Document Details

Title
Lost Horse Lake Bridge Installation
Author
Foster, Michael
Date
2009
Abstract
A fish passage culvert assessment was completed by ForFish Consulting for BCTS Kamloops through Forsite's FIA project management on Septermber 14.2006. There was a damaged 600mm CMP installed at the stream crossing. The culvert was determined to be a low water barrier and a potentioal high water barrier to fish passage. The FPCI score for the crossing was 42.
Report Number
FIA2009MR106
 
Title
View
Project Completion Abstract
Project Completion Statement
Statement of Construction Conformance
Crossing Assurance Statement

EIRS Search Options

Useful Contacts