Stream Crossing Replacement D14 at 12.2km on the O?Cock FSR of the O?Cock River Watershed, Fort St. James Forest District, Northern Interior Forest Region British Columbia Timber Sales
2009
A
D
Abstract: This project replaces a barrier to fish passage at 12.2km on the O'Clock FSR in the Fort St. James Forest District. The pre-existing crossing was a 1200mm CMP with a large erodible fill on a Rainbow Trout stream withy high habitat value. The structure was replaced with a 3660x1919x29m arch on steel footing with proper armoring and sediment control measures over the area affecting the stream. The project is not located in a community watershed.
 
British Columbia Timber Sales, Ecofor Consulting Ltd.; Grainger, Karen L.. 2009. Stream Crossing Replacement D14 at 12.2km on the O?Cock FSR of the O?Cock River Watershed, Fort St. James Forest District, Northern Interior Forest Region. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2009MR071
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts