To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Fish Passage Culvert Inspection Procedures indentified this location as an upstream barrier to rainbow trout migration in 2001 with a score of 34. The culvert had been installed in the early 1970's and was undersized and perched. A hydrologic assessment and culvert design were completed in 2006/07 and the supply and installation of the bridge occured August 25-Sept 4, 2008.
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:
Scientific Name:
ISBN:
English Name:
Other Identifier:
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.