Document Details

Title
K1N - Manual Brushing
Author
TECO Natural Resource Group Ltd.
Date
2011
Abstract
Stratum 1B is a portion of a backlog block that is classified as P87 in RESULTS. A manual brushing treatment will be implemented on all 11.5 Ha of the Strata. Power saws will be used to remove the Aspen and Cottonwood. Results include a Quality Inspection report on manual brushing activities for opening 093J027-11 stratum 1B
Report Number
FIA2011MR043
 
Title
View
Quality inspection report
Stand Management Prescription

EIRS Search Options

Useful Contacts