Document Details

Title
Hydrological Assessment: Site Plan Development
Author
DWB Forestry Services Ltd.
Date
2007
Abstract
This project is to develop engineered site plans for the replacement of the high priority culvert crossings. Specific objectives of this project for each high priority crossing include: 1. Hydrological assessment to determine structure size and configuration to accomodate fish passage and Q100 flows. - Q100 flow calculations - General arrangement and configuration of the crossing structure 2. Crossing Site Plan and Crossing Layout - Site plan and design signed by a Professional Engineer - Deactiviation plans and prescriptions 3. Fisheries Consultation - DFO/MoE approvals of the Site Plans and designs - DFO/MoE approvals of any instream works related to the planning and implementation of the associated construction and/or deactivation works. DWB Forestry Services Limited.
Report Number
FIA2007MR017
 
Title
View
Site #14 - Plans
Site #27 - Plans
Site #60 - Plans
Site #67- Plans
Site #84 - Plans
Site #89 - Plans
Site #93 - Plans
Site #108 - Plans
Site #148 - Plans
Site #162 - Plans
Site #137 - Plans
Site #14 - Plans

EIRS Search Options

Useful Contacts