Document Details

Title
Brake Check Ecosystem Restoration Project
Author
Forsite Consultants Ltd.
Date
2010
Abstract
Works completed include thinning of the existing stand to 50 stems per hectare targeting the retention of Ponderosa pine and Douglas-fir trees over 30-cm DBH. All retained trees were pruned to a minimum height of 2.0 meters. All debris generated by project activites were burned on site.
Report Number
FIA2010MR170
 
Title
View
Project completion abstract
Brake Check ecosystem restoration prescription map

EIRS Search Options

Useful Contacts