Installation of Fish passage structures at Whiterocks 20.5km & 23.25km/Bouleau FSR 22km Dick, Glen A.
2010
A
D
Abstract: The objectives of this project are 1. to improve fish Passage by backwatering the existing 2400 mm CSP crossing of Bouleau Stream (S2), a secondary tributary to Okanagan Lake. 2. the removal and replacement of two fish barrier culverts crossing of the north Lambly Creek at Whiterocks Main 20.5 km . The S3 stream is known to hold Rainbow Trout . The Stream is within a community watershed. 3. the removal and replacement of tone 1200 mm fish barrier culvert crossing of an unnamed tributary to the north Lambly Creek at Whiterocks Main 23.2 km . The S3 stream is known to have Rainbow Trout . The Stream is within a community watershed.
 
Dick, Glen A.. 2010. Installation of Fish passage structures at Whiterocks 20.5km & 23.25km/Bouleau FSR 22km. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2010MR233
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Land, Base, Investment, Program