Document Details

Title
Nimpkish EEVP Monitoring
Author
ALBY Systems Ltd.
Date
2008
Abstract
The instream portion of the Nimpkish Enhancing Environmental Values Program (EEVP), formerly the Watershed Restoration Program (WRP), began in the summer of 1995 with Overview and Level 1 assessments of the Kilpala, Lukwa, Davie and Yookwa sub-basins of the Nimpkish River. Level 2 prescriptions followed the Level 1 assessments and in 1997 construction of instream structures began in the Kilpala, Lukwa and Davie River sub-basins. Since 1997 construction has proceeded in fourteen sub-basins within the Nimpkish Watershed, funded by Forest Renewal B.C. (1995 -2001) and, more recently (since 2002), the Forest Investment Account (FIA). To date (March, 2008), seven hundred and eighty-seven individual structures have been built at fifty-four sites. The reference section of this report provides a complete listing of the technical documents produced for the instream portion of the Nimpkish River EEV Program since 1995. This report presents the results of the February/March 2008 Routine Effectiveness Evaluation (REE) of 247 structures at thirteen sites that were scheduled for monitoring (Table 1). 30% of all structures constructed since 1997 were monitored this year.
Report Number
FIA2008MR320
 
Title
View
Routine Effectiveness Evaluation 1
Routine Effectiveness Evaluation 2

EIRS Search Options

Useful Contacts