Document Details
Title |
Fish Passage Restoration | ||||||
Author |
British Columbia Timber Sales | ||||||
Date |
2009 | ||||||
Abstract |
The objective of this project was to replace the existing 1600mm and 1000mm round corrugated steel pipes, at Site D3, with a 3660mmx1910mmx14mm mini span culvert on steel footings located at ~3.9km on the McLeod-Tsilcoh Forest Service Road and to replace the 900mm and 600mm round corrugated steel pipes, at Site D4, with a 12.192m steel girder/timber deck bridge on columns*footings located at ~ 5.8km on the McLeod-Tsilcoh Forest Service Road. This work will ensure fish passage for all life stages present in the system. | ||||||
Report Number |
FIA2009MR068 | ||||||
|
|||||||