean-up of old non-status roads and trails - Mt. Elphinstone. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2008MR271
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:
Scientific Name:
ISBN:
English Name:
Other Identifier:
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.