To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
The objective of this project was to replace the existing 3700mm x 2500mm closed metal pipe with an 18.288m steel girder/ timber deck bridge on columns located at ~ 3.2km on the Leo Keve (Leo Purvis) Forest Service Road. This work will ensure fish passage for all life stage present in the system.
British Columbia Timber Sales, Ecofor Consulting Ltd.. 2009. Project Completion Abstract For Culvert Replacement on Unnamed Tributary to Tchentlo Lake, Stuart River Watershed, Fort St James District, Northern Interior Forest Region. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2009MR069
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:
Scientific Name:
ISBN:
English Name:
Other Identifier:
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.